Ajay Goyal Department of Water Resources August 9, 2007

Slides:



Advertisements
Similar presentations
CCWD: Using DSM2 Historical July20, Two Applications of the DSM2 Historical Model: Modeling Contaminant Spills and Using Salinity Fingerprints to.
Advertisements

Pilot Project Alternatives FRANKS TRACT San Joaquin River False River Old R i v e r Sacramento River Operable Gates in Three Mile Slough Alt #1 Operable.
U.S. Fish and Wildlife Service Cay Goude Ryan Olah Steve Detwiler Victoria Poage Derek Hilts U.S. Bureau of Reclamation Mike Chotkowski Lenny Grimaldo.
Upstream Boundary (Section V.1). 1. Delta boundary, daily inflow 2. Extend upstream channel by 45 miles, daily inflow 3. Hourly inflow at Freeport boundary.
1 San Joaquin River Exchange Contractors Water Authority WEF- Central Valley Tour April 23, 2014 Mission Statement : To effectively protect the Exchange.
Using the minimum distance as a metric for testing is ambiguous when fish have greater than two channels to move into. Fish GPS position during each day.
SWRCB Modeling I Historical Modeling Tara Smith, Delta Modeling Section Department of Water Resources Tara Smith, Delta Modeling Section Department of.
. Achieving California’s Water Supply and Delta Ecological Improvement Simultaneously. Achieving California’s Water Supply and Delta Ecological Improvement.
F Sherman Island Sacramento River San Joaquin River God, United Methodists, Nature, and California Water.
Delta TRIM Hydrodynamic modeling in CASCaDE Nancy Monsen USGS/Menlo Park IEP Modeling Workshop Tuesday, May 26, 2009.
Water Quality Model: Flow Input Needs and Low Flow Selection December 14, 2011 Laura Weintraub.
The little fish in California’s water supply: delta smelt “DRERIP” conceptual model overview Matt Nobriga and Bruce Herbold for National Academy of Sciences.
Transport processes: Time scale correlation between flow and scalar concentration Chris Enright CWEMF DSM2 Workshop February 6, 2007.
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
California: “Water Flows Uphill to Money” DZ05 Lecture 12/5/2005 Sources: Cadillac Desert, by Marc Reisner, 1993, and POD Documents.
Southern California Water Committee March 26, 2010 Ontario KARLA NEMETH, Natural Resources Agency.
Urban Water Institute Conference August 22,
California Geology - 4 California Water Project California has several major rivers, canals, and aqueducts.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
Managing Water and Fish: The 2014 California Drought William Stelle, Jr. NOAA Fisheries West Coast Region Seattle, Washington May 2014.
Study for Fish Screens at Existing Delta Facilities Dr. Leah Orloff Water Resources Manager CUWA Board MeetingJuly 24, 2009.
Draft Recommendations of the San Joaquin Water Quality Management Group Plan for Achieving Salinity/Boron and DO Objectives Plan for Achieving Salinity/Boron.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Where to From Here Jerry Johns, DWR EWA Development of OCAP Proposal.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting March.
Delta Passage Model: A quantitative framework for integrating and understanding water project effects on migrating salmon Funded by Metropolitan Water.
Species or RunONDJFMAMJJAS Fall Chinook Late fall Chinook Winter Chinook Spring Chinook Steelhead Delta smelt Figure 1. Comparison of the timing of life.
DSM2 Performance Measures Tara Smith CWEMF Annual Meeting February 26, 2007 Delta Modeling Section Bay Delta Office.
Hydrologic Conditions Update and Outlook for Flood Season December 2013 Hydrology and Flood Operations Office Division of Flood Management Department.
Central Valley Flood Protection Board Update Presented by: Michael Mierzwa, P.E. Lead Flood Management Planner California.
UNDERSTANDING THE DELTA - AN ENGINEERING PERSPECTIVE.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Project Status South Delta Improvements Program Project Status November 2003.
Changes to the 1995 Water Quality Control Plan Program of Implementation Presented by: Steve Ford Department of Water Resources.
DSM2 Analysis of Water Level and Water Quality in the South Delta Presented to California Water and Environmental Modeling Forum February 26, 2007 Fingerprinting.
SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
The Rio Grande River Created by Ms. Gates, The Rio Grande Task : Students will identify the Mississippi, Ohio, Rio Grande, Colorado, and Hudson.
San Joaquin River Water Quality Modeling- A Beginning SJR-DO TMDL Technical Work Group Presentation Russ Brown- Jones & Stokes January 20, 2005.
Drought Management Sheri Looper CVP Water Resource Specialist.
California Water Supply Overview Robert Shibatani CEO & Consulting Hydrologist The SHIBATANI GROUP, Inc.
Delta Cross Channel Gates. A “gate” formulation ——— Q =  A 3 √ 2g  h Matthai,H.F Measurement of peak discharge at width contractions by indirect.
CAMT, DOSS & DJFMP Triggers, Indices, and Objectives Decision Tree Diagrams.
Introduction Joint Presentation of State Water Contractors and San Luis & Delta-Mendota Water Authority.
South Delta Gates and Barriers Some Slides borrowed from Mark Holderman.
Model Description Sample Results Next Steps Monitoring Data (Initial Conditions) Hydrodynamics Water Quality USGS; DWR Monitoring Data (Initial Conditions)
Why We Need the California Water Fix
Presented by Jon Traum, P.E.
Water Resource Management Planning Update
CWEMF Annual Meeting March 2005
Delta Water Conveyance — Water Project Operations and Risks
Walker River Irrigation District
In-Delta Storage Program
Methyl Mercury Concentrations and Loads in the Delta
Issue 4b - Addressing Local Degradation -
Delta Risk Management Strategy
Water Resource Management Planning Update
Open water area Franks Tract
The Rio Grande River Created by Ms. Gates, 2010.
Scour Analysis on the west fork of the Duchesne River
Why We Need the California Water Fix
In-Delta Storage Program
Ajay Goyal Department of Water Resources August 9, 2007
Sacramento Environmental Commission January 2019.
James Gilbert, PhD Nancy Parker
Presentation transcript:

