CLIENT GROUP Owner:End-Users/Tenants: Senate PropertiesHelsinki University of Technology PROJECT TEAM Architect: Arkkitehtitoimisto A-Konsultit Oy Structural.

Slides:



Advertisements
Similar presentations
© World Meteorological Organization Recommendations of the First Technical Workshop on Standards for Hazard Monitoring, Database/Metadata and Analysis.
Advertisements

PRODUCT MODELLING. Eastman C (1999). Building Product Models, CRC Press, Boca Raton Smithers T (1989). AI-based design versus geometry-based design or.
Interoperability and Solibri Jan Karlshøj Associate Professor
Helsinki University of Technology (HUT-600) Auditorium Project A case study in the application of: Industry Foundation Classes & 3D/4D Models Calvin Kam.
© University of Strathclyde Assessing Aesthetic Quality Martin Fitchie University of Strathclyde.
Building Technologies Program. FLEXLAB Background LBNL responded to a 2009 RFP for ARRA funds to develop a facility that: o Develops new test methods.
Copyright, EPM Technology AS Kjell Bengtsson EPM Technology
Rational Tool Overview. Introduction Requirements-Driven Software Development with Rational Analyst Studio. Tafadzwa Nzara Analysis & Design Consultant.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
International Software & Productivity Engineering Institute Best Practices for Launching and Managing Outsourcing Subsidiaries Vladimir L Pavlov, INTSPEI.
Irwin/McGraw-Hill Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
IES Faculty BIM Integration with IES 6 th September 2011 Dr Sarah Graham B Eng, C Eng MCIBSE, Eng D UK Sales Manager T: C:
WebShow_PM4D.ppt / MJo 1 Product Model Approach in Design, Construction and FM Development Project : Product Model 4D – Construction Pilot (PM4D) Pilot.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Introduction to BIM BIM Curriculum 01.
Thesis Proposal Virtual Reality in Construction Cost Estimating By: Mandy Frazure Date: 5/12/04.
Information Delivery Manuals: Building Information Modelling
Bina Nusantara 2 C H A P T E R INFORMATION SYSTEM BUILDING BLOCKS.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
Publish Your Work BIM Curriculum 04. Topics  External Collaboration  Sharing the BIM model  Sharing Documents  Sharing the 3D model  Reviewing 
Guidelines and structural type library Hannu Penttilä and Sampsa Nissinen Mittaviiva Oy Product modelling guidelines 2006 Structural type library database.
4NJT opt BuildingSMART Munich APRIL ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich.
Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition Irwin/McGraw-Hill.
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
Development and Implementation of Automated Code Compliance Checking Insert name of event Insert location Insert name of instructor Insert date.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
1-1 System Development Process System development process – a set of activities, methods, best practices, deliverables, and automated tools that stakeholders.
1 High Performance Buildings Research & Implementation Center (HiPer BRIC) Proposal for National Lab-Industry-University Partnership Proposal for National.
Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition Irwin/McGraw-Hill.
IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
An Integrated Systems Solution to Air Quality Data and Decision Support on the Web GEO Architecture Implementation Pilot – Phase 2 (AIP-2) Kickoff Workshop.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
A National Hazards Information Strategy (NHIS) Helen M. Wood Director, Office of Satellite Data Processing & Distribution “A coordinated approach for using.
Copyright  2009 Improving MDO in AEC CIFE TAC 2009 Improving Multidisciplinary Optimizaton Methods in AEC 1 Principal Investigators John Haymaker, Assistant.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
April 8-10, 2002 XXXXXXXXXXXXX Business Unit 2002 Action Plan Your Name January 28-30, 2002 MSC.Software: How to Deliver Software Services Systems Fiat.
PTC Creo Unite Technology
Demonstration of Software Interoperability based on the Industry Foundation Classes (IFC) from the International Alliance for Interoperability.
SUSTAINING ENVIRONMENTAL CAPITAL (SEC) INITIATIVE Providing resources for applying ecosystem services in public land & water management.
© ABB Inc. - 1 A robust portfolio of interoperable solutions Getting started with Industrial IT Certification Document# 3BSE042726, September 2005.
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
1 Chapter 1: Product Development in the Changing World Introduction New technologies are changing the world we live in. How can a company succeed in this.
OGC Copyright 2008, Open Geospatial Consortium Making Location Count Building Performance and Energy Analysis (BPEA) Thread 1.Definition of Early Design.
Case: Taking an Existing Intelligence Operation to the Next Level Jens Thieme Head of Market and Competitive Intelligence.
Accounting systems design & evaluation 9434SB 18 March 2002.
Flexible Billings for Projects
Subtitle Statement of Capabilities.
DESIGN TOOLS UPDATE.
Software Project Configuration Management
The Components of Information Systems
BIM & IPD This PPT is about Building Information Modeling (BIM) and
Yogesh Khanzode Senior Manager, GTEC-GIS GPO Whirlpool Corporation
Workshop on distributed architecture and web servcies
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BEEP Integrated Design Process for Energy Efficient Buildings
The Components of Information Systems
Installation Restoration (IR) Collaboration Gateway
Infra program Project outline Helsinki University of Technology
Implementing Revit and Putting ACE BIM and CAD Standards
Project Information Management Jiwei Ma
Infra program Project outline Jouko Kankainen
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Information System Building Blocks
Driving Successful Projects
Presentation transcript:

