School Project Estimated Cost District Priority

Slides:



Advertisements
Similar presentations
New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Advertisements

Sustainability Study of Burton Elementary School
17 May, 2011 BOARD PRESENTATION MAY 17, 2011 SUMMER PROJECTS UPDATE.
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
Construction Update September 2014 Madison Elementary School District.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Board Update November 21, What is Tower Pinkster's Charge? 1.To assess the existing conditions of the Portage Public School Buildings and Sites.
Whistler Lodge Survey December 2012 Commissioned by the VP Administration.
 DEC meeting, October 8, 2014 – motion was made on Lorne School:  “ Council direct the Superintendent to inform Minister Rousselle that we intend.
Camas School District. * Gather data * Enrollment projections * Building capacities * Building utilization * Physical condition assessment * Debt capacity.
Mayflower Hill House Energy Audit May 8, 2015 Compiled by: George Voigt ’17, Danqing Zhao ’17, Kel Mitchel ’16, Emma Reif ’16, Savannah Judge ’15, Evan.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Year Review of Major Financial Funds Mount Vernon Community School District.
College Station ISD Planning for Growth December 12, 2006.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Carroll County Public Schools Board of Education Work Session August 27, 2014 FY 2016 Capital Budget and FY 2017 – FY 2021 Capital Improvement Program.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
IMPROVING COOLING SYSTEM EFFICIENCY WITH PRE-COOLING AJ Schutte 15 August 2012.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
SUMMER 2015 DEFERRED MAINTENANCE
Planning, Constructing, and Financing the Future.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
DEFERRED CAPITAL PROJECTS REPORT Facilities Sub-Committee June 11, 2013.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
1 Five Year Capital Improvement Schedule Lancaster County School District
Cape Ann and New England Gambrel By : Taylor Hartman.
Energy Conservation Building Upgrades Alma School District.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
San Francisco Fire Department Facilities Update.
8. VENTILATION  When there is a difference between outdoor and indoor temperature, ventilation can be accomplished by natural means. Strategically placed.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
Facility Assessment Reports FY 16 Survey Results June 9, 2016.
30 West Arrellaga Street, Santa Barbara, CA Phone: Telephone Road, Ventura, CA Phone: Kruger Bensen Ziemer Architects,
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Madison Elementary School District
Update on the PSB Cooling and Ventilation Systems
Facilities Planning Robert A. Haley Superintendent
Overview of MSBA Building Process and Project Timeline
STATE UNIVERSITY OF NEW YORK AT OSWEGO
Capital Improvement & School Construction Bond
Cooling and Ventilation Systems
Overview of MSBA Building Process and Project Timeline
Capital Construction Bond Program
Fall 2017 Update: Physical properties and sinking fund
LOMPOC UNIFIED SCHOOL DISTRICT - BOARD UPDATE
VCSD Capital Project Forum
Dr. Joseph Meloche Superintendent of Schools Mrs
Importance of Air Conditioning And Heating Company The important part of Air Conditioning needs to be maintained regularly. If you are a failure to do.
COMMUNICATION.
Worcester Public Schools Study and Master Plan
فرایند تسهیلگری در مددکاری جامعه ای
Hillsborough MPO School Safety Study
Chariho Regional School District
DOVER ELEMENTARY Existing MPB (2/14/12).
Capital Outlay Workshop
Master Facilities Committee Evaluation and Identification
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Open Hearing Presentation March 18, 2019
Director of Water Engineering
2018 AESD Major Capital Project Recommendations
Major Capital Projects:
Dixon Middle School Project Update
FY19-28 Capital Improvement Program Request
Westerly School Legacy Plan: A Vision for the Future of Education
Capital Projects Process
Presentation transcript:

AESD Capital Projects Recommended in June 2018 for work in the summer of 19/20 School Project Estimated Cost District Priority Hillsborough Elementary School (ASD-E) Lift/Elevator $250,000.00 1 Magnetic Hill School (ASD-E) Washrooms $150,000.00 11 Shediac Cape School (ASD-E) $270,000.00 12 Claude D. Taylor School (ASD-E) Heating and Ventilation Maintenance $696,000.00 2 Riverview Middle School (ASD-E) Communication System $80,000.00 6 Arnold H MacLeod School (ASD-E) $35,000.00 7 $50,000.00 8 Caledonia Regional School (ASD-E) $60,000.00 9 J.M.A. Armstrong/Salisbury Middle School (ASD-E) Replace leaking cooling tower. $120,000.00 3 Heating and Ventilation Heat Pumps $450,000.00 4 Site Improvement 13 Building Envelope Exterior and Repointing $340,000.00 Petitcodiac Regional School Fire Sprinkler Pump House $600,000 Total $2,951,000.00