March, 2006 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [proposed merger] Date Submitted: [8 March,

Slides:



Advertisements
Similar presentations
Doc.: IEEE c Submission January, 2006 Chun-Ting Chou, PhilipsSlide 1 NOTE: Update all red fields replacing with your information;
Advertisements

March 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Synchronized Beacon Propagation for Spanning.
November 1999 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Mapping the Bluetooth Specification to.
Submission Title: [Add name of submission]
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Add name of submission] Date Submitted:
doc.: IEEE <doc#>
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Discussion of antenna model and channel.
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: WiMedia Liason Report May 06 Date Submitted:
Submission Title: [SG5 Closing Report Mar04]
November 2008 doc.: IEEE November 2008
doc.: IEEE <doc#>
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
September Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ to adaptation.
November, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for PostBeaconDelay in b]
NOV 01 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Application Specific Information Element] Date.
January, 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [60GHz Regulation in Germany] Date Submitted:
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
January 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
Submission Title: [Extend-Superframe and GTS Structure]
Submission Title: IEEE : Management Slots in the MAC.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Submission Title: Comments on discovery and discovery latency
Submission Title: [Common rate resolution]
doc.: IEEE <doc#>
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Enhancing reliability of data transmission.
Submission Title: IEEE : Management Slots in the MAC.
doc.: IEEE <doc#>
Submission Title: [Resolutions for CID 85, 86, and 87]
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c rate-range requirements: looking forward]
Submission Title: [Shared GTS Structure]
January, 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Medium Access Control (MAC) in Wireless.
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [CTA Advertisement for Overlapping Piconets]
September Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ to adaptation.
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
doc.: IEEE <doc#>
Submission Title: [Frame and packet structure in ]
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simplified geometry for the usage model.
doc.: IEEE <doc#>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comment.
doc.: IEEE <doc#>
Jan 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Jan.
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
doc.: IEEE <doc#>
September 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3 Rank Order Voting Process Description.
March 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
January 2000 doc.: IEEE /020r0 January 2000
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [DF6 Radio-burst length over PSDU size] Date.
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Discussion on MAC functionalities Date.
Submission Title: [Proposed Resolution for FSK/GFSK Prior Comments]
Submission Title: [Extend-Superframe and GTS Structure]
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comments.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comment.
January 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Study Group Summary and Motion for .15WG.
doc.: IEEE <doc#>
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
March, 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Summary of ad hoc meetings for potential.
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comments.
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Improve the latency between GTS request.
Submission Title: [Common rate resolution]
Submission Title: [Common rate resolution]
July 2003 doc.: IEEE <03/242> July 2003
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Dependable Interest Group Closing.
Submission Title: TG9ma Agenda for September Meeting
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [21.
12/15/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [AWGN Simulation Results] Date Submitted:
Presentation transcript:

March, 2006 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [proposed merger] Date Submitted: [8 March, 2006] Source: [Chun-Ting Chou] Company [Philips] Address [345 Scarborough Rd, Briarcliff Manor, NY 10510] Voice:[914 945 6099], FAX: [914 945 6330], E-Mail:[chun-ting.chou@philips.com] Re: [N/A] Abstract: [Summary of agreements and proposed merger] Purpose: [Summary of agreements and proposed merger] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. NOTE: Update all red fields replacing with your information; they are required. This is a manual update in appropriate fields. All Blue fields are informational and are to be deleted. Black stays. After updating delete this box/paragraph. Chun-Ting Chou, Philips

March, 2006 A1: Beaconing All mesh-capable devices (including PNC and DEV) should send beacons All beaconing devices may be considered as “PNCs” and therefore, SOP has to be solved 2 1 Master (PNC/FFD) Slave (DEV/RFD) Control & Data path Mesh Control & Data path Data path Mesh Data path 6 A 5 C 3 7 4 8 B 9 Inter-piconet Communications Source: Michael Sim’s presentation 13 Chun-Ting Chou, Philips

A2: Distributed solutions for SOP March, 2006 A2: Distributed solutions for SOP No parent/child/neighbor relationship (distributed, peer-to-peer solutions for SOP) A’s Superframe Source: Michael Sim’s presentation B’s Superframe A A B B C Alignment C’s Superframe A B C “beacon period” Chun-Ting Chou, Philips

A3: Alignment of superframes March, 2006 A3: Alignment of superframes “Protection” via CTA is based on superframes are aligned & synchronized Alignment Medium slot boundary or superframe start time Synchronization distributed nature of both solutions clock drifting Chun-Ting Chou, Philips

Issues being addressed March, 2006 Issues being addressed Alignment Where to align? (both solutions have pros and cons) What to consider? (complexity, power consumption, efficiency) Synchronization Support of CAP Mandatory or optional? How? Chun-Ting Chou, Philips

March, 2006 Proposed Merger When a beaconing device powers up, it scan for at least one superframe and shall attempt to join the existing beacon group, if any (better performance) When two beacon devices (or two groups) observe each other, they shall “cross protect” each other’s beacon transmission (reduced complexity) Chun-Ting Chou, Philips

Power Consumption Beacon Beacon March, 2006 N=3, improvement =194% Wake-up time (~5 ms) Tx/Rx turnaround time (~10 us) Tx/Rx turnaround time +Guard time (~20 us) Beacon Beacon A B C A B C (Tx/RX) 300 mA Power = 70*300*3 + 2000*60*3 =63000+360000 = 373000 (Standby) 60 mA (idle) <1 mA Make it conservative: Wake up time = 2 ms N=3, improvement =194% (Tx/RX) 300 mA Power = 80*300*3 + 2000*60 =72000+120000 = 192000 (idle) <1 mA When N increases, improvement increases ( 327% for N=6, 587% for N=infinity) Chun-Ting Chou, Philips

QoS Support for delay-sensitive Apps. March, 2006 QoS Support for delay-sensitive Apps. Less fragmented superframes Fragmented superframes With less fragmented superframes, PNCs are able to accommodate more time- sensitive applications/streams via CTA re-configuration Delay Requirement A B C A CAP/MCTA or BP With fragmented superframes, the number of sensitive applications/streams can be admitted via CTA re-configuration is limited, even sufficient amount of CTA exists A B C Chun-Ting Chou, Philips

Backward Compatibility March, 2006 Do we need a CAP? Why not How to provide a CAP and its functions Association CAT (slotted Aloha or CSMA/CA) Open MCTA (slotted Aloha or CSMA/CA) Open CTA (slotted Aloha or CSMA/CA) How does a PNC do? For mesh-capable PNC (use content access CTAs listed above) For “legacy” PNC (they do whatever they like) Chun-Ting Chou, Philips