11/7 MD 10/31 EA HT DB EA 10/31 11/2 (3) 1 days 11/2 (3) 1 days 7 days

Slides:



Advertisements
Similar presentations
3 Title Blocks and Part Lists Permission granted to reproduce for educational use only. Describe drawing sheet sizes and formats Identify marginal information.
Advertisements

……+(4n-3) = n(2n-1) P 1 = 1(2(1)-1)=1 check.
RULES FOR THE 2013 SOLAR CAR CHALLENGE. Important Dates September 1 to January 31 - “Intent-to-Race” Form This notifies Race Officials of your team’s.
Colby Meyer Dan Smyth Kirsten Kozlovsky Chassis PDR 10.
AIMS and OBJECTIVES TO BUILD A SIMPLE PowerPoint PRESENTATION. To encourage its use in the classroom. THE CONTENT OF SLIDES TO OUTLINE A MANAGEMENT APPROACH.
Transferring the design to CAD – 2D Design Cutting out the design using CAM Folding using a strip heater….. ….. and jig Applying graphics to the final.
Ergonomics Is the study of how the human form moves at work and at play. Ergonomics must be taken into account when products are being designed, because.
Problem Solving Design Process.
Bell Ringer Activity Signed safety wavers can go on my desk. Summative supply check next class (14 points). Singed Safety Waver Binder 50 Sheets of Notebook.
Design & Technology Department Mascalls School Name: Group: Teacher: Date started: E G R U Merits Teacher Comment:
Christopher E. Naujok, P.E., CEP, CSWP Optimizing SolidWorks through Standards.
From Research Prototype to Production
Raj Hirpara Robert Schuld Aakash Soni Bartlett High School 1.
Engineering Development New Products New Product Idea Funnel Trade Shows Visits to Customers Input from Rep’s Input from Sales Mgr. Existing Products.
* When conducting qualitative research one is faced with the difficult task of interpreting the data. The following has been created to help make sense.
GCSE Design and Technology: Product Design
Introduction Are you ready to join a team of animal experts? As part of your application to be the zoo's new coordinator, you must complete several challenging.
Technology and Design Key Stage 3 To model a Mobile Phone Holder Task: II 1.To develop an understanding of modelling! 2. To look at other ideas!
Bell Ringer Complete the Introduction to Technology Worksheet 1. Please finish answering the questions on the introduction worksheet. If you finish early.
Technology and Design Key Stage 3 To design and model a Mobile Phone Holder Task: II Developing ideas through modelling RA Moffatt. AAO.
The Process Design Triggers.
Background: Used to generate a pressure gradient shock wave traveling down a closed tube.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Design Brief This is your opening statement of what you plan to do and what type of light you will be designing and making. First write an outline of the.
Introduction To Engineering Bike Lab #1 - 3 Agenda Estimate bicycle frame weight.
Hello there, Welcome to your Year 8 CAD / CAM project What does CAD and CAM mean? CAD - Computer Aided Design CAM - Computer Aided Manufacture Introduction.
Working Drawings Stephen W. Crown Ph.D.. Working Drawings A final set of drawings providing all the details and information needed to manufacture and.
1.Groups writer 2.Draw graphs when necessary 3.Check data sheet 4.Help with cleanup 1.Ensure tasks are completed in a timely manner 2.Keep group aware.
Raj Hirpara Robert Schuld Aakash Soni Bartlett High School 1.
Preproduction: Engineering Design
Group Design Movement Investigation
EA online application form marking, Approving alternative learning activities and Leaders Award application form marking.
DESIGN AND PROBLEM SOLVING. DESIGN A plan for making something; used to create technology.
BUS OPERATOR WORKSTATION PROCUREMENT PROCESS ORGANIZATIONAL GUIDANCE TOOL 1 Version: February 19, 2016 TCRP Report 185.
Exciting lighting name: group:. product disassembly.
JIG’S AND FIXTURE’S RUBRIC JIG: A.CONSTRUCTION EFFORTS (Parts are secure) PTS B.WORKMANSHIP (Neatness, Layout) PTS C.CONNECTIONS.
creativity originality imagination creativity inspiration novelty
Literacy Focused Task C.A.D
How to Develop a Science Fair Project
EVALUATION AND TESTING
2016 Maintenance Innovation Challenge
Product Design Course Calendar and Personal Learning Checklist
GCSE Graphic Products Revision 2008 Examination.
GCSE Graphic Products Revision 2003 Examination.
Mini brief – Solar powered clock
Sector 002 Assembly status report
Task 15 Explain how to produce models with sufficient information to allow them to be successfully exported to the manufacturing system used.
Objectives: Lesson Nine
Design Process By Jennifer Berry
GCSE Resistant Materials Super Learning Lesson
Systems Analysis and Design
9/30/16 Admit Slip Use the Carb Information Sheet to fill out the half sheet of guided notes, and tape in journal.brad,mike ;)
Welcome We’re using a new cost system for BAJA SAE for the 2018 season. The main change will be moving away from an MS Excel document to an online system.
Technology Assessment at Standish Community High School: Assessment 1
Industrial Technology
Kimberly Gonzalez United Engineering & Technology Magnet
N4/5 Design & manufacture
Assessment Piece – Specification Success Criteria
SNC 1D Science, Grade 9 Academic
Group Design Movement Investigation
Technological Process
RACE CARS (Compressed Air Cars)
California Youth Football Association Certification Procedures
Helideck Lighting – what you need to do before March 2018
Authors: W. Chung et al, ITER Korea Highlights
My design (camera and packaging) may meet the following points:
Mats Olsson Mechanical Designer Target Division-NBEX
Shipboard Cable Trays 07/24/19 Atlanta, GA
The CO2 Dragster TIJ 101 Upon finishing your brainstorming and Final Drawing (with dimensions and ruled lines) The following steps with be taken for fabrication.
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

