Installation of Flex Floor with Electrical by Show Carpet Specialties “Exceeding the expectations of the trade show industry”
1. Lay your cords.
2. Lay primary layer of pad.
3. Primary layer of pad.
4. Channel in cords.
5. Lay secondary layer of “UPS” pad.
6. Lay Flex Flooring - double face direct to padding - no need for clear tape.
7. Durable enough for forklifts.
8. After forklift was removed, dirt from forklift tires remained.
9. A quick clean up of tire marks.
10. Flex Floor looks new again.
11. Lower view to show how cords are hidden.