- Strictly Confidential -

Slides:



Advertisements
Similar presentations
CCME, University of Newcastle upon Tyne Composites in Fire September, 2003 WELCOME Introduction to basic ideas of composites in fire WELCOME Introduction.
Advertisements

Marcelo M. Hirschler GBH International
Risk Assessment for Cultural Institutions: Fire Testing vs Computer Modeling Frederick W. Mowrer, Ph.D., P.E. Department of Fire Protection Engineering.
Summary of NFPA 101 Interior Finish Requirements
Marine, Railway and ground Transportation ACOUSTIC MATERIALS for.
The BCA is referred to as a 'performance based' code, describing acceptable Performance Requirements that buildings throughout Australia must meet.
Fire Safety of Road Vehicles Status and Trends Fire safety road vehicles Japan, September 2014 Presentation given at Tokyo September 2014.
1 Presentation to May 21, HighWater’s testing experience shows: (over 30 laptops) There is wide variability in how each burning behaves Personal.
Korea Research Results “Fire resistance test” Nov 17, 2014 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Lithium Metal and Lithium-ion Battery Packaging Development 2014.
STANDARDIZATION OF PROTECH  J.K.GUPTA, SCIENTIST ’C’, BIS.
Ensuring fire safety in buses Michael Försth, Asbjørn Hagerupsen, Jan Petzäll Informal document No. GRSG (95th GRSG, 21 – 24 October 2008 agenda.
Tests for Flammability of Plastic Materials for Parts in Devices and Appliances UL 94V The UL 94V flammability test consist to put in contact of the fire.
Fire Triangle FuelHeat Fire! Oxygen 1 st Stage: Incipient 1 st stage No visible flame Little smoke Is not yet self-sustaining According to the National.
Fire Requirements For Foam Plastic Insulation and WRBs in Exterior Walls Presented to By Jesse J. Beitel July 31, 2012.
Task 3.4. Validation of horizontal solutions Fire and mechanical characterization.
Task 3.4. Validation of horizontal solutions Fire and mechanical characterization.
Fire safety is an important business. You need to take proper precaution in order to prevent a fire. Yes, fire may be inevitable but if prepared, you can.
Proposal of Fire Resistance Test
Arguments to. ALARM REACTION TIME FURTHEST POINT TIME 20 Seconds 3m 17s/5m 12s.
Fire.
Concept Equipment design and manufacture fire testing instruments according to international test methods. Our range of products are used to test the fire.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
RANKING FLAMMABILITY OF AIRCRAFT MATERIALS USING MICROSCALE COMBUSTION CALORIMETRY Richard E. Lyon and Richard N. Walters* Fire Safety Branch AAR-440 FAA.
CVFD Training – Ventilation Practices
1 Fire risk assessment Samuel Nii Tettey (Ergonomist)
Presented to: International Aircraft Materials Fire Test Working Group, Atlantic City, NJ By: Robert Ian Ochs Date: Tuesday, October 21, 2008 Federal Aviation.
Review of Handbook Chapters Pat Cahill
Eurocode 1: Actions on structures – Part 1–2: General actions – Actions on structures exposed to fire Part of the One Stop Shop program Annex F (informative)
Using Desire to Learn (D2L) Course Syllabus Due dates Course contents Assignments: Upload through Desire to Learn (D2L) – Case Studies.
A comparative study of test methods for assessment of fire safety performance of bus interior materials Presentation at GRSG 97, October 20-23, 2009, Geneva.
Engineering Analysis of NFPA 285 Tested Assemblies
International Conference on Hydrogen Safety 2011 – San Francisco, 12 Sept 2011 Risk informed separation distances for hydrogen refuelling stations Frederic.
EVALUATION OF THERMAL RADIATION MODELS FOR FIRE SPREAD BETWEEN OBJECTS
School Bus Thermal Events: An increasing phenomenon?
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
Finish & Furniture Selection ID 234 Chapter 9 What is Regulated by Codes: Walls & Ceilings – Class A, B, C (flame spread/smoke) Floors – Class I & II.
CHARACTERIZATION OF THE FIRE AND FIRE SCENARIOS When the flame impacts the ceiling the effect of the fire is given by an impinging flux. A procedure has.
Fire Resistance of the Load Bearing Structure of High Bay and Instrument Halls Fire and Egress Safety Analysis of the Instrument Halls Björn Yndemark WSP.
Developing Fire Safety Assessments Future Considerations Fire and Materials Working Group March 4 – 5, 2009 Daniel Slaton, Boeing.
Office of Highway Safety Fire Cause and Propagation.
BING-TC CEN/TC88-WG6 PU boards Robert Walter 26/05/2009 BING 09/139.
NASP 2008 Annual Conference Subro Goes Hollywood! SUBRO GOES HOLLYWOOD NASP 2008 Annual Conference.
Aaron Nicholson Beca. by Aaron Nicholson C/VM2 Design vs Non C/VM2 Performance Based Design.
Federal Aviation Administration COMPOSITE MATERIAL FIRE FIGHTING Presented to:International Aircraft Materials Fire Test Working Group Köln, Germany Presented.
Japan Automobile Research Institute
Fire Blocking Requirements For All Buildings;
The 3 Types of Heat Transfer
Shanghai Research Institute of Building Sciences
SERVICES, LLC 1 1.
Influence of Selected Additives on Flammability
Fire properties under heat fluz
Structural Fire Engineering, October 2015, Dubrovnik, Croatia
Post-fire Structural Integrity of Composite Gratings for Offshore Platforms Fire Resistance and Fire Reaction of Bio-Composite Sandwiches for Building.
ICHS - October 2015 Jérôme Daubech
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S7 – Fire Detection and Alarm Systems Piergiacomo.
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S6 – Fire Control and Suppression provisions.
All Content © Ecomass, Ecomass. EconCoreProduces Honeycombs Designed with High-End Polymers EconCore produces honeycomb sandwich materials that.
FIRE EMERGENCY AWARENESS TRAINING AND FIRE EXINGUISHER USE
Fire Characteristics.
Risk informed separation distances for hydrogen refuelling stations
Risk informed separation distances for hydrogen refuelling stations
NON-PROFIT COMPANY FOR QUALITY CONTROL AND INNOVATION IN BULDING
- Strictly Confidential -
Basics of Chemistry and Firefighting
Behaviour of M2 & M3 general construction in case of Fire Event
AIRCRAFT FIRE REGULATIONS
Building construction and Gear
What to look at in fire engineering analysis
- Strictly Confidential -
Presentation transcript:

