21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Saturday :12 Stable beams fill 3351 Initial luminosity
Wednesday September 14th
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Tuesday 11th September LHCb dipole presently fault off
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Main aims: LHCb polarity switch, Luminosity production
Monday 6th August & night
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Tuesday Loss maps in the night:
Wire almost entirely through beam before BLM triggers dump
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Sunday
LHC Morning Meeting - G. Arduini
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Tuesday 20 September 2011.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Tuesday
Presentation transcript:

Monday 27th August & night 03:40 Beam dumped by OP due to cryo problem in Pt4, integrated L ~ 56 pb-1. Cryo compressor off in Pt4. Accesses ongoing. 08:00 Start accesses All experiments, point 7 for vacuum interlock re-configuration on spiky gauge, point 6 for orbit corrector, point 4 for BSRT beam 2, point 1 for QPS controller of RQ4.L1, ALICE power converter cooling monitoring 16:00 Cryo conditions back – earlier than announced Get people out of the machine 17:00 Cycling the magnets 18:30 Injecting batches of 6 for steering TI2, seems ok. 19:18 Inject for physics 19:30 No beam anymore from SPS – dump half way filling Extraction septum problem – call specialist 21:47 Injecting for physics again 23:00 Stable beams fill #3009, initial lumi 7.3e33 cm-2s-1 23:27 Beam dump – UFO…… 02:09 Stable beams fill #3011, initial lumi 7.4e33 cm-2s-1 CMS always bit lower than ATLAS 28/08/2012 LHC 8:30 meeting

Cryo Point 4 - Krzysztof Brodzinski 28/08/2012 LHC 8:30 meeting

Philippe Baudrenghien, Gregoire Hagmann RF investigations Over last weeks RF phase noise warning through ramp Phase noise present on Cav4B1 1 turn feedback on this cavity was off probably following the running of a Matlab script that indeed opens the switch Problem present since at least one week, no older logging data The 1 turn feedback generally improves RF phase noise due to beam loading by a factor of 6. This noise gets worse with increased beam intensity… Switched back on the 1 turn feedback and observe on later fills Philippe Baudrenghien, Gregoire Hagmann 28/08/2012 LHC 8:30 meeting

Injection steering TI2 28/08/2012 LHC 8:30 meeting

Fill #3009 UFO 5L4 losses were at 200% of threshold and were spread over RS 3,4, and 5. 28/08/2012 LHC 8:30 meeting

RF fingers 7R7 .... would have dumped if threshold not raised / interlock of valve reconfigured 28/08/2012 LHC 8:30 meeting

Present situation LHCb polarity flip at the end of this fill 28/08/2012 LHC 8:30 meeting

The Plan Physics LHCb polarity change RF batch-by-batch blow-up After this fill .... 15 minutes intervention on LHCb dipole power converter when current at zero for polarity change. Monitoring values of the cooling system of the power converter to be changed. If no beam for 1 – 2 hours, also intervention from LHCb side, but this is presently not foreseen. Followed by fill 2 x 6 bunches to check head-on collisions on all IPs RF batch-by-batch blow-up Long outstanding,1-2 hours at injection Some time later this week 28/08/2012 LHC 8:30 meeting