Next New exploration of an old idea

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Develop an Information Strategy Plan
Your Power Company has shown to be good at some things: Growing Monthly Bills.
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
High-voltage plasma torch for pulverized coal burner NIT, LLC Tatyana Zykova, CEO.
Noble Gas Engine Next New exploration of an old idea Clean Energy Inc.
Liquid-Phase Methanol Process (LPMeOH) Jill DeTroye, Brandon Hurn, Kyle Ludwig, and Isaac Zaydens.
1 Computer Systems & Architecture Lesson 1 1. The Architecture Business Cycle.
LITHUANIA: MODERNIZATION OF MULTIFAMILY BUILDINGS USING THE JESSICA FINANCIAL INSTRUMENT ARŪNAS REMIGIJUS ZABULĖNAS VICE-MINISTER OF ENVIRONMENT, LITHUANIA.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Air Cars Christie Walker. Outline What an air car is Who invented them How they work Recharging compressed air Advantages / disadvantages Models available.
Compressed Air Car bewyn. Introduction  It is hard to believe that compressed air can be used to drive vehicles. However that is true, and the “air car”,
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Expected Payback Period as a key factor shaping future energy mix Robert Uberman Expert in natural resources strategy, finance and R&D.
COM333 – IKBS3 Managing Portfolio. Key questions on the application portfolio STRATEGIC Why – do we want to do it in strategic terms? What – does the.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
WELCOME.
California Off-road Mobile Source Technology Review JOHN DEERE LE ENGINE TECHNOLOGY John Deere Consumer Products February 2, 2000.
Chapter 11: Alternative Approach - Purchasing Systems.
Alternatives Drying Class A Processing Dewatering Centrifuge, BFP Thickened Liquid Sludge Class A Land Application Incineration Pelletization Alkaline.
Gulay Litchfield For CQI-TECH PLC
IND137 Team Concepts & Problem Solving Scenario Introduction.
Teaching slides Chapter 3
The Role of New Markets Advisors in Healthcare Case Study in Medical Devices.
What is What will be UNDER THE HOOD and IN THE TANK ? By John Zavalney.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Portfolio Committee on Human Settlements 08 March 2016 Review Of Community Residential Units Programme (CRU) Mr. M. Tshangana.
Saving with renewable energy Presentation to North East Bioresources and Renewables January 2014.
Energy in the World.
Gas Turbine Power Plant
Skolkovo PRESENTATION
NS4960 Spring Term 2017 Korea: Energy Policy
Continuous Improvement Project (A Guideline For Sponsors)
Self-Generation Incentive Program (SGIP)
CURRENT STATUS AND ISSUES OF THE KOREAN EMISSION TRADING SCHEME
IAEA PERSPECTIVE ON THE FUTURE OF NUCLEAR POWER
Resource Cost Working Group
Presentation On Liquid Nitrogen as a Non-Polluting Fuel
Half-term H.Wk Research a power station of your choice and produce a fact file on its operation. Your fact file might include: The type and amount of fuel.
Recommendations for Finalizing RGGI Model Rule
Gas Power Plant - Layout and Operation
H2-O2 FUEL CELL By Mrs. Anuja Kamthe.
Multidisciplinary nature of environmental studies Lecture #1
BMW’s Hydrogen Powered Vehicles
SMA ENVIRONMENTAL FORUM 2018
Dell / FIRST® in Texas “Leaving Your Legacy” Business Plan Challenge
Chapter 2 The Process of Design.
Sequential Phase II Awards at the Department of Energy
The Evolution of Building Methods Traditional Methods
BRIEFING TO THE PORTFOLIO COMMITTEE ON ENERGY ON THE IMPACT OF 2016 SONA 23 FEBRUARY 2016 Minister Tina Joemat-Pettersson.
NS4960 Spring Term 2018 Korea: Energy Policy
Scientific Inquiry Standard B – 1.7.
Natural Gas Grade 8.
Bee the hive Presented by the University of Glasgow:
Factors Influencing Cost of Production
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
AIR Quality Control Concepts
HVAC consulting companies can improve your Building Essentials with HVAC Design & Build Solutions.
ENERGY.
BIOGAS PLANT.
Natural Gas Innovation Fund Investment Intake Template
EVP Design Presentation
Mayors’ Commission on Climate Change
Mayors’ Commission on Climate Change
Scientific Inquiry Standards B – 1.7 and B – 1.8.
Presentation transcript:

Next New exploration of an old idea Noble Gas Engine Clean Energy Inc.