- Strictly Confidential - Regulation UNECE R118 Proposition of changes for annex 6 (horizontal burning rate) and annex 8 (vertical burning rate) - Strictly Confidential -

Actual regulation UNECE R118 : Tests methods Annex 6 (FMVSS 302, ISO 3795) Test to determine the horizontal burning rate of materials Products concerned : materials and composite materials installed in a horizontal position in the interior compartment and, insulation materials installed in a horizontal position in the engine compartment and any separate heating compartment. Test result OK if the horizontal burning rate is not more than 100 mm/minute or if the flame extinguishes before reaching the last measuring point. Annex 8 (ISO 6941) Test to determine the vertical burning rate of materials materials and composite materials installed in a vertical position in the interior compartment, insulation materials installed in a vertical position in the engine compartment and any separate heating compartment. Test result OK if the vertical burning rate is not more than 100 mm/minute or if the flame extinguishes before the destruction of one of the first marker threads occurred. Ignition source type lighter  Application time of flame during 5 or 15s  Small dimensions of samples

Actual regulation UNECE R118 : Analysis These methods are small-scale methods capable of evaluating only the flammability of materials and not the quantity of heat energy or the spread of fire. FMVSS 302 (1972) and ISO 3795 (1989) are very old test methods. ISO 6941 is a test method developed for the textiles products and not really adapted to the rigid products, especially plastics. These small ignition sources does not represent the reality of a large thermal attack (fire in the engine compartment or tires fire for example), only a small attack in a passenger compartment. No smoke density and toxicity evaluation. Quick and cheap tests, inte.

Proposition for Regulation UNECE R118 For us it’s necessary to add a new test method with an ignition initiated by a large radiant heat exposure for all the products.  In fact it’s already possible to use such a test method ISO 5658-2 only for the products installed in a vertical position instead of ISO 6941.  In the same approach, for the products installed in horizontal position we propose to use the standard EN ISO 9239-1. These 2 test methods are proven and already used in other applications :  Railway (products in a vertical position) and Maritime (all the products) for ISO 5658-2  Railway (products in horizontal position) and Building (Floorcoverings) for EN ISO 9239-1 Proposition of levels  Actually in R118, the materials (in vertical position) achieving an average CFE (critical heat flux at extinguishment) value greater or equal to 20 kW/m², when tested according to ISO 5658-2, are deemed to comply with the requirements.  In Railway application according to EN ISO 9239-1 for the conformity of Hazard Level 1 it’s necessary to have a CHF (critical heat flux at extinguishment) ≥ 4,5 kW/m². The simplest solution is probably to take back these already existing levels.

Proposition for Regulation UNECE R118 For us if we add these new test methods it’s not necessary to add and additional measurements of smoke density and toxicity.  Indeed the most important parameter is to control the spread of fire.  For this we only need to know two important parameters: - Flammability of the different materials (cover by the actual test in R118) - Fire spread potential of different materials (cover by our proposition)  In addition as toxic effects (asphyxiant or irritant) of smoke, appear only when thermal effects have already compromised tenability, this problem must therefore be addressed by the smoke extraction and the evacuation systems of the passengers.