BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Pre-Bid Meeting Renovations and Expansion of Catholic University, Wau, Western Bahr El Ghazal State – South Sudan (Re-Bid) United States Agency for International.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
Public Procurement Procedure – Bidding Documents
TENDERING PROCEDURE IT- 3927/EN
United Nations Procurement Division
Specification & Quantities Estimating
CONSTRUCTION CONTRACTS DOCUEMENTS
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
Millennium Challenge Account-Benin II Feasibility Study to Establish a Power Generation Company (GENCO) Pre-proposal Meeting March 30, 2016 Brief Procurement.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
Minimum Set of Requirements for Suppliers
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Procurement & Strategic Sourcing
Minimum Set of Requirements for Suppliers
Tender Evaluation and Award Process
Administration of a FIDIC Contract - Project Control
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Content of Tender Dossier - Instructions to Tenderers - Tenders
Presented by: AfDB Team Facilitator: Sophie DIMBUNGU
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
WORLD BANK Harmonized SBD-Works
RFP EMISSIONS SOURCE VALIDATION
Procurement & Strategic Sourcing Charter Bus Transportation Services
Evaluation Grids Evaluation Grids.
Joint Parking Task Force Update Procurement & Strategic Sourcing
TENDERING PROCEDURE IT-3981/EN
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
Procurement & Strategic Sourcing
Particular Conditions of Contract & Appendix to Tender
Washington Metropolitan Area Transit Authority (WMATA)
How to Submit a Winning Bid
9/18/2018 Bids CONTRACTING Khamis…..
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
BIDDING DOCUMENTS AND MAIN FEATURES
Fasset Briefing Session
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
United Nations Procurement Division
Omnibus IV Contracting Strategy Michael D’Alessandro
Provision of vocational and entrepreneurship development skills training to the out-of-school adolescent girls and young women from conflict affected.
Agenda Topics: Competitive Bidding Determine Selection Method
Pre-bid Clarification Meeting
Procurement & Strategic Sourcing
Provision of HR Services, UNOPS Nepal
Invitation To Bid Accommodation and Conference Services for RBM Partnership’s Regional Meeting in Abuja, Nigeria October 2019.
Procurement & Strategic Sourcing
PRE-BID CONFERENCE Health Insurance Provider for UNOPS Indonesia
Presentation transcript:

93684- BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015

PURPOSE CONVEY PERTINENT PROJECT INFORMATION ADVISE BIDDERS TO PROVIDE SUBSTANTIALLY RESPONSIVE BIDS CLARIFY ISSUES/CONCERNS AND/QUERIES

PROJECT INFORMATION DONOR: USAID/ UNOPS Implementing Agency: UNOPS Client: MTRB/MoPI Beneficiaries: National and State Govt and Communities Project Objectives: Improve rural livelihood through provision of sustainable roads to agricultural markets

Project Bridges: Location Map

Project Bridges: Location Map Kaya, Koni and Kyibu Kaya Zone 36 N E 307149.00 m N 423240.00 m Koni Zone 36 N E 317387.00 m N 421794.00 m Kayibu Zone 36 N E 326867.00 m N 418917.00 m

BRIDGE 1: KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1: KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast) Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)

Project Bridges BRIDGE #2: KONI RIVER BRIDGE: 18.74m SPAN (Cast-in-situ RC)

Project Bridges BRIDGE #3: KAYIBU RIVER BRIDGE: 18.74m SPAN (Cast-in-situ RC)

Mobilization and Site Establishment Construction PROJECT SCOPE Pre-Construction Mobilization and Site Establishment Construction Demolition and removal of Existing Structures Construction of Substructures, Superstructures Protection Works Earthworks -Approach Road Gravel Wearing Course – Approach Road Road Furniture – Approach Road Cross-Cutting Issues Environment , Health and Safety Post Construction Demobilization Defect Rectification.

