802.15 Liaison Report Date: 2010-09-17 Authors: September 2010 September 2010January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE 802.11-08/xxxxr0 September 2010 802.15 Liaison Report Date: 2010-09-17 Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
Abstract Liaison report on 802.15 as presented to 802.11 September 2008 January 2009September 2008 September 2010January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 September 2010 Abstract Liaison report on 802.15 as presented to 802.11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
September 2008 September 2010January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE 802.11-08/0697r0 doc.: IEEE 802.11-08/xxxxr0 September 2010 802.15.4 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 802.15.4e MAC amendments First Initial WG ballot LB53 on D1.0 closed May 17, 2010. Results were 120/43/15. 73.62% Affirmative: Fails 1643 comments: 1152 Technical, 491 Editorial Resolved all comments Authorized editor to incorporate comment resolutions into draft Go out for second Initial WG ballot after draft is complete Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
802.15.4f RFID Working on writing the first draft. September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 802.15.4f RFID Working on writing the first draft. Draft still not yet finished; hoping to finish in November and go out for first Initial WG ballot after November meeting Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
802.15.4g Smart Utility Networks September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 802.15.4g Smart Utility Networks First Initial WG ballot LB51 on D1.0 closed May 12, 2010. Results were 128/45/12. 73.99% Affirmative: Fails 1816 comments: 1301 Technical, 515 Editorial Resolved all but 13 technical comments and all editorial comments Edited draft to reflect comment resolutions Authorized to start a new Initial WG Ballot Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 802.15.4h Corregendum First WG ballot on D1.0 closed May 13, 2010. Results were 160/7/18. 95.81% Affirmative: Passed! 111 comments: 65 Technical, 46 Editorial Still working on resolving comments Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
802.15.4i Rollup Chair nominations and confirmation Reviewed D00 September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 802.15.4i Rollup Chair nominations and confirmation Reviewed D00 Decided on new editorial structure for 802.15.4 Agreed to list of changes for D01 Voted to go to initial letter ballot Probably incorporate 802.15.4h into draft; 802.15.4h goes away Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
802.15.6 Wireless Body Area Networks September 2008 November 2007 September 2010January 2009September 2008 doc.: IEEE 802.11-07/2752r1 doc.: IEEE 802.11-08/1003r0 September 2010 802.15.6 Wireless Body Area Networks First Initial WG Ballot LB55 closed July 8, 2010. Results: 122/37/14; 76.73%. Passed! Total 2418 comments Resolved all but 13 comments. Made and passed motion to resolve remaining comments with “reject” but with no reason. Empowered editor to create draft 2, but gave no instructions to the editor. Deficiencies in process were pointed out in closing plenary. Recirculation is put off until November, and deficiencies will have to be addressed. Slide 9 Slide 9 Page 9 Page 9 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems
802.15.7 Visible Light Communication September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 802.15.7 Visible Light Communication First recirculation WG ballot on D2.0 closed April 7, 2010. Results were 104/19/28. 84.55% Affirmative: Passed! 810 comments: 397 Technical, 413 Editorial Finished resolving all comments: 4 days of ad-hoc last week, all possible session time this week (including evenings) Now editing comment resolutions into draft. Also editing results of MEC into draft. Hoping to start first recirculation WG ballot in late early October Empowered a Comment Resolution Oversight Committee to act on behalf of WG to oversee comment resolution process after recirculation. Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
Low Energy Critical Infrastructure Monitoring September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 Low Energy Critical Infrastructure Monitoring PAR and 5C approved by Study Group and WG 15-10-0756-04-leci-sglecim-par-draft.docx 15-10-0757-02-leci-sglecim-5c-draft.docx Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
Personal Space Communications September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 Personal Space Communications PAR and 5C approved by Study Group and WG 15-10-0635-03-0psc-sg-psc-draft-par.doc 15-10-0636-02-0psc-sg-psc-draft-5c.doc Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
References This document All Documents September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 September 2010 References This document All Documents https://mentor.ieee.org/802.15/documents Current draft is in the members-only area http://www.ieee802.org/15 Members_Only_Area 802.11 members log in using 802.11 username and password Slide 13 Clint Chaplin, Samsung Electronics Page 13 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics