CHAPTER 4 Job Costing © 2012 Pearson Prentice Hall. All rights reserved.

Slides:



Advertisements
Similar presentations
Copyright © 2008 Prentice Hall. All rights reserved 3-1 Job Costing Chapter 3.
Advertisements

Job-Order Costing.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 2 Systems Design: Job-Order Costing.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4 2/14/05.
4 - 1 Job Order Costing Chapter Learning Objective 1 Describe the building-block concepts of costing systems.
CHAPTER 4 Job Costing. To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved. 4-2 Basic.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Job Order Costing Chapter 4.
CHAPTER 4 Job Costing. To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved. 4-2 Basic.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Transactions Work in Process Control: Job No ,000 Job.
Job Order Costing Chapter 17 Exercises.
The Islamic University of Gaza
CHAPTER 4 Job Costing Copyright © 2015 Pearson Education, Inc. All Rights Reserved.
CHAPTER 4 Job Costing. Basic Costing Terminology… Several key points from prior chapters:  Cost Objects including responsibility centers, departments,
19 Job Order Costing Accounting 26e C H A P T E R Warren Reeve Duchac
Chapter 16. Distinguish between job order costing and process costing.
Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
4 - 1 Job Order Costing – Chapter 4 Describe the building-block concepts of costing systems. Learning Objective 1.
CHAPTER 4 Job Costing. B ASIC C OSTING T ERMINOLOGY … Several key points from prior chapters: Cost objects—including responsibility centers, departments,
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
27-1. Job Order Cost Accounting Section 1: Cost Accounting Chapter 27 Section Objectives 1.Explain how a job order cost accounting system operates. McGraw-Hill©
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 3 Cost Accumulation for Job-Shop & Batch Production Operations.
Lecture 6 COSTING SYSTEMS 1 Job Costing Reference : Course Text Chapter 2.
Product and Service Costing: Job-Order System
The Islamic University of Gaza
1-1 CHAPTER 3 Job Costing Dr. Hisham Madi. 1-2 Basic Costing Terminology  Because of the complexity of most manufacturing operations, companies need.
Chapter 16. Distinguish between job order costing and process costing.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective Distinguish actual costing from normal costing.
3 - 1 Job Order Costing Chapter 4 Job Order Costing.
Chapter 20-1 Chapter 20 Job Order Costing Accounting Principles, Ninth Edition.
A control account is a summary account within a general ledger that accumulates the details of an account in a subsidiary ledger.
Job costing  Several key points from prior chapters: ◦ Cost Objects – include responsibility centers, departments, customers, products, etc. ◦ Direct.
Copyright © 2015 McGraw-Hill Education. All rights reserved
Job-Order Costing: A Microsoft Excel-Based Approach
Chapter 17 Job Order Costing
Prepared by Debby Bloom-Hill CMA, CFM
Chapter 3 Costing Systems: Job Order Costing
Chapter 4 Chapter 3 Job Order Costing Job Order Costing.
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
Job-Order Costing: Cost Flows and External Reporting
Systems Design: Job-Order costing
Copyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved.
Job Order and Process Costing
Job-Costing and Process-Costing Systems
Job Costing.
Chapter 4 Job Costing.
Job Order Costing Chapter 2.
Process Costing Chapter 04 Introduction to Managerial Accounting
The Islamic University of Gaza
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
CHAPTER 4 Job Costing.
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
2 Job Order Costing Learning Objectives
Job-Order Costing Chapter 2
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
JOB-ORDER & BATCH COSTING By DR. O. J. AKINYOMI
Metode Harga Pokok Pesanan Dr Rilla Gantino, SE., Ak., MM
Systems Design: Job-Order Costing
Job Order Costing and Analysis
17 Job Order Costing Financial and Managerial Accounting 13e
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
Chapter 17 Job Order Costing
CHAPTER 3 Product Costing and Cost Accumulation in a Batch Production Environment Chapter 3: Product Costing and Cost Accumulation in a Batch Production.
Chapter 17 Job Order Costing Student Version
Process Costing Chapter 04 Chapter 4: Process Costing
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
CHAPTER 4 Job Costing Chapter 18 Spoilage, Rework, and Scrap
CHAPTER 4 Job Costing © 2012 Pearson Prentice Hall. All rights reserved.
2 Job Order Costing Managerial Accounting 13e C H A P T E R Warren
Presentation transcript:

CHAPTER 4 Job Costing © 2012 Pearson Prentice Hall. All rights reserved.

