November 8, 2010 Dallas, Tx Session #70 802.16m Opening Report November 8, 2010 Dallas, Tx Session #70 2010-11-08 IEEE 802.16m-10/0033r1
802.16m Opening Report – Dallas Into Session #70: One SDD CR SB 3nd recirculation: 88% return rate; 89% approval (29 disapprove votes) SB Comments to be resolved at Session #79 on D9 Amendment Text (802.16-10/0052r1) 259 non-editorial: 159 MAC 3 Maintenance 34 PHY 6 General 57 Other 85 editorial comments TBD reply comments 120 contributions 67 MAC 19 PHY 3 Femto/SON 1 Multi-BS MIMO 8 Relay 2 LBS 3 e-MBS 10 ASN.1 7 Other 2010-11-08 IEEE 802.16m-10/0033r1
802.16m Opening Report- Dallas Plan for the week: Review and approve P802.16m PAR Extension request C802.16-10/0033 Resolve ALL Sponsor Ballot comments Resolve single SDD CR (TGm opening) Scheduled evening sessions (Mon/Tues) for harmonization and comment resolution as needed Authorize Editor to create D10 and request SB recirculation #4 Request WG Chair to request EC Conditional Approval Describe “flip” vote process: http://dot16.org/ballot/sb_16m Discuss WorkPlan and schedule 2010-11-08 IEEE 802.16m-10/0033r1
802.16m Opening Report- Dallas Plan for the week (cont): Logistics: Conduct two primary parallel sessions all week (PHY & MAC): http://dot16.org/cal/week.php?getdate=20101108 Two parallel daytime SB comment resolution sessions Common sessions on Monday PM (4:00- 6:00 PM) & Thursday PM (1:00PM-5:00PM) Scheduled evening sessions (Mon/Tues) for harmonization and comment resolution as needed). Details to be covered in TGm opening session Also see TGm Draft Agenda, 802.16m-10/0034 Any updates to room allocations and individual room detailed activity during the week will be posted to the 802.16 Reflector and Temp upload directory 2010-11-08 IEEE 802.16m-10/0033r1