Balancing Implementation Projects

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

SWE IG Meeting Paris, CRE XBID Overview Supported by.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Draft document – Work in progress
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
1 12 th Implementation Group Meeting 26 th March 2009 Establishing a SAO in the CS Region.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
PCR Status report AESAG, September Supported by:
SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
State of play of OP negotiations and OP implementation ESF Technical Working Group Luxembourg, 2 December
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
The United States Trade Representative  Is an agency within the Executive Office of the President  Approximately 200 people work at USTR  Negotiate.
Network Services: RM1045 Procurement Process
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
EBGL implementation Organization
19th GRI Coordination Group meeting
Options for association and collaboration with CERN
Supported by: PCR Status report AESAG, September
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Purchasing supplies at CERN
Content of Tender Dossier Instructions to Tenderers
SWE Day- Ahead market coupling
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
NWE Day-Ahead Price Coupling
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Trans European Replacement Reserve Exchange
Draft document – Work in progress
Supported by: PCR Status report AESAG, September
PICASSO Electricity Balancing Stakeholder Group
Update on European Network Codes
EB Reporting PT David Gerbec EBSG 5th of March 2018.
MARI BSG Meeting Manually Activated Reserves Initiative 5 March 2018
MARI BSG Meeting Manually Activated Reserves Initiative 5 March 2018
GLEB planning 05 March 2018.
TERRE Trans European Replacement Reserves Exchange
ENTSO-E IT project for Fundamental Electricity Data Transparency
Support to National Helpdesks
Imbalance Netting Platform
Webinar on imbalance settlement
EWRC-RAE MUTUAL PROJECTS
Shadow opinion on the Pricing Proposal
29th April 2014 Teleconference
EB Reporting PT David Gerbec EBSG 5th of March 2018.
Presentation of the all NRAs Request for Amendment
37th IG Meeting South Gas Regional Initiative
Exchange and Sharing of Economic Data
X-DIS/XBRL Phase 2 Kick-Off
Task Force on Target Setting and Reporting TFTSR
EWRC-RAE MUTUAL PROJECTS
Overview of the Cross-border initiatives 2018
EWRC-RAE MUTUAL PROJECTS
XBID – A review of our 1st year and future plans
RR Platform – Implementation Framework
Presentation transcript:

Balancing Implementation Projects ENTSO-E EBSG, 1 July 2019

Disclaimer The information in this presentation is for informative purposes only. It does not in any case represent a firm, binding or definitive TSOs’ position on the content.

Agenda Update from the implementation projects: IGCC PICASSO MARI TERRE (separate slides)

IGCC implementation EBSG 1 July 2019

Agenda IGCC regulation and contract INIF: status of the imbalance netting implementation framework IGCC Cooperation Agreement IGCC implementation roadmap Publication of information Contact points in IGCC

IGCC regulation and contract 1) INIF (imbalance netting implementation framework): NRAs requested ACER a two-month extension (exp. 15 July) of their deadline for approving the INIF and are working on a second request for amendments (RfA) for INIF. It is likely that the new RfA will request to specify further the article on the entities of IGCC, focusing on the legal entity performing each of the functions instead of the current approach, which explains that all IGCC member TSOs are needed to run the platform and share responsibility. 2) IGCC Cooperation Agreement: IGCC Member TSOs are finalising the update of the contract of the project, which started in Q4 2018. This update was done to align it to the submitted INIF.

Tentative not-binding roadmap Implementation roadmap EB GL Art. 22(5): deadline for implementation is one year after the approval of the INIF (est. Q2/Q3 2020). Tentative not-binding roadmap 2018 2019 2020 Country TSO Q1 Q2 Q3 Q4 Slovenia ELES   Croatia HOPS Denmark Energinet Poland PSE Spain REE Portugal REN Hungary MAVIR Italy Terna Slovakia SEPS Romania Transelectrica Bulgaria ESO Greece ADMIE Serbia EMS TBC

Implementation roadmap Accessions Denmark - DK1: changing communication protocols and becoming an LFC area before joining IGCC. Advanced planning of communication line. Poland - PSE: communication lines planned and properties on SQM device agreed. Bilateral agreement for accounting of unintended deviations signed. Spain - REE: one communication line being agreed between REE-RTE, which will enable to connect REE to TransnetBW. Portugal - REN: one communication line getting ready in Q3 2019. Hungary - MAVIR: advanced discussions on protocol and communication lines. Italy - Terna: a third party communication line is currently in implementation, protocol discussions. Slovakia - SEPS: advanced protocol discussions. ESO, Transelectrica, ADMIE: internal planning discussions ongoing. Serbia - EMS: pending decision by CE TSOs. Technical discussions with NOS and CGES.

Implementation roadmap Host TSO (TransnetBW): TransnetBW has ordered protocol converters Tase/IEC for REE, REN, Terna and Energinet. TransnetBW has ordered support from the protocol converter supplier to coordinate the communication of these TSOs with the converter.

