CICA Lift of the Year ≤20 tonne load Entry Template
Method Used --- 2 Points Location Client
Method Used --- 8 Points Description of the lift (detailed overview of the project, please also provide videos or photos if available)
Planning and Control --- 7 points Resources Crane used, rigging gear, other lifting equipment (Weight and capacity of rigging used, safety factors used, crane load charts, lifting radius of crane(s) during the lift(s)…)
Planning and Control --- 3 points Methodology and sequences of operation
Site and Lifting Conditions---10 points Environmental factors (site restraints, challenges, solutions) or Physical difficulties and/or Location logistics (challenges, solutions) Climatic and ground condition (challenges, solutions)
Risk control --- 10 points How were the risks controlled? How do you reduce your risk?