New Central Fire Station

Slides:



Advertisements
Similar presentations
Gateway to a Modern Logistics Hub State of the Art CFS facility To re-define logistics solutions… German Express Shipping Agencys.
Advertisements

Architecture CAD living sleeping service SPACE PLANNING
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Water & Wastewater Construction Water Storage Tank, No. Andover, MA Back Forward.
SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT.
Drinking Water on Statia No Permanent Sweet Water Sources: Collecting and Storing Rain water Wells (Brackish)
Fire Precautionary Arrangements Presented by Mick Leadbetter Fire Safety Adviser.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
KINESIOLOGY/ ATHLETICS COMPLEX PALOMAR COLLEGE. Process.
Chapter 6 Fire Department Resources. Introduction Facilities described in this chapter are not available at every fire department due to need and budget.
Pulivendula 1.  construction area of 1.32 Lakhs Sq.ft comprising Laboratory Animal House, Community center, Shopping Complex, Primary School, Auditorium,
Protecting Your School Assets Through Loss Control.
2 Homestead Planning. Planning Factors 1.Water Supply 2.Services 3.Fire Prevention 4.Security 5.Space.
 CONDUCTED PUBLIC MEETINGS TO INFORM THE BUSINESS COMMUNITY.  DEVELOPED PARTNERSHIPS WITH STAKEHOLDERS.  SOLICITED COMMENTS IN DEVELOPING PROCEDURES.
FLAMMABLE AND COMBUSTIBLE LIQUIDS
Fresno County Fire Protection District. Fire Sprinklers Systems Residential – 13D October 30, 2007.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Active Solar Heating - Liquid Systems - Aaron Ma.
Housing Location 50 Lessons Over Easy 1. When looking for a home, one important thing to remember is location, location, location!!! The neighborhood.
WOW Word Problems Week11 Get ready for WOW Word Problem.
Equations with the Variable on Both Sides
Wal-Mart Superstore in San Angelo Texas. Wal-Mart Threat Assessment Vandelism Theft of merchandise Theft of store supplies Illegal entry into facility.
Design Charrette - B Damar Mercado-Hastings Chaeyoung Kim Maxwell Hines Isabel Freedman Johari Rhett.
© 2009 Bentley Systems, Incorporated 1 | 1. Ease of use EPANETWaterCADWaterGEMS Model Layout / Data Entry Graphs Tabular Reports Profiles.
Haramain High Speed Train.
David M. Maroney, AIA/NCARB. 2 BuildingAddition RoadCourse.
L11: Combustion Learning Objectives:
Atlas House Business Center BELGRADE SERBIA Each office is independently owned and operated.
Tanker Operations In Water Supply Michael Crawford July 2002.
The Globe Theater By: Katie Smith, Abigail Hagan, and Casey Stalker.
Working Group 3 Murmansk. SC structure – Assessment context has to be more elaborate and detailed – Optimization. Provide justification based on the document.
Weather Emergency Room Classroom #1 Classroom #2 Classroom #3 Classroom #4 Classroom #5 Classroom #6 Classroom #7 Classroom #8 Fire / Emergency Evacuation.
Facilities for a Quality Child Development Program Child Services II.
Setting Your Classroom Lyn Steed University Of West Georgia.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Setting Your Classroom Lyn Steed University Of West Georgia.
Innovation Centre - Memphis 62k sq. foot state of the art facility – includes: 132 seat Auditorium Main Lab with 11 surgical stations 2 Private Labs with.
By Amy Hansen. Stage Seating Stage Dressing Room Prop Room Area for relaxing and last minute practicing.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Barbados and Preparation for Extreme Events W. Austin Greaves.
Juru Primary School. These children are from Juru Primary School in Rwanda.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Hayward Fire Department and Chabot College Fire Training Facility
An overview of School health and safety AT THE DESIGN STAGE
April 2016 Bond / Facilities Update Presentation
Water Booster Station Improvement Study
Dangers of Fire Asphyxiation Heat Smoke CERT Basic Training
Safety and Prevention of Typical Fire Plan
2013Q1.
(843) | Agent Open House Thursday, September 1st from 11:30-1:30 Light Lunch Catered by Hamby's 10 Fort Royal.
Learning Objective 8 Summarize guidelines for riding safely on the apparatus.
Self-expanding foam system
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
College Park Elementary School & Turnbull Learning Center
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Danbury Elementary School
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Private Fire Hydrant. Fire hydrant systems (also known as fire pumps, hydrant boosters, fire water pumps) are high pressure water pumps designed to increase.
Town of Newbury Proposed New Fire Station
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
Module 8: Storage and Pre-planning Considerations
ريكاوري (بازگشت به حالت اوليه)
WATER SUPPLY FOR NON-HYDRANT AREAS
Recent Bond Accomplishments
Key ‘Juice’ for the APDC
CERT Basic Training Hazards
Presentation transcript:

New Central Fire Station

New Central Fire Station

New Central Fire Station

New Central Fire Station

Proposed Training Facility Layout Training building to incorporate maze, burn rooms, chimney fires, storage Large enough work area for apparatus Designated training prop area Underground water storage for fire scenarios with Yard Hydrants Out door classroom Med Flight Landing Zone Yard Hydrants Training Props Roofed Seating 10 – 20K gallon underground water tank Fenced in area to store cars for training Training Building Med Flight Landing Zone with marker lights Proposed Training Facility Layout

New Training Center