2nd phase intercalibration

Slides:



Advertisements
Similar presentations
MAMA - Network Project WP 7. MAMA-AWARE Coordinated by UNEP/MAP (MB 11) – MED POL Unit.
Advertisements

River Fish Intercalibration group Coordination: D. Pont,Cemagref, France) N. Jepsen (JRC Ispra)
Intercalibration of assessment systems for the WFD: Aims, achievements and further challenges Presented by Sandra Poikane Joint Research Centre Institute.
Lake Intercalibration: status of ongoing work Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
DRAFT Intercalibration of methods to evaluate river EQ using fish Niels Jepsen, JRC & Didier Pont, Cemagref.
1 Intercalibration in the Eastern Continental Region 1 Dr. Ursula Schmedtje International Commission for the Protection of the Danube River.
The 19 th of June 1990 : The Schengen Implementing Convention has been signed by : - Germany - Belgium - France - Luxembourg - Netherlands Calendar.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group A ECOSTAT Intercalibration Progress Coast GIGs JRC, Ispra, Italy, March 2005 Dave Jowett, Environment Agency (England and Wales), Coast.
River Intercalibration Phase 2: Milestone 4 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River Intercalibration Phase 2: Milestone 2 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Meeting of the Working Group 2A on Ecological Status (ECOSTAT) – 3+4 July 2006, Stresa (IT) Eastern Continental GIG Draft final report on the results of.
River Intercalibration Phase 2: Milestone 3 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Meeting of the MED POL National Coordinators Barcelona, Spain, May 2005 Progress Report during and activities proposed for Capacity.
EUROPEAN UNION – MAKING OFF European Economic Community
Janusz Sierosławski, Jacek Moskalewicz
GIG plan updates GIG leads were requested to update their work plans
Intercalibration results 2006/2007
Intercalibration Results 2006
IC network selection process
EUROS Identification Austria - Belgium - Cyprus - Estonia - Finland - France - Germany - Greece - Ireland - Italy - Latvia Lithuania - Luxembourg - Malta.
Intercalibration progress: Central - Baltic GIG Rivers
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register: RIVERS.
Working Group A ECOSTAT River GIG results Wouter van de Bund Vaida Olsauskyte Joint Research Centre Institute for Environment and Sustainability.
Marine Strategy Framework Directive: an introduction
ALPINE RIVER GIG Update: Macroinvertebrates Phytobenthos.
Working Group A ECOSTAT October 2006 Summary/Conclusions
ECOSTAT WG 2A, JRC - Ispra (I), 7-8 July 2004
The IUCN Green List Sustainability Standard
Central Rivers Geographical Intercalibration Group
River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
EU: First- & Second-Generation Immigrants
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Central-Baltic Rivers GIG progress
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Expert drafting group on lakes report:
Working Group A ECOSTAT Summary Milestone Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Common Implementation Strategy for the
CBriv GIG Macrophyte Intercalibration Status Overview
Task force on victimisation 4. Precision requirements
Update on progress since last WG meeting (13-14 June 2002)
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
River Fish Intercalibration group ( )
Intercalibration Decision and Technical Report
WFD – CIS Working group A ECOSTAT
Activities of WG A Ecological Status
ECOSTAT, JRC April 2007 MEDiterranean RIVers GIG Report
WG A Ecological Status Progress report April-October 2009
CIS Working Group 2A ECOSTAT SCG Meeting in Brussels
Water Directors meeting Mondorf-les-bains, June 2005
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT, Stresa, Italy, October 2005
River groups with extension
Lake Intercalibration – IC Decision Annexes + what to do in future
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
River Fish Intercalibration group D. Pont,Cemagref, France)
Lake Intercalibration
Reporting template for milestone reports
Common Implementation Strategy for the
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
Fish intercalibration – rivers Progress and expected outcome
Working Group on Reference Conditions
WG A Ecological Status Progress report October 2010 – May 2011
MED-GIG: Mediterranean Coastal
Relationships for Broad & Intercalibration Types Geoff Phillips
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

2nd phase intercalibration 2008-2011 Mediterranean RIVERS Coordination PORTUGAL

ORGANISATION AND COORDINATION: 2nd phase intercalibration INAG Coordination and ECOSTAT/WFD liaison Felisbina Quadrado Andrea Franco Med GIG Scientific Coordinator M. Teresa Ferreira Med GIG macrophyte leader F. Aguiar Med GIG macroinvertebrate leader M. J. Feio Med GIG periphyton leader S. Almeida Med crossGIG fish liaison M.T.Ferreira and P. Segurado INAG Focal point and Technical Secretariat João Ferreira

BRIEF SUMMARY 1st phase intercalibration – Mediterranean rivers PHYTOBENTHOS Intercalibration completed for 3 MS and 4 river types (but limited datasets) MACROINVERTEBRATES IC completed for 5 MS and 4 river types (but need to improve reference criteria and pressure types) MACROPHYTES Intercalibration was not done due to lack of official methods and data (need to discuss if this element can be used, namely if trophic-level oriented) FISH A preliminary comparison of national indices was made (need to improve reference criteria and pressure types)

GAPS identified/AIMS of the 2nd phase intercalibration Med rivers (Lisbon meeting June 2008) To increase the number of participating countries and improve the data set (phytobenthos) Intercalibration of the element macrophytes Improvement of criteria to set reference conditions (all elements) To intercalibrate for single pressures and new indices (macroinvertebrates) Combination of macrophytes and phytobenthos for a final value Implications of temporal variability (macroinvertebrates)

MED COUNTRIES INVOLVED (INTENTION) MACROPHYTES PHYTOBENTHOS MACROINVERTEBRATES FISH PORTUGAL SPAIN FRANCE ITALY ? SLOVENIA CYPRUS GREECE MALTA

MEETINGS 2nd phase intercalibration 2008-9 Preparatory meeting Lisbon 7th May General Kick-off MedRiver GIG meeting Lisbon 25-26th June ECOSTAT meeting Brussels 1-2 October --------------------------------------------------------------------------------------- National follow-up meeting Lisbon 15 October General cross-GIG fish meeting Sharfling Austria 25-26 November Med macrophyte meeting Barcelona 8-9 January 2009 Med phytobenthos meeting Bordeaux 7-9 January 2009

2nd phase intercalibration: WORK IN PROGRESS General working program discussed for each element in the first general meeting - June 2008 Frame proposed for data filling and discussion of final form Reference conditions criteria in discussion via e-mail Biological, environmental and pressure data to be gathered (not all MS have methods) - end of 2008 To establish present data availability – end of 2008 Meeting for each element to analyze quantity and quality of available data; to plan data treatment; to set dates for the final reports - beginning of 2009