Update of the heating of ALFA detector in 2011

Slides:



Advertisements
Similar presentations
D. Lipka, MDI, DESY Hamburg; Temperature Simulation DCCT at PETRA III D. Lipka, MDI, DESY Hamburg.
Advertisements

Impedance of the TOTEM Roman Pots Nicola Minafra, Benoit Salvant, Nicolò Biancacci, …
Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Outcome of yesterday’s brainstorming on the potential of using CALIFES or CTF3 electron beam for impedance studies Elias Métral, Benoit Salvant, Carlo.
TDI longitudinal impedance simulation with CST PS A.Grudiev 20/03/2012.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
2012 activities of the ICE impedance working group and plans for
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
Studies of impedance effects for a composite beam pipe for the experimental areas Request from M. Galilee, G. Schneider (TE/VSC)
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
IMPEDANCE OF Y-CHAMBER FOR SPS CRAB CAVITY By Phoevos Kardasopoulos Thanks to Benoit Salvant, Pei Zhang, Fred Galleazzi, Roberto Torres-Sanchez and Alick.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Update on BGV impedance August 1 st 2013 Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano.
Update on wire scanner impedance studies
Simulation of trapped modes in LHC collimator A.Grudiev.
LTEX report at LMC: Status of impedance studies of the LHC forward detectors planned to be upgraded during LS1 (in particular ALFA and TOTEM) Olav Berrig.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
11 Update of the SPS impedance model G. Arduini, O. Berrig, F. Caspers, A. Grudiev, E. Métral, G. Rumolo, B. Salvant, E. Shaposhnikova, B. Spataro (INFN),
Beam induced heating Benoit Salvant, with the invaluable input and help of many colleagues: Collimation team: Oliver Aberle, Ralph Assmann, Roderik Bruce,
First results of calculation of wakefields for the LHCb experimental chamber. Rainer Wanzenberg, Olga Zagorodnova Desy Hamburg February 2, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
News and hot topics Impedance meeting 14/04/2014.
Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team.
Main activities and news from the Impedance working group.
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
Update on new triplet beam screen impedance B. Salvant, N. Wang, C. Zannini 7 th December 2015 Acknowledgments: N. Biancacci, R. de Maria, E. Métral, N.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
Longitudinal impedance of new RF fingers O. Berrig, C. Garion, B. Salvant.
Impedance Working Group Update ICE meeting June 12 th 2013.
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
General – mode matching for transverse impedance being compared with CST and infinitely long pipes (Nicolo) – Carlo found a way to disentangle direct space.
F. Caspers, A. Grudiev, E. Métral, B. Salvant
Longitudinal impedance of the SPS
Finemet cavity impedance studies
Simulation of 200 MHz RF cavities. 11 cells preliminary results
Benoit Salvant, Kyrre Sjobak, Christine Vollinger, Na Wang
Follow up on SPS transverse impedance
New results on impedances, wake fields and electromagnetic fields in an axisymmetric beam pipe N. Mounet and E. Métral Acknowledgements: B. Salvant, B.
Update on the impedance studies of the SPS wirescanners
Update on PS Longitudinal Impedance Model
Heating of ALFA detectors
CST simulations of VMTSA
Impedance working group update
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
News Request to install SLAC collimator in SPS
LHC COLLIMATOR IMPEDANCE
Discussion on the TDI impedance specifications
Simulation of Monopole modes trapped in LHC collimator
Simulation of trapped modes in LHC collimator
Impedance working group update 21st August 2013
Longitudinal Impedance Studies of VMTSA
Simulations and RF Measurements of SPS Beam Position Monitors (BPV and BPH) G. Arduini, C. Boccard, R. Calaga, F. Caspers, A. Grudiev, E. Metral, F. Roncarolo,
LHC Morning Meeting - G. Arduini
Beam dump for J-Parc neutrino facility
Simulation of Monopole modes trapped in LHC collimator
HBP impedance calculations
IP8 aperture measurements (07:30-10:30)
Collimator design with BPMs (TCTP)
C. Zannini, G. Rumolo, V.G. Vaccaro
Multiphysics simulations of impedance effects in accelerators
Impedance working group update 07th August 2013
EM simulations of the LHC beam screens including the weld
Two beam coupling impedance simulations
PS KFA45_17 Wire Measurements and Simulation
Presentation transcript:

Update of the heating of ALFA detector in 2011 F. Caspers, P. Fassnacht, A. Grudiev, S. Jakobsen, E. Métral, B. Salvant

Beam intensity Temperatures in 7L1 Temperatures in 7R1 Beam energy Courtesy Sune Jakobsen et al Detector temperature cannot increase by more than 40 degrees Temperature increased by max 18 degrees in 2011 interesting to note that the temperature increase started already at injection

ALFA SMARTEAM references for the relevant CATIA drawings: ST0243713_01 CST model

CST simulations for ALFA 3D model imported from Catia Time domain Ferrite 4s60 model 40 m wake (100 m for the model with no ferrite)

Power spectrum and impedance Top energy Impedance simulated by CST in Ohm Measured power spectrum from Philippe and Themis

Power loss calculations Top energy Total loss  15W

CST eigenmode f ~ 0.96 GHz R ~ 23kOhm Q ~ 700 Ferrite on the wrong side?

CST simulations for ALFA No ferrite 2 ferrites (current situation) 4 ferrites

Power loss at top energy and injection Vs detector gap Slightly worse at injection smaller loss for bigger gaps

Outlook Do we need to worry for 2012? What to do to understand more? Do we take the detector out? Cooling (as TOTEM)? Change location of ferrites? What to do to understand more? Measurements with wire on a bench Simulations with HFSS

TOTEM installed cooling, but when it is off: