PCS Test Group 9 July 2019, Vienna.

Slides:



Advertisements
Similar presentations
The EU Rail Freight Corridors in the context of freight transport on the Europe-Asia landbridge Edyta Jaszczuk-Jezierska Member of the Management Board.
Advertisements

Slovenia and back by train and bus
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
Chapter 23 Geography Review Game Click to Begin Global Interactions- The Age of Exploration Holy Roman Empire Switzerland Rome Paris Madrid.
1 sanofi-aventis R&D Bagneux Research Center 31 avenue Paul Vaillant Couturier Bagneux France Access And Transportation.
Eurostar Train By: S. Ray. Eurostar is a high-speed railway service connecting London with Paris and Brussels. All its trains traverse the Channel Tunnel.
Hit Rail: Support to Interoperability
fresh thinking for powerful marketing
Communication procedures Traffic Management on RFC5 borders
Czech-Slovak Corridor
 BUT …. Terminal pilot REQUEST TO THE CCB
For Using of TAF Test Manager (TTM)
Railway challenge contest
PCS Statistics and main development’s history 2017
PCS Technical Board Vienna, 28th February 2017.
RFC PCS Training Budapest, 8th – 9th February 2017.
PCS Follow up Project Preliminary results.
ZIMS Studbooks Data Tracking, Reports, and Tools
Application of GPS.
TTR IT Implementation Capacity Offer/Request/Allocation
Non-RU Applicant (NRA), PCS UG
RFC Short Term Path Request Pilots
Current activities Vienna, 10th May 2017.
PCS Statistics for the Train the Trainer survey 2017/18
Communication procedures Traffic Management on RFC5 borders
PCS Technical Board 17th October 2017, Vienna.
Envelope Concept report, PCS UG
PCS Outlook PCS User Group 12th September 2018, Vienna.
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
TAF-TSI Train Object 25th June 2018, Prague.
PaP Publication strategy TT2019 – Combined PaP
PCS Technical Board 1st June 2017, Vienna.
EEC Core Team 6th February 2018, Vienna.
PCS Day - Feedback 23th November 2016, Vienna.
Development roadmap PCS Day 2017.
PCS IT Day Operation Points updates from SNCF-Réseau’s interface.
The new C-OSS Timetable features are not fully in line with C-OSS expectations
Timetable Process Quality PCS User Group
Removal of national particularities
PCS User Group 15th February, 2017.
PCS User Group Vienna, 13th September 2017.
PCS Developments – PCS CCB
PCS IT Day 23 November 2017, Vienna.
Retrospective report of the past year
Update timetable in PCS dossier from national system
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
TAF-TSI Pilot PCS Day 2017.
JS Pilot and TEG Meeting, Vienna, 12/02/2019
Handling of PaP identifiers
TSI Compliant PCS Mandatory Interface
Definition and modelling of Train and Path in TAF/TAP TSIs
PCS Link I-TMS 3 PCS IT Day
PR deadline experiences, PCS UG
PCS Envelope Concept Status of the project
Trainings before Problems: New user
RFC Short Term Path Request developments
Envelope concept changes
7/10/2019 7/10/2019 TIS Advisory Board 1030 Vienna, Oelzeltgasse 3/9
Connecting Europe, Railway Undertakings and ProRail
Envelope Concept report, PCS TB
Quick Border Information
Training timeline Train the trainer RFC 1st round RFC 3rd round
Modelling of Train and Path in TAF/TAP TSIs
MaaS Workshop João Vieira (CARRIS) Marco Ferreira (THALES)
TT Quality monitoring on borders
Changes compared to last version
Railway timetabling tools with automatic solutions
Presentation transcript:

PCS Test Group 9 July 2019, Vienna

Recent changes Manual offset Time-zone offset New timetable views (parameter changes and weekly calendar/offsets) Public times Composite relations TSI variant ID constraint Theming of the timetable fields

Still pending Daily train with midnight crossings results false error IM edits the sub-path even if PaP is included Solution for the IM calendar harmonization (sub-path with special allocation status) User variant level calendar and parameter editing Edit agencies in territories Carry forward and copy dossier

Global test cases

Atomic test cases Use the same common parameters along the journey. Check the parameter changes view. Change parameters on some stations. Check again the parameter changes view. Release harmonization or work in Path Elaboration. Set all lights to green. Change the border point and check the impact. Set back the lights to green. Change the calendar and check the impact. Set back the lights to green. Change the timetable at the border and check the impact. Set back the lights to green. At a dwell time to the border and check the impact. Set back the lights to green. Don't fulfil all mandatory parameters. Go to control and check the error message and try the hyperlink for editing. Copy parameters among sub-paths Copy times among sub-paths Try manual offset Use alternative origin/destination and check its impact on the calendar harmonization

Dossiers for IMs ID in PCS Test 3 Route Involved IMs 202062 Barcelona – Perpignan – Rungis SNCF-R, LFP, ADIF 202042 Amsterdam – Emmerich – Basel ProRail, DB Netz, SBB 202043 Torino – Breclav – Zebrzydowicze – Tychy RFI, ÖBB, SZDC, PKP 202081 Budapest – Vienna - München VPE, ÖBB, DB Netz 202102 Berlin – Prague – Vienna – Graz DB Netz, SZDC, ÖBB 202105 Gent – Bad Bentheim – Padborg - Hallsberg Infrabel, ProRail, DB Netz, BDK, Trafikverket

Try a “time-zone” train Eurostar Paris Gare de Nord (SNCF) Calais-Frethun - Faisceau Tunnel (SNCF) Calais-Frethun - Faisceau Tunnel (Eurotunnel) Dollands Moor Sidings (Eurotunnel) Dollands Moor Sidings (NetworkRail) London St. Pancras (NetworkRail) RFC7 Arad (CFR) Curtici (CFR) Loekoeshaza (VPE) Szolnok (VPE) Ferencvaros (VPE) ...or be brave and do a Moscow – Nice 