04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
Advertisements

Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Week 32 Started with luminosity production…
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Wednesday 31 October: Morning
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Thursday 10th May - morning
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Friday 14th December - morning
Thursday :00: Physics fill from the night shift
Tuesday 22 November 2011.
Friday Morning 7:30 injection for fill 2908
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Sunday/Monday & :30 Stable beams. Fill #1851.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Friday 28 October 2011.
Tuesday In the morning test cycle with probe for Q’ measurement.
Fri :52 Stable beams fill #2536
Thursday
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday morning / afternoon
Saturday Luminosity production 1380 bunches
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 26 October 2011

Wednesday 6:22 back in stable beams, Fill 2254 Beam intensity: 1.9E14 Bunch intensity: 1.4E11 Initial luminosity: 3.5 1033 cm-2s-1 Integrated Luminosity: 34 pb-1 09:30 Beam dump due to cryo fault sector 12 (false temperature reading, most likely SEU) Access PM56 to change power converter, RQT13.R5B1. Problem with MAD. ~1 hour lost because key not returned by RP piquet. 13:35 injection of probe beams 14:22 injection physics beams Problems with BPM back: no data from several crates (front-end memory issue). Mitigated by reboot, but coming back. Parking position of TDI in P8 set to +/-20mm (for crosschecking dependence of vacuum on TDI position)

Two independent problems with BPM First problem solved by 18:00: Two BPM front-ends (interlock crates in pt6) were sending too much data to the OFC (50 Hz vs. nominal 25 Hz) which overloaded the OFC. Traced to new version of the BPM phase-in application, and reverted back to old version (Eva, Serkan and Ralph). 18:43 injection physics beams but again BPM data missing (injection line B2 and ring). Beam dumped due to injection losses. Second problem (maybe) solved by 20:00: missing BPM data due to memory issue: One of the BPM turn by turn data concentrators was left in a setting for acquiring every bunch for a large number of turns at injection. Setting was apparently put in place for the 90m Beta* MD and left in afterwards (Ralph and Verena)  injection line BPM data back

Fill #2256 and #2257 20:32 Steering injection lines. 21:19 injection for physics fill 2256 22:54 stable beams Beam Intensity: 1.98E14 Average bunch intensity: 1.43E11 Peak luminosity: 3.66 1033 cm-2s-1 Beam losses during last part of squeeze up to 50% of thresholds in IP2 and IP7 23:03 beam dump: Power converter, trip of RCS.A34B1 Integrated Luminosity: 1.8 pb-1 (9 minutes stable beams) 23:54 injection probe beam fill 2257 00:57 beam dump: RQTF.A67B1 tripped during the squeeze, likely the well known conflict between QFB and QPS (no QPS post mortem data available)

Fill #2258 1:50 injection probe beam fill 2258 3:52 stable beams Beam Intensity: 1.95E14 Average bunch intensity: 1.41E11 Peak luminosity: 3.56 1033 cm-2s-1 4:33 beam dump: dilution kicker power supply  access to exchange (in the shadow: BLM and aperture kicker access) Integrated Luminosity: 8.2 pb-1 MQ27L2 QPS not ok, quench buffer being sent repeatedly: access planned at 7:20 (RP piquet needs 1 hour to come)

Vacuum spike IP8 during injection

Others Two dry-runs of the squeeze function for IP2. The one at 4:56 was successfully finished without trip.

Outlook Now – Friday morning: Luminosity production Friday (24 hours) preparations for ion run using proton pilot beams ALICE squeeze to 1.0 m, beta beating measurement Aperture measurement Checking/setting injection orbit Saturday – Sunday 16:00 (End of proton physics 2011) : Luminosity production 18:00 Sunday – 6:00 Saturday 5 November: MD block 4 Others: Enhance satellites to 1-2% (currently at 0.1-0.2%) of main bunches: aim for LHC test fill Thursday afternoon. Main bunch intensity around 1.2E11 Maybe end of fill study reducing the ADT gain (check beam lifetime, emittance growth, luminosity lifetime) Friday (ion preparation): ADT changing crate computers and install blow-up functionality