11/7 MD 10/31 EA HT DB EA 10/31 11/2 (3) 1 days 11/2 (3) 1 days 7 days BOM 10 days 11/2 (3) Aesthetic CAD drawings Mark approval 7 days 10/31 1 days Set Test procedure 1 days Low effort egress ingress EA Finalize metrics Conduct Test Survey Gather volunteer Sidecar experience HT BOM Prototype ready Test Survey Survey 7 days Tube design and bike design DB BOM 10 days 11/2 (3) CAD drawings Mark approval 7 days Ergonomics EA 1 days 10/31 Set Test procedure 1 days Finalize metrics Conduct Test Survey Gather volunteer

JD MD EA 10/31 10/31 EA 3 days 3 days 0.5 day 7 days 0.5 day 1 days DOT requirement Find all requirements Create checklist BOM Complete checklist 7 days BOM Aerodynamic function MD 7 days Measure cross section Set Test procedure Drawings Waiver EA 1 day 10/31 3 days Ingress Time Gather volunteer Finalize metrics Conduct Test Analysis report BOM 7 days Getting proto material Set Test procedure 1 day Gather volunteer 10/31 3 days Egress Time EA Finalize metrics BOM Conduct Test Analysis report Getting proto material

? MD DB MD 3 days 1-3 days 11/2 (3) 3 days 3 days 1-3 days 4 days Research splash requirements Splash proof MD Finalize BOM MArk approval of windshield Complete checklist Create checklist 7 days Storage DB BOM 10 days 11/2 (3) CAD drawings Mark approval Stock lighting 0.5 day 0.5 day 3 days 1 days Find all requirements Create checklist Check light Complete checklist 3 days 3 days 1-3 days 1/7 days 4 days Research windshield requirements windshield MD BOM Finalize windshield acquirement route Mark approval of windshield Complete report Create checklist

HT DB DB JD DB 3 days 1 days 3 days 3 days 1 days 3 days 1 days 7 days Safety HT Find all requirements Create checklist BOM Safety report 7 days 1 days Finalize BOM DB Production Cost Cost report Investigate parts quotes 7 days 1 days 3 days Current bolt pattern DB BOM Dimension frame Parts drawings Finish CAD design 7 days 1 days 3 days 3 days JD Producable in20 hr BOM Finalize material Finalize Manufacturing procedure Manufacturing Reports 7 days 1 days DB Finalize BOM Weight less than 180 lb Weight sheet Investigate parts quotes

8 task added