CLIENT GROUP Owner:End-Users/Tenants: Senate PropertiesHelsinki University of Technology PROJECT TEAM Architect: Arkkitehtitoimisto A-Konsultit Oy Structural Engineer: Insinooritoimisto Magnus Malmberg Oy Building Services (MEP) Consultants & Designers: Insinooritoimisto Olof Granlund Oy Construction Manager & General Contractor: YIT Concept Projektinjohtopalvelut Oy RESEARCH PARTNERS Research Financing Agency: TEKES (National Technology Agency in Finland) Research Collaborator: CIFE (Center for Integrated Facility Engineering), Stanford University

Prepared by Calvin Kam © 2001 CONSTRUCTION Extension to Alvar Aaltos main building in Helsinki University of Technology (HUT)Extension to Alvar Aaltos main building in Helsinki University of Technology (HUT) Consists of a 600-seat auditorium, technical facility, foyer, handicap accessibility and utility improvementsConsists of a 600-seat auditorium, technical facility, foyer, handicap accessibility and utility improvements Tight design and construction scheduleTight design and construction schedule –15 months from programming, through design, construction, to completion Fast-track constructionFast-track construction

Prepared by Calvin Kam © 2001 RESEARCH & DEVELOPMENT Support client and project team in early project decision-makingSupport client and project team in early project decision-making Testing of:Testing of: –product model approach in building services simulation, cost estimations, and construction planning –IFC product model exchanges –project extranet (databank) –visualization tools (QT, photorealistic rendering, VR-EVE) –4D approach Demonstrate benefits and challengesDemonstrate benefits and challenges Share recommendationsShare recommendations Prioritize agenda for further R&DPrioritize agenda for further R&D Disseminate findings and resultsDisseminate findings and results

Leveraging life-cycle value during early project phaseLeveraging life-cycle value during early project phase Time High Low Prepared by Calvin Kam © 2001 Cost of Decision Decision Impact

Cost of Decision Leveraging life-cycle value during early project phaseLeveraging life-cycle value during early project phase Decision Impact Time High Low Prepared by Calvin Kam © 2001

Spatial Visualization End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: Quicktime VR 3D Rendering Geometry Space Materials 3D Geometry ArchiCAD Prepared by Calvin Kam © 2001 Architectural CAD

Prepared by Calvin Kam © 2001 ArchiCAD End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA Thermal Simulation Lighting Mechanical Design Computational Fluid Dynamics Environmental Assessment Life-Cycle Cost

Prepared by Calvin Kam © 2001 ArchiCAD End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA Life Cycle Cost Thermal Performance Environmental Impact HVAC-VRML Internal Design Database Thermal Condition Comfort Requirements Indoor Air Quality Mechanical/Electrical Demands

ArchiCAD End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA COVE TARMO PlaNet Prepared by Calvin Kam © 2001 Cost Estimate & Value Engr. Cost Estimating Scheduling

ArchiCAD End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA COVE TARMO PlaNet Design Spell-Check Cost Estimate Scheduling Internal Database Resources, Cost, Schedule Design Requirements Prepared by Calvin Kam © 2001

ArchiCAD End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA COVE TARMO PlaNet 4D Software 3D Stereoscopic EVE 4D VR-EVE Photorealistic Visuali- zation Construction Planning Prepared by Calvin Kam © 2001 Virtual Reality 3D+Time Visualization

ArchiCAD End-UsersOwnerArchitectMEP DesignersConsultantsContractors Benefits From: MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA COVE TARMO PlaNet Design Spell-Check Cost Estimate Scheduling 4D VR-EVE Photorealistic Visuali- zation Construction Planning Life Cycle Cost Thermal Performance Environmental Impact HVAC-VRML Spatial Visualization Prepared by Calvin Kam © 2001

