Helene Felice 02/15/2013 HiLumi Meeting HQ Program

Slides:



Advertisements
Similar presentations
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
Advertisements

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
LARP Internal Review of the MQXFA Mechanical Structure Design and Functional Requirements 7/16/2015 Dan Cheng, Helene Felice Development of the Shell-Based.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
MQXC Nb-Ti 120mm 120T/m 2m models
MQXF Design and Conductor Requirements
TQS Overview and recent progress
TQ Program and Review Charge
HQ02b Preload Increase - Summary
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Mechanical tolerance analysis for the MQXF prototype structures
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
LARP Technology Quadrupole Review
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
Glyn Kirby Magnet AssemblyTechniques.
MKQXF FEA Model Haris Kokkinos
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
FRESCA2 - Coils 1+2 scenario
Magnet design, field calculations
Long term behavior and high MIITs test in the LARP program
Cross-section of the 150 mm aperture case
Presentation transcript:

Helene Felice 02/15/2013 HiLumi Meeting HQ Program HQ02 Plans for assembly Helene Felice 02/15/2013 HiLumi Meeting HQ Program

Outline Magnet overview HQ02 Assembly plan - Key focus areas Assembly: timeline 02/15/2013 H. Felice

Overview of the HQ magnet parameters 4.3 K 1.9 K Typical Iss 17.3 kA 19 kA Gradient at Iss 195 T/m 213 T/m Peak Field at Iss 13.6 T 14.8 T Stored energy at Iss 0.9 MJ 1.1 MJ Fx per octant per unit length at Iss 2.7 MN/m 3.15 MN/m Fy per octant per unit length at Iss -3.9 MN/m -4.7 MN/m Fz per magnet end at Iss 1.06 MN 1.28 MN In absence of HQ02 short sample limit, the HQ01e numbers will be used as references in these slides 02/15/2013 H. Felice

Structure and assembly steps overview Collar-pack assembly 4 collars bolted against the full length G10 keys Shimming of the alignment key to ensure contact between collar and keys Coil-pack assembly 4 pads bolted around the collars Final assembly and loading Master/bladders and Keys stack is prepared based on coil-pack assembly Insertion of the coil-pack in the yoke shell sub-assembly by sliding on the bottom masters Insertion of the side and top masters Masters include load keys and bladders + pull shims Key parameters to watch Preload level Alignment: collar and key must be in contact Preload uniformity Coil-pack assembly Collar pack assembly Bladder slot Master 02/15/2013 H. Felice

HQ02 Azimuthal Preload Target Room temperature preload transfer function Conservative Target preload ~ 200 T/m Target Preload at 300 K: eq shell / pole = 863 me / -450 me sq shell / pole = 66 /-63 MPa Target Preload at 4.2 K: eq shell / pole = 1905 me / -720 me sq shell / pole = -169 / -147 MPa 02/15/2013 H. Felice

Focus area # 1: Alignment (I) Room temperature preload transfer function Different transfer function depending on: collar / key contact or absence of contact 02/15/2013 H. Felice

Focus area # 1: Alignment (II) Room temperature preload transfer function Different transfer function depending on: collar / key contact or absence of contact HQ01a-b: no alignment HQ01c-d-e: alignment Importance of key/collar shimming Use of pins and feeler gauges to quantify gaps 02/15/2013 H. Felice

Focus area #2 Preload distribution and uniformity Previously HQ assemblies and previous LARP magnets exposed the importance of matching the coil OD to the collar/pad ID Preload distribution on the coil OD can be controlled by adjusting the radial shims Attempt to correlate with CMM measurements Adjustment made using Fuji pressure sensitive film during collar pack assembly 2 IR collars available 02/15/2013 H. Felice

Focus area #2 Preload distribution and uniformity among coils HQ01d HQ01e Assembly Assembly θ = -62 6 MPa θ = -43 20 MPa Adaptive shimming made based on coil pole SG readings improved preload uniformity among coils Excitation Coil 8 Excitation Coil 8 02/15/2013 H. Felice

Focus Area #3 Apply a conservative preload to avoid degradation 02/15/2013 H. Felice

HQ02 Preload Target summary Conservative Azimuthal Target preload ~ 200 T/m Target Preload at 300 K: eq shell / pole = 863 me / -450 me sq shell / pole = 66 /-63 MPa Target Preload at 4.2 K: eq shell / pole = 1905 me / -720 me sq shell / pole = -169 / -147 MPa Axial Preload sz rod = 60 / 160 MPa Axial preload was never an issue in HQ Fuji paper used to evaluate ideal radial shimming Adaptive shimming is a possible option if spread between SG is larger than 10 MPa 02/15/2013 H. Felice

Timeline By the end of the week: coil arrangement Week of 02/18/2013: Iteration on collar pack assembly Week of 02/25/2013 Coil pack finalized Electrical QA of the coil-pack Coil pack insertion in the yoke-shell sub-assembly Coil end-shoe preparation for axial pushers and bullets Week of 03/04/2013 Azimuthal and axial Preload Starting week of 03/11/2013 Electrical QA before pizza-box assembly Pizza-box assembly Instrumentation prep for testing at FNAL … 02/15/2013 H. Felice

Additional Material

Coil pole SG during assembly HQ01c HQ01d HQ01e 02/15/2013 H. Felice

Shell SG during assembly HQ01c HQ01d HQ01e 02/15/2013 H. Felice

HQ01d Coil sq distribution 02/15/2013 H. Felice

HQ01 baseline 02/15/2013 H. Felice

Azimuthal HQ01a Preload Targets Initial preload target based on Gss = 219 T/m at 19.6 kA (design values) Targets: eq shell = 1028 me at 300 K and 2086 me at 4.2 K eq pole = -536 me at 300 K and -828 me at 4.2 K In terms of stress sq shell = 78 MPa at 300 K and 185 MPa at 4.2 K sq pole = -76 MPa at 300 K and -159 MPa at 4.2 K 02/15/2013 H. Felice