Next New exploration of an old idea Introduction to Noble Gas Engine During 1960-1980’s, an inventor developed and patented an engine which ran for extended periods on miniscule quantities of Noble Gases. The principle of the engine is basic and simple: A hermetic telescoping gas chamber is filled with inert gases.   These gases are subjected to controlled electronic pulses and radiation effects to create a powerful expansion as yet not understood.  Removal or reversal of the pulses causes a contraction leaving the gases ready to cycle again.   Advantage: The engine in operation used no air, produced neither waste heat nor exhaust. “Refueling” of Noble Gases is required after 1000 operation hours. The patents have since expired. The technology has been developed and demonstrated, but is almost forgotten. The proposal parties maintain major part of the technology, documentation and experience.

Next New exploration of an old idea History Video Click on Video to Play

Next New exploration of an old idea Noble Gas Leyland engine Horizontal 2 piston engine Vertical 2 piston engine Gas mixture lab Vertical 2 piston engine under test

Next New exploration of an old idea Proposal We are able, and propose to revive the technology to a complete working stage. The core team will include: Mr. Frank Andres – Lead Scientific Adviser Mr. Bob Rohner - mechanical designer and builder of the original engines. Mr. Tom Rohner - Electrical designer and builder of the original engines. Assistance from specialists in various fields

Next New exploration of an old idea Status The Noble Gas Mixture technology was revived and tested by Rohner brothers. Most of original inventor’s documentation and engines are available to the parties The Engine mechanics is fully studied by the participants. The Electrical/Electronic/Magnetic function is under initial study. Modern Technology and Physics has reached a new level of interest and comprehension. Click on Video to Play

Next New exploration of an old idea Objectives Our objective is to bring a viable, pollution-free, very low-cost engine to the market, based upon the “Noble Gas” technology. The final product will be an engine, elegantly simple and built of conventional materials, that would run emission free, for thousand hours on a few liters of Noble Gases . Assemble a team (part of who where involved on the original development 27 years ago) in the areas of mechanics, electric, magnetic and other talents in order to revive the technology and introduce the approved product.

Next New exploration of an old idea Market Value None of the currently available alternatives to oil, gas and coal offer a complete solution to the over-arching worldwide need to replace fossil fuels. The mobile energy market is shifting dramatically in the direction of hybrid fuel/electric. Demand is exceeding supply now, and will accelerate. The “Noble Gas” engine technology provides a total solution, addressing the need in both the stationary and mobile energy marketplaces. Once the technology has proven itself viable, it could easily replace at least 20% of the existing energy generation technologies in short order. Eventually, it is likely to dominate those marketplaces.

Next New exploration of an old idea Approach In order to approach the high intentions with minimal risks, the following five stages are proposed

Next New exploration of an old idea Stage 0 – Establish a company Establish the share relations of the parties. Ensure required investment funds for all the stages. Based on the above - establish an Systems subsidiary / company for Noble Gas Engine,.

Next New exploration of an old idea Stage I – Technology Bricks Revival – 6-10 months maximum Brain Storm meetings in order to: Study known information. Resolve uncertain questions from the available information. Establish a scheme for commercial fuel mixture. Study and Establish a scheme for the Electric/Electronic/Magnetic system of the engine. Refurbish the original inventor engine, Revive the Noble Gas mixture and perform initial tests. STATUS: At the end of stage I, main technology bricks revived

Next New exploration of an old idea Stage II - Building 1st prototype Engine and tests – 9-12 months max. Prepare Noble Gas Mixer and testing bench. Design and Construct 1st stand alone prototype engine. Perform tests and implement tests results and improvements. Prepare tests report with results and recommendations. STATUS: At the end of stage II, complete technology is approved

Next New exploration of an old idea Stage III – Building and testing a prototype engine – 12-16 months max. At this stage, a presentation prototype engine will be built and tested. Allocate a relevant basic engine for transformation to Noble Gas engine. Design the changes required in the engine. Monitor the changes manufacturing process. Construct the engines. Perform engine tests and modify as required. Prepare test reports with results and recommendations. STATUS: At the end of stage III, Complete Engine technology is approved

Next New exploration of an old idea Stage IV – Marketing – 10-14 months Build marketing strategies options Evaluate the options and decide about the preferred marketing strategy Follow the selected strategy for marketing Complete marketing activities Follow up STATUS: At the end of stage IV, marketing contracts signed

Next New exploration of an old idea Schedule: Total – 27-38 months of development, 10-14 month of marketing Stage I – 6-10 months. Stage II – 9-12 months, Stage III – 12-16 months, Stage IV – 10-14 months.

Next New exploration of an old idea Required investment funds Stage I – 6-10 months, 1,600,000 to 2,000,000 US$ Stage II – 9-12 moths, 2,300,000 to 2,700,000 US$ Stage III – 12-16 months, 3,150,000 to 3,700,000 US$ ---------------------------------------- Total Development Investment 7.050,000 to 8,400,000 US$ Stage IV – 10-14 months, 1,700,000 to 1,800,000 US$ Total investment: 8,750,000 to 10,200,000 US$