Pulsar Construction Schedule

Slides:



Advertisements
Similar presentations
Tara Plastics Business Process Planning Workshop Tara Plastics Business Process Planning Workshop Presented by: The Georgia Tech Center for Manufacturing.
Advertisements

NATECH PLASTICS INC Julia Goldbach Avenue Ronkonkoma, New York (631) Fax: (631) Quality! Customer Returns.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Seven Helpful Charts Diane Ritter. The Charts Cause-and-EffectRun (Trend) Chart Measure Time Flow ChartPareto Chart Measure Histogram Measurement Measure.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
Result of KITES Science Materials Support Ensuring continuous materials support for 1,500 teachers and 80,000 students from 170 schools and 23 districts.
Project Management October 2011 Inf Sys 3810 Information Systems Analysis Fall 2011 Understand Project Management principles.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Negotiated Agreement: 4 Main Components Articles 12 and 25 Salary Benefits GSA MOU (Class Size) (GSA=Grade Span Adjustment. Was called CSR=Class size Reduction)
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
2017/4/22 Chapter 7 ~ HOMEWORK ~ By: Prof. Y. Peter Chiu.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
 A. 8,000  C. 7,000  6,000  D. 5,000 Estimate the sum by rounding each number to the nearest thousand and then adding. 2, ,584.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
1 SundayMondayTuesdayWednesdayThursdayFridaySaturday April, 2005 Theme, Invitations Weekly Status.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
1 Pixel Detector General –July Evidence of galvanic corrosion in EU barrel cooling tubes. Recovery plan implemented, this problem now solved but…..
10.3: rational exponents April 27, Objectives 1.Define rational exponents 2.Simplify expressions that contain rational exponents 3.Estimate the.
SE503 Advanced Project Management
1 Norfolk Girls Softball Technical Operations Roles & Responsibilities November, 2011.
Dell’s Core Competency
BA7201: Operations Management Assignment - II Q1: Compute the Net Requirement and timing of production for each component Q2: Draw up the projected available.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
WEEK 1 You have 10 seconds to name…
Progress with DDIA-30 Mark Rivers Yanbin Wang Clayton Pullins.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Now that I built it, How much did it Cost?
ZDC CRANE PROJECT Y. Onel September 28, Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
Invitaion From Choi Island: Online Board Game Using C 멘토 : 권상구 멘토님 (KOG) 담당교수 : 고석주 교수님 팀원 : 박용남 ( ) 최재진 ( ) 김민규 ( )
A new College & Career Readiness Assessment for Nevada Recommendations from the evaluation of proposals received for RFP 3132.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
MGT 445 Week 3 Individual Negotiation Strategy Article Analysis Use the Electronic Reserve Readings link for the course, the Internet, or other resources.
PSY 410 Week 5 Individual Assignment Case Study · Select one of the case studies located in Case Studies in Abnormal Behavior. Obtain instructor approval.
PSY 425 Week 5 Individual Article Review ​ To purchase this material click on below link 425/PSY-425-Week-5-Individual-Article-
SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board April 11, 2017.
US TileCal Meeting at UT Arlington
Tour - session 5 Sales Order entry
VISIT OUR WEBSITE TO SHOP TODAY! VISIT OUR WEBSITE TO SHOP TODAY!
Oracle APS and GOP – Getting To Automated Sales Order Scheduling
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
Seven Helpful Charts Diane Ritter.
What is your FICO IQ Quiz? Link to article attached.
Awarded Vendors Bid No MS Packaged Ice Delivery Service Contract Term ends 5/2/2023 (6 years) Board Approved PA# Vendor Vendor# Vendor Contact .
Awarded Vendors Bid No MS Preventative Maintenance & Repair Service for Kitchen Equipment Contract Term ends 6/30/2023 (6 years) Board Approved.
ENGR 480 In-progress Review <Group Name> Spring 2017
Beam Finder Wire Assembly Undulator System
Reserved for Intro Picture
Project Name – ID # 7/1/2009 Current Project Status Project Issues
Board of Regents Capital Projects Review & Approval Process
Бази от данни и СУБД Основни понятия инж. Ангел Ст. Ангелов.
TSF Upgrade Project Overview Resources Plans and Timetable
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)

AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
AmeriComp Background AmeriComp industries manufactures specialized PC components and sells them to other businesses. Customers may send Purchase Orders.
General Records Retention Schedule
Procedure PP, Project Plan Configuration
BUY BOARD.
Set Up For Success : Reviewing Manufacturing Best Practices
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

Pulsar Construction Schedule Assembly vendor-Altron Inc loacated in Anoka, MN QTY 2 first article Production 43 units PC vendor is Proto Express (placed by Altron)

All long lead components have been purchased by The Univ of Chicago They are being shipped today First blank boards must be tested and approved by The University of Chicago Vendor expects to deliver first item by end of April (HaroldMJS): Negotiations are in progress. Harold’s best current estimate is that after we approve the first board, the rest will come in about 3 weeks.