Target Safety System Interfaces

Slides:



Advertisements
Similar presentations
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Advertisements

Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Accelerator control at iThemba LABS. Some background No formal reliability procedures Cost considerations SSC operational 24/7 Shutdown total of 2 months/year.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Operational SNS Karen S. White Controls Group Leader 10/11/10.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Target Controls Introduction Linda R. Coney Group Leader – Target Safety and Controls Jülich Meeting 17 August 2015.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Target Safety System (TSS) Status TAC9 Linda R. Coney Group Leader – Target Safety and Controls April 2-3, 2014.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Status and Plans for the Target Safety System Linda R. Coney Group Leader – Target Safety and Controls April 1-2, 2015.
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ESS Vacuum Standardization
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Operations Machine Simulator.
Accelerator control at iThemba LABS
IT-4189 Supply and installation of a cryogenic distribution system
Equipment simplified model SMR UR safety
How SCADA Systems Work?.
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
SC1R Cold Box PDR Controls
Transmission Engineering
RF Local Protection System
Plan for controls with the digital platform
ICS update 7th Experiment Control Workshop
PLCs integration into the ICS
TS2 PSS Architecture, Concepts of Operations and Interfaces
ESS Per Nilsson CFD Specialist
ISRC and LEBT Vacuum System Design
ESS Main Control Room & ICS Infrastructure
European Spallation Source Archiving Service
PSS0 Design & Concept of Operations
Receiving Inspection on incoming goods
MPS commissioning at ESS
IKON 15 Talal Osman & Iain Sutton
PSS Verification and validation
TSS System Requirements - TSS CDR1
RSFs & categorisation 20 May, 2019.
APTM and GRID interface requirement PBIP and PBW
Safety Readiness Review (SRR) Thomas Hansson, ESH
Rack Placement Chopper Workshop
Ola Ingemansson Electrical & Instrumentation Engineer
Operation of Target Safety System (TSS)
TSS Management: Procurement & Installation Planning
Mikael Olsson Control Engineer
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
UPPSALA UNIVERSITY_GERSEMI PROJECT
Vacuum Control System for Monolith Vacuum
Vacuum System Design for the Target Monolith System
Rack installation and local tests for the MEBT Chopper Rack
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Target Safety System Interfaces Ola Ingemansson Electrical & Instrumentation Engineer www.europeanspallationsource.se 18 August, 2019

General overview of TSS Interfaces TSS & Target wheel drive and shaft TSS & Helium cooling system TSS & Cover, penetrations and monolith vessel systems TSS & Accelerator TSS & TSS Monitoring system (ICS) TSS & Infrastructure TSS & Electrical system TSS & Machine Protection

Overview of ESS

TSS & Target wheel drive and shaft (System number 1000), ESS-0022915 Include the sensors for detection 1 general requirement states the system borderlines Mechanical structure belongs to S1000 Electrical components belong to TSS 8 requirements from TSS on S1000 Defines who is going to do what Defines that we shall approve each others design & choice of components Defines tolerances and maintainability 4 requirements from S1000 on TSS Easy access Maintainability aspects

TSS & Helium cooling system (System number 1010), ESS-0016380 Covers Mechanical borderlines Summarizes the measuring points connecting the 2 systems Defines where & how the connections are located Defines the process parameters Cover system operation and maintenance aspects i.e. decontamination possibilities

TSS & Covers, penetration and monolith vessel, (System number 1067), ESS-0032009 2 requirements from TSS to S1067 Provide penetrations & connection points Defines dimensions 2 requirements from S1067 to TSS Defines dimensions on instrument piping Combability to vacuum components

TSS & Accelerator, ESS-0030068 Requirements from TSS to accelerator Ion source & RFQ Stop the beam Response time Space Electrical supply Cable paths Bending Magnet Direction of beam Requirements from Accelerator to TSS Defines that beam shall be possible to run without a target station ready for operation

TSS & TSS Monitoring system (ICS), ESS-0249257 Functional Requirements Operator Interface (OPI) Archiver Monitor the communication Constrain Requirements TSS shall not be impacted by the TSSMS OPI shall not be used for alarm handling Epics Input/output controller (IOC) designed according to ICS standard Radiation Safety Requirements Classifies the TSSMS – An SSC important to radiation safety Interface Requirements Saying that there are no interface requirements

TSS & Site Infrastructure, ESS-0030063 Describes Rooms needed for TSS Location of rooms Level of fireproof (1 hour) Electrical outlet requirements, 16A Room environment requirements Access rules (access control room) Grounding bars needed Occupation LAN (Local Area Network) Describes electrical Surge protection Independent underground raceways for TSS

TSS & Target Electrical system, ESS-0198545 Describes (TSS to Target electrical in target utility area) Cable routing Electrical Supply distribution Grounding Raceways

TSS & MP – at the moment not written TSS believe that MP needs To know if or when TSS trips To know if TSS is ready to operate (closed contacts on actuators) Is TSS in Bending magnet position? And probably more