LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Williamstown Fire Department Fire Station Feasibility Study
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
MONSON TOWN HALL / MONSON POLICE BUILDING UPDATE 5/21/2014.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Luxury Homes FROM separate entry exits D L F B A Y V I E W.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
View of Barcombe Village hall from the reservoir. Built in A modern green sustainable hall that can boast a green roof, a rainwater harvesting system,
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
Church Renovation/ Expansion Proposals Willowdale.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Proposed Facility Master Plan First Baptist Church Mt Washington, Ky.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
BE MECHANICAL ENG. 1 ST SEM GROUP :-11 ME – D DABHI DASHYANSINH.S 241 VEKARIYA TEJ.R 242 NIL PATEL.J 243 AKSHAY PATEL.A 244 PARTH PATEL 245 MOHIT VERMA.H.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Where We Are, And How We Got Here Somersworth School District November 27, 2007.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Uplands Walk Supportive Housing Community Consultation PUBLIC CONSULTATION WORKSHOP June 2012 UPLANDS WALK SUPPORTIVE HOUSING DESIGNING FOR SAFETY and.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
Department of Aerospace Engineering and Mechanics University of Minnesota Akerman Hall Hangar Renovation Gary J. Balas, Head Distinguished McKnight University.
presents 5080 Meridian Street Pre-Construction Appraisal performed March 2009 $1,650,
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Solana Beach Presbyterian Church The Generations Vision Believe. Belong. Build. California Coastal Commission November 4, 2011 Oceanside, CA we SERVE with.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
1 Agenda February 15, 2007 Facilities Advisory Committee 1)Call to Order – Paul Stansberry & Kevin Max 2)Option 3 – Plan & Costs 3)Operating Costs 4)Timeline.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Building 185 Orientation Briefing 101 Nelson Drive Offutt AFB,
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Building. Goals Stay Downtown Keep Costs the Same Increase our Space.
Team 3. …Because the next generation of building is restorative. East Halls.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Photo Album of Model flat as on by Prestige Misty waters.
DC Office of Cable Television, Film, Music & Entertainment Angie Gates, Director Proposed Transition Marquee Branding.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Birds Eye view of the Vidyalaya. Entrance of the Vidyalaya.
Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing DZM Block 20 Residential.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
White Pigeon Community Schools
The art and science of designing and construction of buildings.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Signage Upgrade Project 2016
Allen Bond Proposal Components and Descriptions September 12, 2017
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Huntsville City Schools Huntsville High School Softball
225 Maple Avenue South Plainfield High Traffic County Road
Troy School District Bond Program – Series 1 Construction Update
DOVER ELEMENTARY Existing MPB (2/14/12).
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
For Sale OREM RETAIL BUILDING TRACY THUESON P
Our Vision Chickasaw Point - An inviting community on Lake Hartwell where residents work, play and enjoy life together ”A welcoming place to.
Recent Bond Accomplishments
Master Facilities Committee Evaluation and Identification
Literature Case study Literature case study consists of reading everything you can find on the subject. You can refer books in a library, use Google to.
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI Building Your Future Sensible Solutions Superior Service LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI RONALD M. MCFARLAND, NCARB Architect 3285 Warren Road, Oakland, Tennessee 38060-4249 Phone: (901)233-1415 Ron@RJTArchitecture.com

SITE PLAN Issues: Water draining to Bldg. Building is actually to low Pedestrian & vehicles using same space Playground visible from street SITE PLAN

NEEDS: 4 Offices (12 X 16) 2 Conference / Class Rooms (20 x 20) Lobby for Visitors / Foyer Break Area Storage Shower

8000 sf 3000 sf CODE: CONST. TYPE IV B Unprotected/Unsprinkled Max Building Area = 10,500 sf Add Sprinklers area= 26,125 sf Toilets do not meet Handicap Requirements

8000 sf NO FIRE WALL 3000 sf EXITS S.F.

BUILD OPTIONS: EAST SIDE REAR BETWEEN BUILDINGS EXPAND FELLOWSHIP HALL FREE STANDING FRONT

ADVANTAGES: Adequate for Offices and Class Rooms with offices at front. Solves Front Water Problem Creates an Entry Identity Provides for Loop Parking with more parking at Entrance Separates Pedestrians and Vehicles Playground further from street

UPGRADE TOILETS NEW CONSTRUCTION: 2,500 SF

MATERIALS: Aluminum Composite Material (ACM) Metal Roof Glazing Brick Canopy

HVAC & Elect.

What’s Next? Will need a Survey with Topography Information. Must fix the water issue on site. Hire and Architect and his Engineers.