Ajay Goyal Department of Water Resources August 9, 2007 Franks Tract Project Ajay Goyal Department of Water Resources August 9, 2007

Project Objective To improve the water quality of export water and possibly benefit fisheries

Franks Tract Project - Alternatives Three Mile Slough West False River

West False River Alternative Sacramento River Three Mile Sl. San Joaquin River Operable Gates Old R i v e r False River FRANKS TRACT San Joaquin River

Three Miles Slough Alternative Operable Gates Sacramento River San Joaquin River Three Mile Sl. Old R i v e r False River FRANKS TRACT San Joaquin River

Three Miles Slough Alternative Sacramento River Three Mile Sl. San Joaquin River FLOOD TIDE Old R i v e r False River FRANKS TRACT San Joaquin River

Three Miles Slough Alternative Sacramento River Three Mile Sl. San Joaquin River EBB TIDE Old R i v e r False River FRANKS TRACT San Joaquin River

Three Miles Slough Alternative Sacramento River Three Mile Sl. San Joaquin River NET FLOW Old R i v e r False River FRANKS TRACT San Joaquin River

Three Miles Slough Alternative Sacramento River Three Mile Sl. San Joaquin River NET FLOW EXPORTS FLOWS Old R i v e r False River FRANKS TRACT San Joaquin River

Three Miles Slough Alternative Sacramento River Three Mile Sl. San Joaquin River Close on EBB Tide Old R i v e r False River FRANKS TRACT San Joaquin River

Obermeyer Gates

Obermeyer Gate - Cross Section GATE PANEL IN RAISED POSITION GATE PANEL IN LOWERED POSITION

Three Mile Slough - CLOSED During Portion of Ebb Tide Base Condition

Three Mile Slough- CLOSED Base Condition Three Mile Slough- CLOSED

Net Daily Average Flow Diversion = 3000 cfs for July Particle Tracking Summary June 1996 3000 Particles Released - Near Rio Vista CVP - Base SWP - Base CVP - TMS Gate Closed SWP - TMS Gate Closed Net Daily Average Flow Diversion = 3000 cfs for July

Possible Operations of Three Mile Slough Gate Closed during portion of ebb tide Benefit Fisheries Improve WQ Can be used in lieu of DCC gates Complete closure for some time Degrade WQ Closed on Portion of Flood Tide ???

Important Points Strategically located between Sacramento River and San Joaquin River Capability to move net flows INWARD or OUTWARDS Three Mile Slough much smaller than Sacramento River Sacramento River - 2500 ft wide Three Mile Slough - 550 ft wide

Discussion Ajay Goyal 916-651-9823 agoyal@water.ca.gov