Computer System Validation

Slides:



Advertisements
Similar presentations
© WHO – PSM Validations – part 1 Workshop on GMP and Quality Assurance of TB products Kuala Lumpur Malaysia, 21 – 25 February 2005 Maija Hietava M.Sci.Pharm.
Advertisements

PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Software Quality Assurance Plan
21 CFR Part 11 course syllabus / Ilan Shaya 21CFR Pat 11 | Objective | Audience |Course Outline | Details 15-16/7/2013.
Radiopharmaceutical Production
Radiopharmaceutical Production
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
Software Quality Assurance Plan
Audit of IT Systems SARQA / DKG Scandinavian Conference, October 2002, Copenhagen Sue Gregory.
GMP Document and Record Retention
ITIL: Service Transition
Validation, Verification, Qualification : Which is right and does it really matter?
Regulatory Compliant Performance Improvement for Pharmaceutical Plants AIChE New Jersey Section 01/13/2004 Murugan Govindasamy Pfizer Inc.
Cheryl McCarthy Manager, Quality Assurance MBC Session October 3, 2008 GCP Compliance in our Vendors.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
IS Audit Function Knowledge
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
ISO 9000 Certification ISO 9001 and ISO
Laboratory Information Management Systems (LIMS) Lindy A. Brigham Div of Plant Pathology and Microbiology Department of Plant Sciences PLS 595D Regulatory.
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
11/2/991 CDER’s 21 CFR Part 11 Implementation Study Greg Brolund Associate Director, Office of Information Technology, CDER/FDA.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
DRAFT Richard Chandler-Mant – R Consultant The Challenges of Validating R Managing R in a Commercial Environment.
Regulatory Update Ellen Leinfuss SVP, Life Sciences.
MethodGXP The Solution for the Confusion.
Basic Principles of GMP
Introduction to Software Quality Assurance (SQA)
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
VALIDATION METHODOLOGY
Important informations
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Joel Gerber Zachary Reaver Kurt Schilling.  Provides physical proof of development  Maintains product design knowledge base  Meets government and corporate.
Part 11 Public Meeting PEERS Questions & Responses The opinions expressed here belong to PEERS members and not the corporate entities with which they are.
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
The world leader in serving science Validation and Qualification Overview Mike Garry Software Product Manager Spectroscopy Software Platform Team.
Pharmaceutical Quality Control & current Good Manufacturing Practice
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
EU GMP Guide Annex 11 “Computerised Systems” Edwin Lindsey Understudy: Neil Fraser.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
An exposure to COMPLIANCE AUDIT By- Vishal Chawre DAG(A/c & VLC) O/o AG(A&E), Nagpur.
Medical Device Software Development
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
ITIL: Service Transition
Radiopharmaceutical Production
Software Project Configuration Management
World Health Organization
Software Quality Control and Quality Assurance: Introduction
World Health Organization
Pharmaceutical Quality Control & current Good Manufacturing Practice
Author: Nurul Azyyati Sabri
Chapter 10 Software Quality Assurance& Test Plan Software Testing
TechStambha PMP Certification Training
Flooding Walkdown Guidance
Engineering Processes
Computer System Validation
בקרה תוך שימוש ב 21CFR Part 11 / אילן שעיה סמארט לוג'יק
FDA 21 CFR Part 11 Overview June 10, 2006.
HHS Child Welfare National IT Managers' Meeting
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Software Reviews.
Radiopharmaceutical Production
Radiopharmaceutical Production
Presentation transcript:

Computer System Validation Eric J. Silva eric@ericsilva.org 01 March 2013

Agenda Introduction Target Audience Background Responsibilities & SOPs The Validation Process Software Development Lifecycle (SDLC) Computer System Development SOPs 01-Mar-2013 ©2013 Eric J. Silva

Introduction The purpose of this presentation is to give the audience an overview of: What is Computer System Validation (CSV) Why is CSV needed What processes are needed for CSV 01-Mar-2013 ©2013 Eric J. Silva

Target Audience Developers of computer systems applications Users of computer systems involved in testing and validation activities Personnel involved in computer systems procurement All concerned managers, auditors, and regulatory personnel Personnel involved in the maintenance of computer systems 01-Mar-2013 ©2013 Eric J. Silva

