69 kv arc flash burn.

Slides:



Advertisements
Similar presentations
Use of Rubber Gloves & Protectors for Underground Cable Splicing
Advertisements

Murray State University
CLOW WATER Contractor Orientation April
1 Hazardous Energy Module 5. 2Objectives After this module you should be able to – identify the most common energy hazards – take the necessary steps.
When working on or near electricity or electrical equipment you must be trained in & use Electrical Safety Related Work Practices NFPA.
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
Electric Arc-Flash Injury Reduction Program Herman O. Kemp Electrical Safety Consultant Safety Program Consultants, LLC.
What is Arc Flash? Arc flash is a short circuit through air that flashes over from one exposed live conductor to another conductor or to ground. Arc flash.
Qualified Persons Working On Or Near Energized Equipment
Electrical Safety Safety Training Series
NFPA 70E - Awareness Training1 NFPA 70E Standard for Electrical Safety in the Workplace Article 130.7(C)(1-7) – Personal Protective Equipment.
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
Transformer Taking the ratio of the two equations
GENERAL INDUSTRY SAFETY TEST. What does OSHA stand for? 1.Occupational Safety and Health Administration 2.Occupational Safety and Help Administration.
1 Electrical Safety- Related Work Practices In and around the mines AND The home.
Take 5 for Safety E. Lessard May 12, Arc Flash Event at INL Involving Situational Awareness Barrier  On April 15, 2015, Idaho National Lab workers.
Electrical Safety and Electrical Safe Work Practices EHS Course #525 Reference EHS Electrical Safety Procedure
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Electrical Hazards Temporary Wiring and Lighting Systems.
A SUMMER TRANNING PRESENTATION ON 400 KV GRID SUB STATION BIKANER
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
Electrical Burn Incident 24-Nov Volt Breaker Panel Cable being removed This panel is mounted on an old Joy transformer skid. Note that the panel.
ETP 2161C Week #1 HV Power Circuit Breakers (Text book ref.) This course will refer to the following text book, chapter and page #. Power Line Worker:
Electrical Safety.
Lightning Safety.
MSHA Machine Guarding.
Electrical Safety Lesson 7.
XTO Energy Safety Training
Welding Safety Test Review
Fall Protection.
March 27, 2012 Arc Flash Event © ABB February 7, 2012 Slide 1.
PDO Second Alert What happened:
Electrical Equipment CSP uses conventional electrical equipment in the majority of areas All installations follow the mandatory electrical codes The.
DILO’s 2017 SF6 Gas Management Seminar Best Practices Dealing with Decomposition in Gas Insulated Equipment November 16, 2017 Neil Hutchins Equipment.
Hand and Finger Injuries
INTRODUCTION TO OSHA Lesson
Electrical Equipment CSP uses conventional electrical equipment in the majority of areas All installations follow the mandatory electrical codes The.
Personal Protective Equipment
INCIDENT: A 50 T crane was lifting pressure equipment skid (2.5 ton) from the wash bay area to wellhead equipment area. The crane was positioned in between.
Contractor Injury – Electrical Arc Flash Washington Site
Electrical Safety.
Safety Learning: Could This Happen in Your OC
Always use the right means of access for working at heights jobs
Murray State University
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Voltage Regulator Bypass
Wye/Delta 240/480 4 wire Transformer Bank
PDO Second Alert What happened? Your learning from this incident..
Voltage Regulator Bypass
Lineman Contact.
C 4 Insulator Changeout With Hoists
Electrical Safety Lesson 7.
Identify, Verify & Monitor Barriers
Stay out of the “Line of Fire”
PDO safety advice Use this Alert: Discuss in Tool Box Talks and HSE Meetings  Distribute to contractors  Post on HSE Notice Boards  Include in site.
Click anywhere to get started…
C3 Insulator Changeout With Jib
URD Radial Feed Transformer Changeout
Check equipment prior to start the job
C3 Insulator Changeout With Jib
C3 Insulator Changeout With Hoists
Line Down Single phase © 2018 Iowa Association of Electric Cooperatives.
  Key Learning: Ensure all grooves / ditches are covered or filled
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
Odawa Substation Outage
Lineman driving a bucket truck, rolled the truck and was killed
Electrical Hazards By Kory Hildebrand.
Isolation Link Operation
Presentation transcript:

69 kv arc flash burn

Contractor was hired to remove two oil breakers from transmission substation. Note the hose in substation draining oil from oil breaker prior to moving breaker. These breakers were being replaced with gas breakers.

Warning tape Notice the Danger/Warning tape around the breakers. Crew that responded to the outage noticed that tape appeared, depending on how you looked at it, to enclose the breakers being replaced. At first glance this could look to be the area cordoned off to stay away from.

Metal tape measure used to measure bushing height Contractor was hired to pump oil and haul breakers. Contractor who was already pumping oil walked up to energized breaker and with a metal tape attempted to measure the height of breaker.

Contact point on bushing Contractor pumping oil and hauling breakers attempted to measure height of oil breaker. Unfortunately it was an energized breaker, not one of the two that were open, tagged and grounded. Tape made contact hear and we believe arced to the side of the tank.

Hole in gravel from fault

Appears to be re-rod arcing to ground??

Oil hose in background. Burn on side of breaker and small hole in gravel.

Injuries Contractor was rumored to have second degree burns over 100% of his body Unknown if he was wearing Arc Rated FR No further information has become available Reported to have been many “suits” in sub after accident At least three companies involved in this incident A public owned sub Transmission company has equipment in their sub Transmission company hired contractor to move their breakers Unclear if Job Briefing was completed Breakers were properly tagged and grounded prior to accident