NorWays “Providing decision support for introduction of Hydrogen in the Norwegian energy system” 3 år (2006-2008) Totalbudsjett ~ 6,9mill NOK Partnere:

Slides:



Advertisements
Similar presentations
DEVELOPMENT AND TRANSFER ON TECHNOLOGIES UNFCCC EXPERT WORKSHOP Beijing, April, INFORMATION CLEARING HOUSE COMMENTS AND OPTIONS Carlos A. Grezzi.
Advertisements

Desert Knowledge Symposium 2008 Marnie Ireland Supervisor: Dr. Fay Rola-Rubzen Sustainable Freight Out Here?
Watershed Approaches and Community Based Planning
Introduction to TIDE Transferability Methodology TIDE Workshop: Transferring walking innovation in the European context Walk21, Munich, 11 th September.
The Global Authority on the Environment Workshop on Communication of Environmental Information Arendal, October, 2001.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
1 WGA Clean and Diversified Energy Advisory Committee Briefing Brian Horii Energy and Environmental Economics, Inc
The Process of Interaction Design. Overview What is Interaction Design? —Four basic activities —Three key characteristics Some practical issues —Who are.
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Optimizing Pathways and Market Systems for Enhanced Competitiveness of Sustainable Bio-Energy BIOTEAM Contract number: IEE/12/842 Project duration: 36.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Expert Group on New and Renewable Energy Technologies (EGNRET) APEC 21 st Century Renewable Energy Development Initiative Cary Bloyd Argonne National Laboratory.
AdriaMed Expert Consultation Interactions between capture fisheries and aquaculture Rome, Italy November st Coordination Committee (2000)
Towards a policy paper for Italy: Voluntary tools in the implementation of the European low carbon strategy in Italy: the Covenant of Mayors and other.
The INTENSE project: Improving Energy Efficiency in the Building Sector Workshop: Sustainable Energy Action Plans in Latvia: Regional Cooperation,
Generation Portfolio Options Study Philip O’Donnell Manager, Generation Analysis 14 October 2009.
1 Enabling environments for technology transfer under the UNFCCC Daniele Violetti Programme Officer, Technology Climate Change Secretariat (UNFCCC) UNFCCC.
Gary MarsdenSlide 1University of Cape Town Human-Computer Interaction - 4 User Centred Design Gary Marsden ( ) July 2002.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Introduction of the Study of the GEF Contributions to the South China Sea Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
Background very brief summing up of the NSS conclusions Background very brief summing up of the NSS conclusions Dr. Elewa.
The partnership principle and the European Code of Conduct on Partnership.
IAEA International Atomic Energy Agency Nuclear Power Infrastructure Development Technical Meeting/Workshop on: TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT:
Methodology used by SWIFTLY Green 26th November 2015 Gernoth Götz, Prof. Markus Hecht Berlin Institute of Technology (Technische Universität Berlin) Contact:
Analysis in the Hydrogen Program DOE Hydrogen Program Annual Review May 9-11, 2000 Livermore, CA Margaret K. Mann National Renewable Energy Laboratory.
Eureca – European Ecosystem Assessment Proposal 3 March 2008.
1. 2 Director General Department of Management Department of Nuclear Safety and Security Department of Technical Cooperation Department of Nuclear Science.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Driving Innovation Competition Scope and Background Merlin Goldman 27 September 2011.
IEA DSM Programme Task XV: Network-Driven DSM Dr David Crossley Task XV Operating Agent and Managing Director Energy Futures Australia Pty Ltd.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
Title of presentation Copyright IDS and MeTA 2010
Florian Sauter-Servaes
3rd International Scientific Conference on "Energy and Climate Change"
LO1 - Analyse the impact and influence which the macro environment has on an organization and its business strategies 1. P1 Applying appropriate frameworks,
IRSC 2009 Båstad Learning from failure: Research initiatives towards improving safety and reliability of the Swedish railway system Alexander Wilhelmsson.
Development and Energy in Africa
APEC 21st Century Renewable Energy Development Initiative
International Energy Agency
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
Wrap-up of Workshop 2 - Innovation and Competitiveness
Regional System Analysis of Introduction of Hydrogen in Norway
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
ENGINEERING ECONOMIC DECISION CHAPTER 1
The Two Most Common Types of Contemporary Planning Techniques
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
An Introduction to STAGES
Build operate and transfer project delivery System in Saudi Arabia
Proposal for MSFD risk-based approach project in OSPAR region
Competitiveness of the regional market, importance of statistics and innovations THE ROLE OF RESEARCH CENTERS IN PROMOTING OF RESEARCH Sarajevo, 8th.
Updating of Methodological Guidance on Art. 6(3)&(4)
Balanced Approach to Noise Mitigation
Workshop 1: PROJECT EVALUATION
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
European Commission, DG Environment Air & Industrial Emissions Unit
The Two Most Common Types of Contemporary Planning Techniques
Pilot River Basin Water Framework Directive.
Session 1: The report on CIS-members´ views on the experience in the implementation of the economic aspects of the WFD.
Accelerating the Deployment of Offshore Renewable Energy Technologies - Project Proposal - Michael Paunescu Renewable and Electrical Energy Division.
TF 2 meeting in Milano (11-12 October)
Marketing Case Study Analysis Methodology
Balanced Approach to Noise Mitigation
European Commission, DG Environment, Marine Unit
Stakeholder Engagement
Enabling environments for technology transfer under the UNFCCC
Presentation transcript:

NorWays “Providing decision support for introduction of Hydrogen in the Norwegian energy system” 3 år (2006-2008) Totalbudsjett ~ 6,9mill NOK Partnere:

Objectives The main objective of this project is to provide decision support for introduction of Hydrogen as energy carrier in the Norwegian energy system The main objective will be achieved by pursuing the following sub-goals: Documenting how introduction of hydrogen as energy carrier in Norway is influenced and restricted by the characteristics of the existing Norwegian energy system Developing alternative scenarios and identifying market segments and regions of the Norwegian energy system where hydrogen may play a significant role, with focus on early markets Developing suitable, regionalized models for analysing an introduction of hydrogen as energy carrier in competition with other alternatives (natural gas/electricity/district heating/bio-fuels) Suggesting viable pathways and providing well-founded recommendations for introduction of hydrogen in the Norwegian energy system based on modelling and evaluation (in an iterative process with national stakeholders) of the most relevant scenarios, market segments and regions Establishing a common arena for exchange of knowledge and experience with the aim of reaching consensus between Norwegian stakeholders by organization of national workshops for development of robust methodologies and identification and discussion of viable pathways for introduction of hydrogen

Research tasks Synthesis of available information on the Norwegian energy system Completing and updating existing databases Identification of market segments and geographical regions Development of methodology and regional models Analysis and evaluation of various scenarios, segments and regions Final assessment and recommendations for introduction of hydrogen Project management and coordination towards other activities

2006 Preparatory phase This project has 3 years duration divided into the following Three phases: Preparatory Phase Establishment of background information & models (2006) Iterative Analysis and Evaluation Phase (4th Quarter of 2006 - Medio 2008) Wind-up Phase Development of recommendations (3rd & 4th quarters of 2008) The preparatory phase of the project will include synthesis of available information on the Norwegian energy system, completing and updating of existing databases as well as development of methodologies and regional models. This phase will involve identification of appropriate criteria for selection of pathways based on a wide range of parameters, categorised into: technical (efficiency, reliability, availability/maturity), economical (investments and maintenance), commercial (markets), political (incentives) and environmental (emissions).

Tidsplan