Background In 1987 the FDA published a document entitled ‘FDA Guidelines on General Principles of Process Validation’ It states the following: Process validation is establishing documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes. This definition indicates that validation can apply to any process including process managed / controlled by computer systems. 01-Mar-2013 ©2013 Eric J. Silva

What is Computer System Validation The purpose of the validation process is to provide a high degree of assurance that a specific process (or in this case computer system) will consistently produce a product (control information or data) which meets predetermined specifications and quality attributes. 01-Mar-2013 ©2013 Eric J. Silva

Why is Validation Needed FDA regulations mandate the need to perform Computer System Validation and these regulations have the impact of law. Failing an FDA audit can result in FDA inspectional observations (“483s”) and warning letters. Failure to take corrective action in a timely manner can result in shutting down manufacturing facilities, consent decrees, and stiff financial penalties. The ultimate result could be loss of jobs, indictment of responsible parties (usually the officers of a company), and companies suffering economic instabilities resulting in downsizing and possibly eventual bankruptcy. As a contracted resource of software and services to pharmaceutical and other life sciences companies, we are responsible for ensuring that our software products are compliant with federal regulations. 01-Mar-2013 ©2013 Eric J. Silva

Why is Validation Needed Reduces risk and legal liability Having the evidence that computer systems are correct for their purpose and operating properly represents a good business practice Software is constantly evolving to keep up with the increasingly complex needs of the people that use it; therefore validation is an ongoing necessity 01-Mar-2013 ©2013 Eric J. Silva

Validation Validation is applied to many aspects of the healthcare and other regulated industries and businesses. Examples include: Services Equipment Computer Systems Processes In each case, the objective of validation is to produce documented evidence, which provides a high degree of assurance that all parts of the facility will consistently work correctly when brought into use. Computer systems validation includes validation of both new and existing computer systems. Validation requires documented evidence. If the validation process is not documented then it cannot be proved to have occurred. 01-Mar-2013 ©2013 Eric J. Silva

Responsibilities Computer system validation must be supported at different levels within the organization through policies, standards and documentation Corporate/Business Unit Site/Department Personnel Quality Assurance and Regulatory Units Corporate Management IT Departments Smaller companies can be considered a single Corporate/ Business Unit, but can also have different policies based on Site [geographical] differences (e.g., USA, UK, India) 01-Mar-2013 ©2013 Eric J. Silva

Responsibilities & SOPs Each corporate [business] unit is responsible for establishing a policy on computer systems validation requirements. Site or departments are responsible for: Computer system validation Standard Operating Procedures (SOPs) System inventory and assessment System specific validation protocols System specific validation documentation SOPs must: Comply with the Computer Systems Validation Policy and any Business Unit policies that may apply Be approved by the appropriate management for that site or department 01-Mar-2013 ©2013 Eric J. Silva

System and Inventory Assessment Site or departmental management is responsible for compiling and maintaining details about their computer systems. This information includes identifying the systems that are being used and for what purposes those systems are being used. The system inventory and assessment information is used to determine which systems need to be validated. 01-Mar-2013 ©2013 Eric J. Silva

System Specific Validation Protocols Validation protocols are documents associated with each system identified as requiring validation.  The protocol describes the scope, procedure to be followed, responsibilities and acceptance criteria for the validation. Validation protocols should comply with the SOPs. 01-Mar-2013 ©2013 Eric J. Silva

Validation Documentation Documentation that verifies each validation activity must be generated and stored with the validation protocol in the appropriate archive. Validation documentation may include: test data summary reports procedures certification forms produced during the validation process 01-Mar-2013 ©2013 Eric J. Silva

Pre-Validation Process Before you can validate a system, you need to identify the systems that require validation. Determining if a system requires validation involves analysis of the following areas: 21 CFR Part 11 – electronic records and signatures Manufacturing processes Product [drug material] release or stability information Regulatory information Support GxP activities All users must be trained on current SOPs related to computer system development and validation. 01-Mar-2013 ©2013 Eric J. Silva