Publication requirements INIF 3(10) The netted volumes will be published as soon as possible and not later than 30 min after the relevant market time unit. INIF 4(2)(e) The limitation of a given imbalance netting balancing border is allowed when duly justified by the relevant TSOs concerned by the imbalance netting balancing border. The concerned NRAs shall be notified of this limitation. The technical justification shall be published by the concerned TSOs. IGCC is assessing several options for the publication of volumes and limits, including the Transparency Platform, each TSO websites, a dedicated IGCC website or 50Hertz site. Based on the first analysis, the current long-term intention is to have the publications in the Transparency Platform. Netted volumes are currently published in 50Hertz’s website (here). The ENTSO-E website on IGCC is regularly updated with other information, e.g. the tentative accession roadmap and the quarterly social reports.

Publications of limits Additional limitations due to security reasons The request for limitation shall be published in a 30 minutes window after the relevant balancing market time unit in which it was requested (i.e. after the relevant 15 min when it was requested). Permanent limitations to borders composed only by HVDC systems with technology not enabling IN The limitation of a given LFC area border is allowed when duly justified by the relevant TSOs concerned by such border. The relevant NRAs shall be notified.

Contact points for IGCC Iason Avramiotis Chairman IGCC Steering Committee Dimitrios Nousios Convener IGCC Expert Group Ricardo Renedo Williams IGCC facilitating party. ENTSO-E.

PICASSO implementation

Agenda PICASSO implementation roadmap PICASSO implementation guide Coordinated work Contact points in PICASSO

Implementation roadmap EB GL Art. 21(6): deadline for implementation is thirty months after the approval of the aFRRIF (est. August 2022). PICASSO TSOs are preparing national roadmaps on the implementation steps needed to be able to join the platform. These include different levels of changes: Markets: including marginal pricing, free bidding, control-cycle volume determination, adaption of gate opening and gate closure times, MOL activation of balancing energy and incentives to react faster. Legal: including market-related legal changes, approval of accessions, signature of contracts and notifications. Technical: market-related technical changes, updates of interfaces with VSPs, installation of main communication line connections. With these national roadmaps, PICASSO will create the accession roadmap for each TSO to become operational in PICASSO, similar to the one for IGCC.

Implementation guide PICASSO has developed an implementation guide of the project. This explains, for a technical point of view, the information exchanges needed to run the platform. This includes, among others: Process data exchanges via different communication protocols for real-time communications. Rules for non-real time communication exchanges. This implementation guide has been reviewed by ENTSO-E.

Coordinated work PICASSO, in coordination with ENTSO-E (MC, WG AS, PT Coordination) is doing additional work on other implementation aspects, such us: Common invoicing of the balancing platforms; Capacity management module; Governance of IGCC and PICASSO once both go live

Contact points for PICASSO Pavel Zolotarev, Amine Abada Chairmen PICASSO Steering Committee Julien Gaudin, Simon Remppis Conveners PICASSO Expert Group Ricardo Renedo Williams ENTSO-E support to PICASSO

MARI implementation

EBSG meeting 01. 07. 2019

Focus for the MARI Project Organisation between 43 TSO’s Allocation of tasks Liability and cost sharing Preparing IT procurement and system infrastructure

MARI - Organisation structure PMT = Project Managment Team Martin Høgh Møller (Energinet.dk) - Chairman Ulf Kasper (Amprion) Amine Abada (RTE) Iason Avramiotis Falireas (Swissgrid) WG IT Jan Hermens (Amprion) MARI SC WS Design WS Roadmap /Budget WG Legal Astrid Brunt (SN) External - Schlyter Provided by the TSOs WG Technical Aurelien (RTE) Cross-Project Coordination IT PMO TF Business Analyst SET Matthias ABS Iason PMO WS … (TBD) PICASSO SC IFA LDD Astrid Didier PAT R&M Fredrik (R) Václav (M) SC Chairman PMT WG Working Group ABS Algorithm and Bid Structure WS Work Stream PMO Project Management Office/Officer IFA Implementation Framework Acceptance R&M Reporting and Monitoring LDD Legal Documents Drafting SET Pricing & SETtlement PAT Procurement and Allocation of Tasks TF Task Force

Allocation of task specific for the MARI platform B C Task B and C should be bundled in one offer TSO’s are in the progress of allocating the above task to specific TSO’s MARI and PICASSO Projects are following the same procedures

Potential trigger for planning adjustment Platform development 02/19 03/19 04/19 05/19 06/19 07/19 08/19 09/19 10/19 11/19 12/19 01/20 Reference document Review Reference Document GAP analysis GAP analysis Review Complement to GAP Pre Analysis RC - closed points (V1) Requirement Catalogue – final (V2) Review Review Requirement Catalogue (RC) Implementation guide Implementation guide 2.9.19 - 31.12.20 Tender preparation Determining procurement method Tender planning = submission of tenderers, opening, selection, evaluation and award Official specification documentation Tender for provider Tender notice RfP launch Tender process Determining model of contract Preparation of (template) supplier contract Contract negotiation Legal preparation Cooperation contract (after MC decision) Decision on jurisdiction of procurement (SC /who) Mandating tendering TSO (power of attorney or agreement) IT Support of BA and IT requirement Catalogue drafting Input for decision on hosting Support of LWG MC meeting NRA’s Deadline

Technical work presently being performed in MARI Session file from the TWG meeting 26/6-2019