Different software-specific requirements (e.g. geometry) Ownership of shared information, Legal liability Privilege Protection vs. Loss of data intelligence Interdisciplinary Revisioning IFC file size Lack of IFC-write Software & Middleware Bugs Manual bridging between software outputs and inputs Mass-output capability in project databank Prepared by Calvin Kam © 2001 CHALLENGES:

Different software-specific requirements (e.g. geometry) Ownership of shared information, Legal liability Privilege Protection vs. Loss of data intelligence Interdisciplinary Revisioning IFC file size Lack of IFC-write Software & Middleware Bugs Manual bridging between software outputs and inputs Mass-output capability in project databank ArchiCAD MagiCAD CFX BS-LCA BS-LCC Lightscape RIUSKA COVE 4D Example: Sharing of 3D Geometry Prepared by Calvin Kam © 2001 CHALLENGES:

ArchiCAD MagiCAD CFX LCC/LCA LightscapeRIUSKA COVE4D Different applications require specific bridges and interpretations of 3D geometry. How should we construct and share a product model? Prepared by Calvin Kam © 2001 Reduce 3D polygons with texture map Interior surface continuity Wall breaks at room slab Incorporation of thermal data Boundary continuity and watertight Distinction between material types Geometry break down according to activities Layering and naming comply with database Architectural CAD Cost Estimate & Value Engr.3D+Time Visualization Thermal SimulationLightingMechanical Design Computational Fluid Dynamics Life-Cycle Cost/Environmental Impact

Prepared by Calvin Kam © 2001 Ongoing IFC development (e.g. IFC 2x in HVAC data) Middleware and Plug-ins (e.g. Granlunds BS-Pro) Ongoing research projects (e.g. GLOBEMAN, e-LEGAL, VOSTER, etc.) Software Development Market Demands Custom mapping program and automation tools by companys internal efforts Sharing of research findings and further international collaboration (academia and industry; intra and inter-disciplinary) Prepared by Calvin Kam © 2001 Different software-specific requirements (e.g. geometry) Ownership of shared information, Legal liability Privilege Protection vs. Loss of data intelligence Interdisciplinary Revisioning IFC file size Lack of IFC-write Software & Middleware Bugs Manual bridging between software outputs and inputs Mass-output capability in project databank CHALLENGES:SOLUTIONS:

Prepared by Calvin Kam © 2001 Conventional Practices Design-Bid-Build where Building Services (MEP) consultants and construction engineers join the project after substantial design is in place Project Organization Information SharingDecision SupportProject Collaboration HUT-600 Pilot Project Olof Granlund Oy (building services designers + consultants) and YIT (construction manager + general contractor) have been on board since day 1 BENEFITS Early exchanges of expertise Early exchanges of expertise Interdisciplinary collaboration Interdisciplinary collaboration Awareness of domino effects Awareness of domino effects

Prepared by Calvin Kam © 2001 Conventional Practices Means:mail, faxes, Data types:2D information Data standard:non-interoperable Project Organization Information Sharing Decision SupportProject Collaboration HUT-600 Pilot Project Means:project databank Data types:product model Data standard:IFC-interoperable BENEFITS Less information re-entry Less information re-entry Better risk management Better risk management Higher reliability Higher reliability More time to conduct more valuable work e.g. alternatives, analyses More time to conduct more valuable work e.g. alternatives, analyses

Prepared by Calvin Kam © 2001 Conventional Practices Minimal use of visualization, simulation, or alternative proposals due to lack of time, tools, and data. Project OrganizationInformation Sharing Decision Support Project Collaboration HUT-600 Pilot Project An array of tools and software supports decision among 3 design and 2 building system alternatives all performed within a tight design schedule. BENEFITS Owners, tenants, and end-users are better presented with more simulation analyses and alternatives Owners, tenants, and end-users are better presented with more simulation analyses and alternatives Focuses on performance, life-cycle cost, environmental impacts, etc. Focuses on performance, life-cycle cost, environmental impacts, etc.

Prepared by Calvin Kam © 2001 Conventional Practices Project team may spend crucial time describing project issues during meetings and work independently afterwards. Project OrganizationInformation SharingDecision Support Project Collaboration HUT-600 Pilot Project Project team can all focus on issues with real-time product model and come up with interdisciplinary solutions right in the meetings. BENEFITS Ensures all participants are on the same page Ensures all participants are on the same page Improves interdisciplinary coordination Improves interdisciplinary coordination