Project GabE ECE 135 – Spring 2005 Week 9

Slides:



Advertisements
Similar presentations
Here’s a partial schematic we’ll use to illustrate the advantage of a ground plane. The idea is that an output pin on the microprocessor is driving an.
Advertisements

System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 11/7/05.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
IT 210 Week 2 Individual Application-Level Requirements To purchase this material link
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
10 Gbps Transimpedance Amplifier and Laser Driver in 0.18 um CMOS
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Heater board troubleshooting
Introduction to the OP AMP
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
1394b Design for Gigabit Optoelectronic Data Communication
Introduction to the OP AMP
Receiver Circuit Testing
Receiver Circuit Testing
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
ECE 135 – The Three Presentation 9
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Project GabE ECE 135 – Spring 2005 Week 9 Rahmin Sarabi Omar Al-Jadda Patrick Crosby Adam Durity

Gantt Chart

Progress Report Posted completed Midterm report to website Tested two Tx’s Tested and verified functioning Rx

Tx Testing First test yielded non-working circuit Laser driver not powered PROBLEM: ground pins from power supply not grounded on board SOLUTION: soldered a connection to ground plane FRONT BACK

Tx Testing Laser Driver now powered successfully Signal trace performed to VCSEL INPUT OUTPUT from Laser Driver

Tx Testing We will set to meet modulation current requirements MODSET potentiometer closes and opens eye We will set to meet modulation current requirements Tx output - high resistance Tx output - low resistance

Tx Testing VCSEL did not lase on both boards Connected to pattern generator’s optical receiver Rx LOS indicator came on - VCSEL off Dr. Brooke’s approach to determine appropriate POT settings

Rx Testing Tested with input from pattern generator Very good eye pattern

Upcoming Week Revise design and schematic for second board run Address lasing failure Build second Rx Revise design and schematic for second board run Order second board