AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To

Slides:



Advertisements
Similar presentations
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
Advertisements

Computing Strategy of the AMS-02 Experiment B. Shan 1 On behalf of AMS Collaboration 1 Beihang University, China CHEP 2015, Okinawa.
Performance of AMS-02 on the International Space Station DESY Theory Workshop, Hamburg Melanie Heil Supported by the Carl-Zeiss Foundation.
A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
POCC activities AMS02 meeting at KSC October 11 th 2010.
1 AMS-02 POCC & SOC MSFC, 9-Apr-2009 Mike Capell Avionics & Operations Lead Senior Research Scientist ISS: 108x80m 420T 86KW 400km AMS: 5x4x3m 7T 2.3+KW.
Mike Capell / Jan ‘04AMS-02 Electronics1 AMS-02 Avionics FSR-II (21 May 2007) Mike Capell Avionics Lead Senior Research Scientist ISS: 108x80m 420T 86KW.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
Evolution of the gas system control for flight
NOAA Transition to New Direct Readout Systems for JPSS Presented to CGMS-44 Working Group 1, agenda item 3.2.
Evolution of Monitoring System for AMS Science Operation Center
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
AMS Summary 16:00 on Mon 26 Mar 2018 (GMT 085) To
16:00 on Tue 3 Apr 2018 (GMT 093) To 16:00 on Wed 4 Apr 2018 (GMT 094)
AMS Summary 16:00 on Thu 29 Mar 2018 (GMT 088) To
16:00 on Mon 2 Apr 2018 (GMT 092) To 16:00 on Thu 3 Apr 2018 (GMT 093)
AMS Summary 16:00 on Wed 24 Oct 2018 (GMT 297) To
AMS Summary 16:00 on Mon 29 Oct 2018 (GMT 302) To
AMS Summary 16:00 on Wed 31 Oct 2018 (GMT 304) To
AMS Summary 16:00 on Mon 22 Oct 2018 (GMT 295) To
AMS Summary 16:00 on Mon 19 Nov 2018 (GMT 323) To
AMS Summary 16:00 on Thu 15 Nov 2018 (GMT 319) To
AMS Summary 16:00 on Fri 16 Nov 2018 (GMT 320) To
AMS Summary 16:00 on Wed 21 Nov 2018 (GMT 325) To
AMS Summary 16:00 on Wed 14 Nov 2018 (GMT 318) To
AMS Summary 16:00 on Tue 20 Nov 2018 (GMT 324) To
AMS Summary 16:00 on Fri 05 Oct 2018 (GMT 278) To
Launch and On-orbit Checkout
16:00 on Thu 8 Nov 2018 (GMT 312) To 16:00 on Fri 9 Nov 2018 (GMT 313)
AMS Summary 16:00 on Fri 9 Nov 2018 (GMT 313) To
16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
16:00 on Tue 6 Nov 2018 (GMT 310) To 16:00 on Wed 7 Nov 2018 (GMT 311)
AMS Summary 16:00 on Fri 23 Nov 2018 (GMT 327) To
AMS Summary 16:00 on Thu 22 Nov 2018 (GMT 326) To
16:00 on Wed 5 Dec 2018 (GMT 339) To 16:00 on Thu 6 Dec 2018 (GMT 340)
AMS Summary 16:00 on Mon 12 Nov 2018 (GMT 316) To
AMS Summary 16:00 on Fri 30 Nov 2018 (GMT 334) To
AMS Summary 16:00 on Wed 23 Jan 2019 (GMT 023) To
AMS Summary 16:00 on Mon 28 Jan 2019 (GMT 028) To
AMS Summary 16:00 on Wed 9 Jan 2019 (GMT 009) To
AMS Summary 16:00 on Fri 11 Jan 2019 (GMT 011) To
AMS Summary 16:00 on Mon 14 Jan 2019 (GMT 014) To
AMS Summary 16:00 on Thu 24 Jan 2019 (GMT 024) To
AMS Summary 16:00 on Wed 13 Feb 2019 (GMT 044) To
AMS Summary 16:00 on Mon 18 Feb 2019 (GMT 049) To
AMS Summary 16:00 on Fri 15 Feb 2019 (GMT 046) To
AMS Summary 16:00 on Tue 19 Feb 2019 (GMT 050) To
AMS Summary 16:00 on Thu 14 Feb 2019 (GMT 045) To
AMS Summary 16:00 on Thu 10 Jan 2019 (GMT 010) To
AMS Summary 16:00 on Tue 26 Feb 2019 (GMT 057) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
AMS Summary 16:00 on Mon 15 Apr 2019 (GMT 105) To
AMS Summary 16:00 on Thu 11 Apr 2019 (GMT 101) To
AMS Summary 16:00 on Thu 18 Apr 2019 (GMT 108) To
AMS Summary 16:00 on Tue 30 Apr 2019 (GMT 120) To
16:00 on Fri 3 May 2019 (GMT 123) To 16:00 on Mon 6 May 2019 (GMT 126)
Bad Runs Alberto Oliva, July 2012.
AMS Summary 16:00 on Fri 10 May 2019 (GMT 130) To
AMS Summary 16:00 on Mon 13 May 2019 (GMT 133) To
AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To
AMS Summary 16:00 on Wed 22 May 2019 (GMT 142) To
16:00 on Tue 2 Jul 2019 (GMT 183) To 16:00 on Mon 8 Jul 2019 (GMT 189)
AMS Summary 16:00 on Wed 10 Jul 2019 (GMT 191) To
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
AMS Summary 16:00 on Thu 04 Oct 2018 (GMT 277) To
Presentation transcript:

AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To 16:00 on Fri 12 Jul 2019 (GMT 193)

AMS High Rate Data Downlink Rate (Mbps) : 17 -> 22 (5.5h) -> 17 Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Ku-band High Rate (down): Baseline: <17Mbit/s> Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

Main Data Computers (JMDC) Number of Digital Signal Processor (DSP) bit-flips (Auto-fixed): 1 Data Acquisition (DAQ) Readout Data Reduction Detectors DAQ Comp (JINJ) TRD TOF+ACC Tracker RICH ECAL TRD (UDR) TOF+ACC (SDR) Tracker (TDR) RICH (RDR) ECAL (EDR) Trigger (JLV1) TRD (JINF-U) Tracker (JINF-T) RICH (JINF-R) ECAL (JINF-E) Main Data Computers (JMDC) Radiation Heavy nuclei More than 300 active Digital Signal Processor (DSP) for processing subdetectors signal, calculation and system control. DSP bit-flips are checked 4 times per orbit and can be fixed automatically. - Integrated Circuit (Si) + I increasing Bit-flips - a logic state is changed 3 3 3

Flight Ground ISS AMS on ISS Unstable Ku due to bad weather at White Sands, manually set playback OFF for ~0.5 hour. It also caused ~4k events on Laptop only. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Ku-band High Rate (down): Baseline: <17Mbit/s> Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

TTCS pump-SB has no spikes.

Flight Ground AMS Laptop daily logfile downlink OK ISS AMS on ISS ISS (The logfile contains the operation status of the Laptop and is checked by DATA expert everyday to make sure the Laptop is working properly) Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

Flight Ground ISS AMS on ISS Laptop occupancy 93%, DATA experts[A.Pashnin and M.Konyushikhin] informed. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Ku-band High Rate (down): Baseline: <17Mbit/s> Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

Flight Ground ISS AMS on ISS Tracker monitor showed large delay (~6 hours) in one minute root files production since yesterday evening. Now is catching up. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Ku-band High Rate (down): Baseline: <17Mbit/s> Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

Upcoming Events

Jul 12 20:10 (25.5h) : ISS Yaw bias from -4 to -12 for power generation (+58<Beta). (Jul 13 16:00 : Pump OFF, set Tracker Configuration E) Jul 14 03:45 : ISS +XVV->-XVV Jul 14 <tbd> : ISS S-TRRJ (Starboard Thermal Radiator Rotary Joint) ->+50 for TRD gas pump. Jul 14 08:10 : Yaw bias="+184“ Jul 20 18:00 : -XVV TEA Jul 20 18:00 : S-TRRJ to -75 for 59s docking Jul 21 02:00 : S-TRRJ to +25 (nominal) Jul 22 02:27 : ISS -XVV->+XVV, TEA (Jul 22 09:00 : Pump ON) + − PTRRJ STRRJ

Tracker Thermal Control System (TTCS) Projected pump ON/OFF times: Jul 01 - Jul 13 : Pump ON Jul 13 16:00 : Pump OFF (Tracker Configuration E), due to ISS +XVV->-XVV Jul 22 09:00 : Pump ON Aug 03 - Sep 01 : Pump OFF (Tracker Configuration E) Sep 02 - Sep 30 : Pump ON Tracker Thermal Control System (TTCS) Working fluid:CO2 Single phase Two-phase condensers Pump-SB Magnet HX Accumulator space in out Evaporator Tracker TTCB one of two in parallel Radiators 120W +10ºC Fill port

Flight Ground ISS AMS on ISS ISS Avionics Jul 13 17:45 (1.5h) : KU outage. Playback OFF. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC) 12

Flight Ground ISS AMS on ISS ISS Avionics Jul 17 <tbc> (2h) : TBD, Laptop network outage, Joint Station Local Area Network (JSL) v12 Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC) 13

Jul 21 00:50 : 59S dock (launch Jul 20/18:28) Jul 21 00:50 : 59S dock (launch Jul 20/18:28). Luca, Drew, RSA, Yaw="+177“ Jul 23 14:00 : SpX-18 berth (Launch Jul 21/02:00). AMS Laptop upgrade disk aboard. Jul 27 11:12 : Cygnus NG-11 unberth Jul 29 11:12 : 72P Undock Jul 31 17:34 : 73P Dock (launch 212/12:10)

Flight Ground ISS AMS on ISS ISS Avionics Jul 17 23:30 (1h) : NASA software transition to Increment 60. (Certification of Flight Readiness (CoFR) completed Jun 5) Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC) 15

Flight Ground ISS AMS on ISS ISS Avionics Jul 22 <tbc> : ISS Total Downlink 300->600 Mbps. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC) 16

Flight Ground ISS AMS on ISS ISS Avionics Jul 28 <tbd> : Laptop physical relocate Express Rack ER3 to ER9B, no data connections changed Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC) 17

Flight Ground ISS AMS on ISS ISS Avionics Aug 6 <tbc> : Approx. Laptop upgrade T61P->ZBook. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC) 18