System Owners All hardware and system/application should have a designated owner. Hardware Owner Responsible for identifying all software residing on the hardware – both system and application software Maintaining the inventory whenever changes are made Managing the change control process for the system software and hardware Working with the system/application owners to determine the impact of the change to the system/application System/Application Owner Defining the system (hardware and application) Completing the system assessment Ensuring that information pertaining to their specific system is correct and complete Updating the system assessment whenever changes are made to the system Managing the change control process for the system/application 01-Mar-2013 ©2013 Eric J. Silva

Validation Master Plan The validation of all computer systems will be documented in a Validation Master Plan (VMP) The Validation Master Plan will include: Identifying components requiring validation Prioritizing and justifying the validations to be performed All activities and assigned responsibilities Establishing site specific procedures to support validation 01-Mar-2013 ©2013 Eric J. Silva

Types of Validation Prospective validation – the validation of a new system as it is developed Retrospective validation – the validation of an existing system 01-Mar-2013 ©2013 Eric J. Silva

The Validation Process Consists of five specific processes Validation Master Plan (VMP) Project Plan Installation Qualification (IQ) Operational Qualification (OQ) Performance or Process Qualification (PQ) 01-Mar-2013 ©2013 Eric J. Silva

Specification and Qualification Relationships User Requirement Specification PQ Verifies Functional Specification OQ Verifies Design Specification IQ Verifies System Build 01-Mar-2013 ©2013 Eric J. Silva

The Validation Process Steps Establish Team(s) These are the teams that will be responsible for the validation process Determine Validation Activities Validation activities are the exact details or activities that will be required for each of the steps in the validation process The output from this activity will be the Validation Plan Write the Validation Protocol Describes the procedure and the steps within the procedure that will be followed in order to validate the system The Validation Protocol must also provide a high level description of the overall philosophy, intention and approach Specify the System Development Details Must have a good methodology in order to develop a system (SDLC) Must have a formal quality management system for the development, supply and maintenance of the system Perform Qualification Activities Design, IQ, OQ, PQ 01-Mar-2013 ©2013 Eric J. Silva

The Validation Process Steps Develop/Review Controls and Procedures SOPs (Standard Operating Procedures) Training procedures and Training records Certify the System This step is where you certify that the validation deliverables have met the acceptance criteria that were described in the Validation Protocol When you certify the system you should prepare a Validation Report The validation report should outline the details of the validation process Review Periodically The system should be reviewed periodically to provide additional assurance of validation There should be documentation outlining the details of how the review is to be done and what the review should cover The end result of a review should be a summary of the review and a recommendation as to what to do next 01-Mar-2013 ©2013 Eric J. Silva

Software Development Lifecycle Planning Requirements Analysis Design Development Integration, Test, and Validation Installation, Qualification, and Implementation Operations and Maintenance 01-Mar-2013 ©2013 Eric J. Silva

Typical SDLC SOPs 01-Mar-2013 ©2013 Eric J. Silva Title Phase / Description Computer System Lifecycle Policy Overview of SDLC Process Computer System Planning Planning Computer System Requirements Planning / Requirements Gathering Computer System Assessments Planning / Determining Validation Needs Computer System Estimation Planning / Time and Resource Estimation Computer System Design and Configuration Design / Hardware and Software Computer System Development Build / Development, Review, and Configuration Computer System Test Planning Testing / Planning, Strategy, Scripts, and Summary Computer System Application Test Execution, Deviation, and Documentation Processes Testing / Test Execution and Deviations Computer System Defect and Feature Management Testing / Managing Defects Computer System Release Management Release / Release and Archiving Computer System Configuration Management Maintenance / Change Control and Maintenance Computer System Decommissioning Decommissioning / Retirement of Computer System Computer System Project Closure Closure / Post Release Analysis Computer System Maintenance and Administration Activities Maintenance / Admin and Maintenance Computer System Change Control Maintenance / Change Control 01-Mar-2013 ©2013 Eric J. Silva

Resources and References Computer System Validation (FDA) 21 CFR Part 11 FDA Guidance for Industry – Computer Systems Used in Clinical Trials Computer System Validation – It’s More Than Just Testing 01-Mar-2013 ©2013 Eric J. Silva