Service test.

Slides:



Advertisements
Similar presentations
Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Advertisements

RaceBot can do car race using two DC motors. Let's learn how to go forward, backward, right turn, and left turn. with practicing ' ㄱ ' shape racing, and.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Appendix 4c. 5-day HYSPLIT Back Trajectories Each page has a map for each of four evenly spaced hours (0, 6, 12, and 18 CST) during a single 24-hour particle.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
Register Digital Multimeter Usage Click Register to begin the course.
Register Digital Multimeter Usage Click Register to begin the course.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Word By Mrs. Yollis Chaparral Elementary. is a computer program that allows you to create written documents.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Log Book Part 1. This is the logbook which you will use to plan and record your progress. You should ensure that you record logbook items as soon as you.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Low-Q IP-BPM Schedule Siwon Jang KNU. IP-BPM Schedule IP BPM schedule –Reference cavity (middle of October) Frequency tuning parts –Electronics (middle.
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
2007/7/111 Pair Monitor studies K.Ito (Tohoku University) 2007/7/11.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
SVD IR mechanics status S.Tanaka SVD mechanics session.
KEK status report S.Tanaka(KEK) 13 th DEPFET workshop 2013/06.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
The reading is 7.38 mm. The reading is 7.72 mm.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
3/9/20131BEAST KEK CAD style figures needed For NIM paper: 1.Dcube-micro sideview (Marc) 1. for BEAST.
M. Woodley ATF Studies Meeting (April 30, 2008) 1 QM7R Vertical Bump Study March 14, 2008.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
The interaction region and BEAST II
CLIC Handling Engineering Update
Integration and Services RE3/1 and RE4/1
S. Tanaka (PXD mechanics session)
Discussion items SVD mechanics session.
HF Test station at P5 A.Mestvirishvili.
YE2 – YE3 distance Manual measurements
KEK IR status Shuji Tanaka KEK DEPFET workshop 2011/2/7-9 1.
Very preliminary draft
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Assembly procedure – Inner Region
Structure and etc Shoji Uno (KEK) at B2GM
Integration issues at IHEP
Update on Junction Box Design
Colors.
BEAUTY AND THE BEAST МАРТ 2010 г..
Services mock-up Full-scale mock-up of one half end-cap.
Summary of the checking items of the Module-C design
1. New Assembly 2. If Top Plate is on the list, double-click on it.
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Authors: W. Chung et al, ITER Korea Highlights
Learning Objective Solving equations with single brackets
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Presentation transcript:

Service test

VXD services (between VXD and QCS) Cooling pipe and BPM cable should be green hatch area. Red area is movable, then such component should not be located 7mm clearance is agreed between VXD and RVC The design work should be finished before Sep. Service test is scheduled in Sep. at MPI.

Service work around Docks VXD and BEAST dock location have already defined. Next step is to check feasibility of cabling work (it will be tested in Sep.) Need to verify cable space Brackets design and production

Check and discussion points Clearance check between RVC and VXD service (7mm) Clearance check between QCS and CDC How to fix each service? What kind of brackets are good to use? And more