CONTRACTOR HSE MANAGEMENT

Slides:



Advertisements
Similar presentations
2009 HBR Safety Excellence Awards Best Practices.
Advertisements

Managing the Health and Safety of Contractors
Short Service Worker Program
1. Manage Yourself Read the PDO House Rules and PDO HSE Golden Rules
CENTRAL TEXAS COLLEGE DECEMBER 2012 FACULTY QUALIFICATION.
MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
Contractor Assurance System AC Overview October 13, 2009.
SIEP HSE Management System
Scope Management Solutions “Best In Class” Technical Support - Small Best Practices Presentation “Materials Management Safety Excellence”
Contractor Safety Management
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
ISNetworld West Texas STEPS Meeting February 10, 2009.
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
ISO 9001 : 2000 Scope 1.1 General This international standard specifies requirements for a quality management system where an organisation a)Needs to demonstrate.
Incremental Pay Progression. Introduction The NHS should have the patient at the heart of everything it does and this includes having the workforce with.
A case study of Quality Standards implementation in TASNEE Company ISO 9001: 2000, ISO 14001:2004 & OHSAS By Abdulgader Alharthi.
1 Borouge reference line 2006 © 2006 Borouge HSE MANAGEMENT OF CONTRACTORS By: Venkatesh Murthy Abu Dhabi Polymers Company LLC (Borouge), Abu Dhabi.
The Management of Health & Safety at Work Regulations 1999
Cover Page - Currently in Graphics Being Designed
Health, Safety and Environment Policy. We are a SafeProduction organization At Vale, we are committed to sustainable development. Meeting the needs of.
Occupational Health & Safety
Occupational health nursing
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Human Resource Management and Planning A critical responsibility for leadership Part 1.
1 Corporate Audit Learnings for Dissemination February 2010 Level 1 HSE MS Audit Learnings.
Contractor Safety Council
Training and Development Prof R K Singh AIMA CME.
Volvox Understanding the Budget Angela Pettit – Contracts Officer.
Insert Contractor Name HSE Letter of Assurance and HSE Capability Questionnaire Verification Insert month, year Opening Meeting.
Tutor2u ™ GCSE Business Studies Revision Presentations 2004 Training.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
Standards for Technical Educators Occupational Safety & Health.
2 AgendaAgenda Why a New Performance Management System 5-Level Summary Rating Appraisal Process Pay-For-Performance What’s Key What Changed/What Stayed.
Teaming and Joint Ventures To “WIN” United States Department of Veterans Affairs Industry Day Palo Alto, CA October 1, 2015 VA Office of Small and Disadvantaged.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Sheila Arbury, RN, MPH, COHN-S Office of Occupational Health Nursing OSHA Case analysis of a young worker fatality: focus on prevention.
A 3-tiered approach to training and retaining new staff.
MANAGING HSE IN CONTRACTS 2016 GU140 (C9). 01 PR1171 PART I & PR1171 PART II Contract HSE Management – Mandatory for CH and Contractor 03 PR1997 Contractor.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
HSE Interview Questions / Answers Series (Part 1)
Leader of the Pack: The Role of the DON in Green House Homes
Continuing Competence is coming
COR™ Associate Auditor Program
TOPS TRAINING.
The following training presentation is for all subcontract employees and is taken upon joining a contract or task order to which we are the Prime vendor.
People and Performance
Indiana University of Pennsylvania Safety Sciences Department
Competence Pack Guide to Assessment.
Human Resource Management
Safety Accountabilities
Management Concepts and Principles
Competence Can Do or Have Done!. Competence Can Do or Have Done!
CR GR HSE 501 – HSE Requirements for Contractors
Quality Management Systems – Requirements
Perception Survey Results 2016
CONTRACTOR HSE MANAGEMENT
(HSE Subcontractor) Improvement Plan Overview By Curtis Moore
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
Internship Bill of Rights
SAFETY LEADERSHIP FOR FRONTLINE SUPERVISORS
Competence Pack Guide to Assessment.
My Performance Journey
HSSE Bridging Overview
Upstream Americas Road Transport Trends & Chronic Unease
My Performance Journey
ICS Staff One person is responsible for overall ICS and can delegate the responsibilities so that for each procedure or task of the ICS, one person is.
HSSE Improvement Plans
Introduction IRM Risk Control Personnel and Capabilities
CR GR HSE 501 – HSE Requirements for Contractors
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

CONTRACTOR HSE MANAGEMENT Contractor Introduction to CSMP Upstream Americas – Contractor HSSE-SD Management Team

Contractor HSSE Management – Why? Contracted work accounts for ~83% of total exposure hours and ~88% of injuries in Shell Upstream Americas (UA); To achieve an injury free workplace Shell and Contractors must be fully aligned in HSSE values and objectives; Shell must recognize and partner with Contractors demonstrating the ability to manage HSSE consistent with Goal Zero.

Mission will be accomplished by turning off non-value added work Contractor HSSE Management – UA Mission Connecting Build meaningful relationships with our contractors Assessing Appraisal and monitoring to verify that contractors are aligned with Shell’s HSSE-MS and expectations to achieve “Goal Zero” Improving Increase influence, expectations and performance Mission will be accomplished by turning off non-value added work

Contractor Selection Process Contractor must be identified as being necessary for the business; Bid situations must consider a Contractors HSSE capability using a weighting system that will award contractors points for exceptional HSSE, as well as technical, capability; Subscription to ISNetworld is required for all Contractors performing High and Medium Risk work. (minimum requirements are verified); Contractors performing Low Risk work activities do not require an HSE-MS Pre-qualification assessment or subscription to ISN. However, the work will be managed using Shell Safe Work Practices or by an approved Contractor HSE-MS.

Contractor Selection Contractor selection should be limited to those that are in ISN with a Yellow or Green ISN Dashboard grade. Preference should be given to Green Contractors; Contractors performing High Risk work will receive a pre-qualification assessment to confirm ability to manage HSSE Risk and alignment with Shell’s HSE MS. A “Stoplight Band” will be given and will supersede the ISN dashboard grade; Continuous monitoring throughout the life of the contract including Business Performance Reviews, Contractor Forums and various field and office evaluations to review HSE Improvement Plans.

Shell Specific HSSE Instructions 12 Life Saving Rules; Short Service Employee Policy; Contractor personnel with less than six (6) months in the same job type or with his/her employer shall be considered a Short Service Employee (SSE) and must have a designated mentor to assess competency Road Transport Standards (Journey Management) Lifting and Hoisting Standard; Temporary Piping Standard; Subcontracting Policy; Contractor HSE Handbook; HSE Improvement Plan

Contractor HSSE Management Questions?