ARGENTINA ENERGY INVESTMENT OPPORTUNITY

Slides:



Advertisements
Similar presentations
Community Life Choices Procurement Process Paul Large, Category Manager – Social Care Adults.
Advertisements

Public Private Partnership Investment and Construction Armando R. Araujo Cairo 2003.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Generation Business Line
 Quiz #3 Oct. 27th  Writing Assignment Due Oct. 27 th  Homework 7 due Nov. 3rd  Exam #3 Thursday Nov. 3rd.
Circular A-110 Everything You Didn’t Want to Know.
DEVELOPMENT OF THE OIL AND GAS INDUSTRY: THE AUSTRALIAN GOVERNMENT PERSPECTIVE Thomas Bernecker Australian Government, Department of Industry, Geoscience.
Cuba’s Energy Situation: Supply Perspective Chip Groat Interim Dean Jackson School of Geosciences The University of Texas at Austin.
Supply Chain Workshop Islamabad 24th – 28th June 2013
Structured Transaction Overview. FDIC serves as an equity partner in its Receivership capacity for a single or multiple institution transaction. Joint.
Part 1.3 Mineral Rights & Leasing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
T HE N EW M EXICAN U PSTREAM L EGAL R EGIME A CHANGE OF PARADIGM TOWARDS PRIVATE VENTURE.
W. Robert Patterson & Associates PV SOLAR PROJECT DEVELOPMENTS For the Plymouth Public Schools Bob Patterson November 22, 2010.
United Nations Procurement Division
Oil and Gas Prospects in Lebanon 1 st Licensing Round: Strategy & Program Arab Economic Forum 9-10 May 2013 Assem Abou Ibrahim – President & Head of QHSE.
Contractual Status of EC4MACS Hans Benzinger International Institute for Applied Systems Analysis (IIASA)
Energy for the Future Belene Nuclear Power Plant Project Status.
BID OPENER 1 LOGS IN Dept user/Evaluator Logs in.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
© 2015 Haynes and Boone, LLP Standard cover slide Mexico Energy Reform “Let the Bidding Begin” - Round 0, Round 1 and Beyond: Analyzing the Bidding and.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
2016/17 Grants Programme Supplier Briefing
AAPG International Conference & Exhibition
Luthin Associates Overview
For hydrocarbons 1.
OVERVIEW OF TANZANIA HYDROCARBON POTENTIAL & EXPLORATION STATUS
Tender Evaluation and Award Process
“Hydrocarbons Exploration Activities Offshore Cyprus”
Next Step & Time plan Marcello Losasso, CERN
Regional Connectivity Scheme Ministry of Civil Aviation
ACCOMPLISHMENT REPORT AS OF NOV. 30, 2013
Trinidad and Tobago Deep Atlantic Exploration
M&E Task Force Meeting
PRESENTATION TO THE AAPG
ADJUSTING THE ACCOUNTS
TECHNICAL BID OPENING.
HIGHLIGHTS OF UPSTREAM GOI POLICIES
Around the World in 50 Minutes: The MENA Region
Highlights of the Offers
9/18/2018 Bids CONTRACTING Khamis…..
Project Nexus Workgroup AQ Correction Process Timeline
Rogers Auctions Supplier Login Process
This Presentation Pack is brought to you by
North Carolina Piedmont Region Consortium Timeline
Step 3 Step 2 Step 1 Put your text here Put your text here
Update on Exit Capacity Substitution and Revision
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
ARGENTINA ENERGY INVESTMENT OPPORTUNITY
Modification 501 slides for Workgroup
Ministry of Civil Aviation
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
United Nations Procurement Division
Gas Customer Forum DN Interruption Update - Introduction
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
PRISMA General Information
Timeline 2019 ( ) Jan Feb Mar Apr May Jun Jul Aug
BUSINESS PLAN COMPETITION
ARGENTINA ENERGY INVESTMENT OPPORTUNITY
30th November 2007 Beverley Grubb SGN
Invitation To Bid Accommodation and Conference Services for RBM Partnership’s Regional Meeting in Abuja, Nigeria October 2019.
Presentation transcript:

ARGENTINA ENERGY INVESTMENT OPPORTUNITY Offshore Round 1 November, 2018 Site of the Round: Click Here

Opportunity Description Offshore Project Description Opportunity Description Through an International Public Bid (Resolution 65/2018), the Energy Secretariat invites interested companies to award exploration permits in order to search hydrocarbons in offshore areas (located after 12 nautical miles). The general goal of this Round is to increase awareness of Argentine Offshore opportunities through real investments in Exploration, carried out by companies with the technical and financial capacity to fulfill the objectives of the Round. 38 blocks included in Round 1 (225.000 km2): West Malvinas Basin: 18 Deepwater blocks (90.000 km2) North Argentina Basin: 14 Deepwater blocks (130.000 km2) Austral Basin: 6 Shallow water blocks (5.000 km2) Royalties linked to success: Starting at 5% to 12% based on: R factor = (ƩSales- ƩRoyalties)/(ƩE&A+ƩInvestments+ƩOPEX) Bidding Timeline 2018 Nov 06th 2019 Feb 14th Mar 14th Apr 15th Jul 30th Terms of Reference Publication Deadline for Comments Reception Receipt & Analysis of Bids Award Date Estimated Date for Blocks Transfer Agreement

Main Terms & Conditions Technical & Economic Requirements Companies that do not meet the established requirements must present a technical and / or economic guarantee of their controlling companies that meet the stated qualification requirements (depending on the case). Long Duration Exploration Permit: Three periods (4+4+5 years) for all blocks (except shallow waters: 4+3+4). Obligation to drill one well in 2nd Period and on Extension Period. The bidder must present a bid maintenance guarantee of 100.000 USD for each of the areas offered. The sealed envelope must contain the corresponding offer submission form, where the following information will be consigned: A) The working units that the bidder undertakes to carry out during the first exploration period. B) If applicable, the entry bonus. Bid (usd) = WU x 5000 (usd/WU) + Bonus* (usd) WU : Working Units offered for 1st Exploration Period. Must be higher than or equal to Minimum Working Units *Bonus is accepted only if WU > Basic WU; to be paid 50% upfront + 50% end of 3rd year exchangeable for WU done in the first 3 years in addition to Offered WUs