Accommodation for Engineer’s staff Security (Camp Perimeters) KEY WAYPOINTS Mobilization Plant and Equipment Key Personnel Camp Establishment Office facilities Accommodation for Engineer’s staff Security (Camp Perimeters) Other facilities Deconstruction of Existing Structures Reconstruction- Kaya, Koni and Kayibu

Section I - Bid Particulars Section II - Instruction to Bidders Content of the ITB Invitation Letter Section I - Bid Particulars Section II - Instruction to Bidders Section III - Evaluation Method & Criteria Bidders are strictly advised to satisfy themselves all the evaluation criteria are met before submitting bids Section IV - Returnable Bid Schedule (Note: make sure that all the returnable are completed and returned) Section V - UNOPS Measured Price Construction Contract

Content of the Bid Documents: Published ITB Returnable Schedules Annexes Annex 1: BOQ Annex 2: Book of Drawings (Part 1 & Part 2) Annex 3: Standard Technical Specification Annex 4: Special Provisions to the Technical Specifications Annex 5: Environmental Management Plan Annex 6: Measured Price Contract GCC Annex 7: Measured Price Contract Schedules

Bid Security: 30 days beyond the bid validity (120 days) KEY BID INSTRUCTIONS Bid Submission: One envelope: Financial & Technical Proposals sealed envelope Submission: Mail or personal delivery by closing date : NO EMAIL/ELECTRONIC DELIVERY Bid Currency: USD Bid Validity: 90 days Bid Security: 30 days beyond the bid validity (120 days)

Bid Returnables : Complete all Bid closing- 11th January, 2016-10:00AM KEY BID INSTRUCTIONS Bid Security: an amount 5000USD in the form set out in Returnable Bid Schedule 2 Form of Bid Security (Mandatory): Strictly follow the returnable form and the period set Bid Returnables : Complete all Bid closing- 11th January, 2016-10:00AM Bid opening- 11th January, 2016, 11:30 AM (Public Opening)

Bid Returnable Documents Responsive bids shall contain the following minimum documents: Schedule 1 - Form of Bid Schedule 2 - Form of Bid Security Schedule 3 - Bidder’s Details Schedule 4 - Bill of Quantities-financial offer Schedule 5 - Bidders Preliminary Programme Schedule 6 - Proposed Project Team & Organizational Structure Schedule 7 - Insurances-Confirmation Schedule 8 - Capacity, Experience, Work In Hand And Work Completed Schedule 9 - Implementation/Quality management System Proposals

Bid Returnable Documents Responsive bids shall contain the following minimum documents: Schedule 10 - Health and Safety Management System Schedule 11 - Environmental Management System Schedule 12 - Proposed Sub Contractors and Suppliers Schedule 13 - Proposed Sources of Naturally Occurring Materials Schedule 14 - Outline Statements of Proposed Methods Schedule 15 - Declaration Schedule 16 - Conflicts of Interest Schedule 17 - Dispute Details Schedule 18 - Addenda to ITB

Bid Evaluation and Award Preliminary Examination: - UNOPS may reject or exclude Bids that : do not comply with the ITB requirements, are incomplete, frivolous, contain material deviation or reservation to the terms of contract Evaluation:- Bids will be evaluated according to Section III of the ITB. Evaluation Procedure:- two step procedure 1st Step: Technical compliance A “pass / fail” method based on objective criteria 2nd step: Financial Bids found to be technically compliant will be evaluated on Price and value for money Analyzing all relevant cost Risks and benefits of each bid NOTE: All three bridges will be awarded to the successful bidder

Bidder Eligibility-Article 4 -ITB Bids submitted by bidders in the following category will not be considered for evaluation and award: Suspended or declared ineligible by UNOPS or any UN System, including the World Bank Is on the UN 1267 terrorist list

CONTRACT PERIOD: 9 Calendar months DNP-12 Months INSURANCES KEY CONTRACTUAL DATA CONTRACT PERIOD: 9 Calendar months DNP-12 Months INSURANCES Contractor’s All Risk Insurance Worker’s Compensation Contractor’s Plant and Equipment Insurance Motor Insurance Professional Indemnity Insurance

KEY CONTRACTUAL DATA MATERIAL ON-SITE PAYMENT Crushed Aggregate Reinforcement Steel Cement Guard rails Gabion and mattress mesh boxes Geotextile Concrete panels

CLARIFICATIONS Responses to requests for clarification – to be posted on UNOPS’ website at www.unops.org under ITB Case No. UNOPS/SSOC/93684/ITB/WORKS/2015-082. Any amendments or clarifications will be posted under the “view documents” of the concerned case file on the “Current business opportunities” on www.unops.org, and we kindly ask you to check the site before submitting your bid.

Questions ?