8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

MKDV switch faults November V. Mertens L. Ducimetière with H. Bartosik, G. Bellotto, C. Boucly, P. Burkel, E. Carlier, D. Comte, S. Huon,
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
PXI-Kicker Generator Control Jan Schipper TE-ABT-EC.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Update on MKI Performance: TS3 to 02/10/2012 M.J. Barnes Acknowledgements: P. Adraktas, V. Baglin, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Caspers,
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
ABT-EC EYETS Activities 2nd reports
Data providers Volume & Type of Analysis Kickers
MKI Performance During 2016 and Plans for EYETS
LBDS TSU & AS-I failure report (Sept. 2016)
Present Status and Future Plans for the MKE Kicker Magnets
Surviving an Asynchronous Beam Dump?
Beam dump at 03:00:
SPS extraction, transfer lines, injection
Friday 15th June 01:11 Injection.
TE-ABT PLC and SCADA usage
Capacitive pick-up on MKP: why, when, who, resources, others
the CERN Electrical network protection system
LHC Risk Review: Kicker Magnet Reliability
FCC hh dump kicker - switch topologies and impact on beam
Summary Friday h38: Ramp down and pre-cycle.
TCM PS – SPS Thyratron Power Trigger Consolidation
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
FCC-hh injection group 7
Initial Experience with the Machine Protection System for LHC
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Power cut 18kV cable for EMD404/E9 is heating
Also on behalf of V. Senaj & L. Ducimetière
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
MKI Operational Experience and Future Plans
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Tuesday 22 November 2011.
Sunday/Monday & :30 Stable beams. Fill #1851.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Friday 28 October 2011.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens MKI2 thyratron erratics (untriggered) turn-ons of 28 July 2011 M.J. Barnes Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens PFN DS MS Notes: 1 RCPS charged 2 PFNs 4 PFNs (2 RCPS) at each of Pt2 & Pt8

MKI2 Erratic of MS3 at 16:30:43hrs ON 28/7/2011 Normal (triggered) turn-on Erratic (untriggered) turn-on of MKI2 MS3 At 16:30:43hrs an erratic (untriggered) turn-on of MKI2 MS3 at full PFN voltage; Interlocks detected erratic. Control (machine protection) philosophy is to trigger all MS and DS of system (within a delay of 1µs). Hence all 4 kicker magnets pulsed for up to 4.5µs. Circulating beam was not in IP2 and therefore not disturbed. Batch was extracted from SPS but saw no kick at MKI and went straight into the TDI. Note: this MS was put in place during last TS and has since made 5 erratics (only last 2 effected beam).

MKI2 Erratic of MS3 at 18:03:09hrs ON 28/7/2011 Erratic (untriggered) turn-on of MKI2 MS3 PFNs 1 & 2 at normal voltage (~50kV) PFNs 4 at low voltage (~33kV) because of PFN3 switch erratic At 18:03:09hrs an erratic (untriggered) turn-on of MKI2 MS3 occurred during resonant charging – sending current to one of the four kicker magnets; Interlocks did NOT detect erratic of MS3 (at 33kV): hence no immediate action was taken to turn-on other thyratrons. PFNs discharged via the DS after 4ms (no further magnet current); The failure occurred early in the charging process, and the extraction from the SPS was inhibited; The circulating beam which was swept over the aperture and protection elements (~17% of normal kick) for ~9µs.

Actions MS3 has suffered 5 erratics since being installed at last TS. It is suspected that electrical noise is a contributor to the problem, but this MS is particularly sensitive to the noise. Thus this switch should be swapped if the fault occurs again soon, or if there is an occasion (LHC stop of several hours, or at the latest in the next TS); There is possibly a dying electronics card (fan out), trigger unit, or some cabling problem (cold soldering, bad contact) AND the erratic detection card for MS3. As a rare event such things could be (although not necessarily) time consuming to solve. Hence the recommendation is to exchange the candidate electronics cards, and maybe part of the cabling as far as accessible, by spares. Future plans include a fast inhibit of SPS extraction in the event that an MKI fault is detected.