Basic Costing Terminology… Several key points from prior chapters: Cost objects—including responsibility centers, departments, customers, products, and so on Direct costs and tracing—materials and labor Indirect costs and allocation—overhead

…logically extended Cost pool—any logical grouping of related cost objects Cost-allocation base—a cost driver is used as a basis upon which to build a systematic method of distributing indirect costs. For example, let’s say that direct labor hours cause indirect costs to change. Accordingly, direct labor hours will be used to distribute or allocate costs among objects based on their usage of that cost driver.

Costing Systems Job-costing—system accounting for distinct cost objects called jobs. Each job may be different from the next, and consumes different resources. Wedding announcements, aircraft, advertising Process-costing—system accounting for mass production of identical or similar products. Oil refining, orange juice, soda pop

Costing Systems Illustrated

Costing Approaches Actual costing—allocates: Normal Costing—allocates: Indirect costs based on the actual indirect-cost rates times the actual activity consumption. Normal Costing—allocates: Indirect costs based on the budgeted indirect-cost rates times the actual activity consumption. Both methods allocate direct costs to a cost object the same way: by using actual direct-cost rates times actual consumption.

Costing Approaches Summarized

Seven-Step Job Costing Identify the job that is the chosen cost object. Identify the direct costs of the job. Select the cost-allocation base(s) to use for allocating indirect costs to the job. Match indirect costs to their respective cost-allocation base(s).

Seven-Step Job Costing Calculate an overhead allocation rate: Allocate overhead costs to the job: Budgeted Allocation Rate x Actual Base Activity For the Job Compute total job costs by adding all direct and indirect costs together. Budgeted Manufacturing Overhead Rate = Budgeted Manufacturing Overhead Costs Budgeted Total Quantity of Cost-Allocation Base

Sample Job Cost Document

Sample Job Cost Source Documents

Job Costing Overview

Journal Entries Journal entries are made at each step of the production process. The purpose is to have the accounting system closely reflect the actual state of the business, its inventories, and its production processes.

Journal Entries All product costs are accumulated in the work-in-process control account. Direct materials used Direct labor incurred Factory overhead allocated or applied Actual indirect costs (overhead) are accumulated in the manufacturing overhead control account.

Journal Entries Purchase of materials on mredit: Materials Control XX Accounts Payable Control XX Requisition of direct and indirect materials (OH) into production: Work-in-Process Control X Manufacturing Overhead Control Y Materials Control Z

Journal Entries Incurred direct and indirect (OH) labor wages Work-in-Process Control X Manufacturing Overhead Control Y Cash Control Z

Journal Entries Incurring or recording of various actual indirect costs: Manufacturing Overhead Control X Salaries Payable Control A Accounts Payable Control B Accumulated Depreciation Control C Prepaid Expenses Control D

Journal Entries Allocation or application of indirect costs (overhead) to the work-in-process account is based on a predetermined overhead rate. Work-in-Process Control X Manufacturing Overhead Allocated X Note: Actual overhead costs are never posted directly into work-in-process.

Journal Entries Products are completed and transferred out of production in preparation for being sold. Finished Goods Control X Work-in-Process Control X

Journal Entries Products are sold to customers on credit. Accounts Receivable Control X Sales X The associated costs are transferred to an expense (cost) account. Cost of Goods Sold Y Finished Goods Control Y Note: The difference between the sales and cost of goods sold amounts represents the gross margin (profit) on this particular transaction.

Flow of Costs Illustrated

Illustrated General Ledger in a Job Cost Environment

Illustrated Subsidiary Ledger in a Job Cost Environment

Accounting for Overhead Recall that two different overhead accounts were used in the preceding journal entries: Manufacturing overhead control was debited for the actual overhead costs incurred. Manufacturing overhead allocated was credited for estimated (budgeted) overhead applied to production through the work-in-process account.

Accounting for Overhead Actual costs will almost never equal budgeted costs. Accordingly, an imbalance situation exists between the two overhead accounts. If Overhead Control > Overhead Allocated, this is called Underallocated Overhead If Overhead Control < Overhead Allocated, this is called Overallocated Overhead

Accounting for Overhead This difference will be eliminated in the end-of-period adjusting entry process, using one of three possible methods. The choice of method should be based on such issues as materiality, consistency, and industry practice.

Three Methods for Adjusting Over/Underapplied Overhead Adjusted allocation rate approach—all allocations are recalculated with the actual, exact allocation rate. Proration approach—the difference is allocated between cost of goods sold, work-in-process, and finished goods based on their relative sizes. Write-off approach—the difference is simply written off to cost of goods sold.