CICA Lift of the Year ≤20 tonne load Entry Template

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

5. Shut Down Job and Clean Up 4. Perform Task 3. Prepare Site and Equipment 2. Select and Inspect Equipment 1. Plan Work QUIT EASY GUIDES AUSTRALIA PTY.
Please read this before using presentation
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH F-23.
BEST PRACTICE OPERATION OF HEAVY EQUIPMENT BEST PRACTICE TRAINING METHODS TO ACHIEVE SAFE OPERATION.
Crane Modeling using Excel Please make sure your computer can play sounds. You should currently hear a sound instructing you what to do next.
Crane and Hoist Training
Chandima Perera Jeremy Brown Xiangyu Sun Brianne Luff.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
Proposed MITHI Concept Paper
Crane Operator Training and Certification
Secure disposal and recycling Service and competitive pricing Service.
Civil Contractors Federation ‘2012 Earth Awards’ Submission Template CATEGORY 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
4/22/2017 4:34 AM IHS Goldfire Innovative Product Development Assessment Service Sales Training April 2013.
TDAW103A Practical Training Balance Mark Christie workplace project Cluster workplace project Use training packages.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
PGMS Award Instructions Thank you for your interest in PGMS. Please follow this PowerPoint closely to submit your PGMS Award application. Start here: –
Ecosystem Specialist Project Details. Your Challenge  You are an environmental biologist. Your task is to research one type of ecosystem found in the.
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
State Tech Training Spring Stage Rigging Rigging involves moving loads over the heads of the general public. Like any other system of moving equipment,
Understanding SharePoint Content Module 1. Overview  Defining Content in SharePoint  Defining Management of SharePoint Content.
CONTRACT * ___________ Office/Corporate – 14,999 sf and under ___________ Office/Corporate – 15,000 to 34,999 SF ___________ Office/Corporate – 35,000.
Environmental Issue Presentation Anything (man made or natural) that causes an undesirable change in the physical, chemical, or biological environment.
MNM Fatal Machinery Accident Machinery Accident February 19, 2009 (Puerto Rico) February 19, 2009 (Puerto Rico) Crushed Stone Operation Crushed.
FREE FALL SOLUTION FOR CRAWLER CRANE. Comer Industries is currently supplying swing drives, travel drives and all types of hoist drives (boom, main, whip,
RESIDENTIAL: ________________________________________________________________________________ Category: Please select the category that best describes.
Safe use of remote controls. Points of note Short video.
Safety Management System
PowerPoint Animated Template For technology, originality presentation.
This slide does not count towards the 28 slide maximum. Delete this slide before entering submission. PGMS Award Instructions PowerPoint must include 28.
CATEGORY: (Insert Category Here) Entry Number: (Insert)
Accidents Case Studies
Overview of ASME P Planning for Load Handling Activities
TOWER CRANES. TOPICS INTRODUCTION INTRODUCTION TYPES OF CRANES TYPES OF CRANES DIFFERENT COMPONENTS OF CRANE DIFFERENT COMPONENTS OF CRANE ERECTION PROCEDURE.
Dangers Posed by Vehicle Loading Cranes Demonstrate the Need for Proper Crane Training.
E.g. Bhurj Khalifa Tower Hotel, Abu Dhabi
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Offsite Manufacture.
Integration & Commissioning
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
BACK SOLUTION:
DID YOU KNOW ANY LIFTING OR HOISTING TASK CAN HAVE SERIOUS CONSEQUENCES. Use only inspected and certified equipment for lifting and hoisting. Never stand.
Employee engagement The Best Contact Center Indonesia 2018.
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
Lifting Operations on Construction Sites
Click anywhere to get started…
Presenter Tony Bosnich 2015
For more information, please see our methodology at: 
T-1280 VEHICLE LOADING CRANE
PULSE PROTOCOL – P2 Capacity and organization GROUP NUMBER:
Using the Rated Load Chart
BARNHART THLG member since 2013
Click anywhere to get started…
Checkpoint Reading DMAC code:
People development The Best Contact Center Indonesia 2018.
The Best Contact Center Indonesia 2019
POWER CHALLENGES Several Ways To Solve 7 CHALLENGES.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Entry Guideline Template
Statistical Analysis of Power System Faults
AIA Florida/Caribbean Magazine Project Submission Template
Cranes and Hoists Standard 29 CFR Part
Click to start.. Click to start. Rigging for a safe lift SAFETY TALKS! for PowerPoint © MMIV Bongarde Holdings Inc.
CICA Project of the Year Entry Template
Better regulation through function based rules

Contact center INNOVATION

Presentation transcript:

CICA Lift of the Year ≤20 tonne load Entry Template

Method Used --- 2 Points Location Client

Method Used --- 8 Points Description of the lift (detailed overview of the project, please also provide videos or photos if available)

Planning and Control --- 7 points Resources Crane used, rigging gear, other lifting equipment (Weight and capacity of rigging used, safety factors used, crane load charts, lifting radius of crane(s) during the lift(s)…)

Planning and Control --- 3 points Methodology and sequences of operation

Site and Lifting Conditions---10 points Environmental factors (site restraints, challenges, solutions) or Physical difficulties and/or Location logistics (challenges, solutions) Climatic and ground condition (challenges, solutions)

Risk control --- 10 points How were the risks controlled? How do you reduce your risk?