SAR MEBT Bilbao March Mats Lindroos

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Requirements Structure and Status for NCFE
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 1. Some recent views ( ) 2 Linac tunnel
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
ESS-Bilbao: MEBT vacuum standarization
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
ESS – Enabling discovery Mats Lindroos Head of Accelerator Lund October 2014.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
PBI task force intermediate report Stephen Molloy.
ESS Vacuum Standardization
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Bruno POTTIN, Anne-Catherine CHAUVEAU
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
Software and Systems Integration
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Cryogenic C&C Scope of work
Tom Shea Front End Meeting Catania
Installation Binder / IRR – an example
Roles and responsibilities for Testing and Commissioning at AD
RF systems introduction
CDR2&3 Communication Scheme
Risk, Schedule, Deliveries
Bunker Internal Review Welcome & Charge
Welcome and charge to the committee
Introduction CDR Normal Conducting Linac LLRF
Testing Coordination at ESS
MEBT FC, WS, SC and EMU Status
MPS commissioning at ESS
APTM and GRID interface requirement PBIP and PBW
Safety Readiness Review (SRR) Thomas Hansson, ESH
MEBT SAR BUNCHER CAVITIES
Machine Protection PLC Based System Verification and Validation Plan
High Level Readiness Reviews
Licensing update ESHAC #7, October 2017
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Status of the ESS High Power RF Systems
CHIC: Possibilities of Supply
Welcome CDR MPSID and MPSVAC, European Spallation Source ERIC, Lund, Sweden A. Nordt
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Vacuum Control System for Monolith Vacuum
MRV system budget and scheduling Short overview installation
Rack installation and local tests for the MEBT Chopper Rack
Overview of the TARGET Monolith Rough Vacuum
Procedure for MEBT installation in the accelerator tunnel at ESS
Project Support Meeting January 9, 2019
Presentation transcript:

SAR MEBT Bilbao 27-28 March Mats Lindroos Chair of the review committee European Spallation Source ERIC MEBT SAR in Bilbao – March’19

System Acceptance Review for the MEBT https://chess. esss. lu The SAR is meant to be the final technical review of the system as tested before delivery to ESS, Lund. As such, it examines the final technical design and tests of the integrated system. This SAR is for the MEBT. It covers in detail the system readiness of all MEBT beam line and rack components. The buncher RF distribution system and the RF rack components are handled separately. The scope for the review includes: System verification of all MEBT components (magnets, buncher, chopper, collimator and beam instrumentation including their rack components) The IRR Committee conducts this review of design with the authority of ACCSYS Project Leader, Mats Lindroos, and ESS Chief Executive Officer, John Womersley. The Committee serves in an advisory capacity to: the ACCSYS WP3, WP7 Leaders and the ACCSYS management team

Agenda https://indico.esss.lu.se/event/1224/

Charge Will the MEBT system meet its technical specifications? Are the interfaces between the various components and subsystems that compose this system completed defined in terms of: a) physical connection – location and type of mating flanges, location and type of power and cable connections, support stands etc. and b) physical parameters (pressure, temperatures, current, voltage, etc.) Have all interfaces between this system and other systems been completely defined and agreed. Are all requirements on the tunnel (like temperature stability, etc) been agreed? Has an integrated control system (both hardware and software) been developed and tested that permits control of the system, collection of data and integration of this system into accelerator operations? Is the planned document delivery in accordance to the In-Kind Agreement in terms of format and scope? Are the alignment requirements agreed upon and can the system components be aligned within these requirements? Have all recommendations from component design reviews been addressed?

Review committee Name Organisation Appointment for IRR Mats Lindroos ESS, Head of Accelerator Division Chairman of the Review Committee Håkan Danared ESS, Linac Group Leader Review Committee member Thomas Shea ESS, Beam Instrumentation Section Leader Mamad Eshraqi ESS, Beam Physics Mario Perez ESS Bilbao, Executive Director   Fabien Rey ESS, Survey, Alignment & Metrology Group Leader Reviewer Marcelo Juni Ferreira ESS, Vacuum Systems Leader Edgar Sargsyan ESS, WP3 Deputy Leader Ibon Bustinduy ESS Bilbao, Project Leader Bjorn Rundcrantz ESS, mechn. quality Stefan Arvidsson ESS, electr. quality Karl Vestin ESS, ICS Georg Hulla WP3 installation leader Observer Laurence Page Vacuum and procedure to connect to the LEBT and the MEBT Pedro Gonzalez ESS-BILBAO / Tech. Director ESS-BILBAO / PM Presenter Giles Harper ESS-BILBAO / LPS Javier Martin ESS-BILBAO / Mech. Assembly Alignment Alexander Conde Aitor Zugazaga ESS-BILBAO / Vacuum Juan Luis Muñoz ESS-BILBAO / QUAD David Fernandez Nagore Garmendia ESS-BILBAO / BUNCHER Seadat Varnasseri ESS-BILBAO / PBI Angel R. Páramo Idoia Mazkiaran ESS-BILBAO / Control Igor Rueda ESS-BILBAO / Mech. Roberto San Martin ESS-BILBAO / COUPLER Arturo Ortega ESS-BILBAO / EBW Janet Schmidt MEBT machine section coordination ESS Joao Paulo Martins ESS, ICS, Control System Integrator Clement Derrez ESS, Beam Instrumentation (non-Bilbao contribuition)