Initial Negotiation for WUR

Slides:



Advertisements
Similar presentations
Amendment Proposal for TV White Spaces Operation
Advertisements

19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Overall MAC Procedure for WUR
WUR Negotiation and Acknowledgement Procedure Follow up
WUR Negotiation and Acknowledgement Procedure Follow up
High Level MAC Concept for WUR
Considerations on WUR Design
Duty cycle mode STA’s PS follow-up
Duty cycle mode STA’s PS follow-up
Spec text clarification for FDMA
Response frame in WUR Mode Setup
WUR Acknowledgement Indication
Overview of ba Power Management in D0.4
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Further considerations on WUR frame format
Channel Access for WUR FDMA
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Synchronization with Low Power Antenna
Overview of ba Power Management in D0.4
Overview of ba Power Management in D0.4
Synchronization with Low Power Antenna
WUR Action Frame Format Follow up
WUR MAC Consideration Date: Authors: Nov 2016 Liwen Chu
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Duty cycle mode STA’s PS follow-up
Response frame in WUR Mode Setup
Wake Up Response mode to WUR frame
WUR Action Frame Format Follow up
Overview of ba Power Management in D0.4
Power saving operation for WUR STAs in duty cycle mode
Response frame in WUR Mode Setup
WUR Action Frame Format
Communicating Wake-up Operating Parameters
AP re-discovery by WUR STA
WUR Acknowledgement Indication
WUR Mode Operation Procedures
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Power saving operation for WUR STAs in duty cycle mode
Spec text clarification for FDMA
BSS parameters update notification
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
AP Discovery using WUR Date: 08/11/2016 Authors: November 2016 Name
Communicating Wake-up Operating Parameters
Duty cycle mode STA’s PS follow-up
TD Control field with Response indication in WUR frame
WUR Negotiation and Acknowledgement Procedure Follow up
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
WUR Action Frame Format
Response frame in WUR Mode Setup
Overview of ba Power Management in D0.4
Power saving operation for WUR STAs in duty cycle mode
Amendment Proposal for TV White Spaces Operation
Spec text clarification for FDMA
Channel Access for WUR FDMA
Power Efficiency for Individually Addressed Frames Reception
WUR Mode Operation Procedures
WUR Negotiation and Acknowledgement Procedure Follow up
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Power save state transition
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Discussion on Multi-link Setup
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Presentation transcript:

Initial Negotiation for WUR November 2011 doc.: IEEE 802.11-14/1342r1 January 2017 Initial Negotiation for WUR Date: 16/01/2017 Authors: Name Affiliations Address Phone Email Igor Kim ETRI Korea +82-42-860-5525 ikim@etri.re.kr Sunghyun Hwang +82-42-860-1133 shwang@etri.re.kr Seungkeun Park +82-42-860-5993 seungkp@etri.re.kr Igor Kim, ETRI

Introduction Problem statement January 2017 Introduction Problem statement AP and STA have to notify each other about their WUR capability AP and STA have to negotiate WUR parameters of their WU association This contribution describes the initial negotiation procedures for WUR Igor Kim, ETRI

General Flow of Initial Attachment to AP January 2017 General Flow of Initial Attachment to AP WUR capability can be notified at scanning phase using Beacons (passive scanning) Probe request/response (active scanning) Such notification from AP may facilitate AP selection process for STA Igor Kim, ETRI

Capability Exchange at Association Phase January 2017 Capability Exchange at Association Phase WUR capability may also be exchanged during association phase through Association Request/Response Both STA and AP can notify each other that WU association is possible Knowing STA is WUR capable may help AP to decide whether accept the STA’s request Igor Kim, ETRI

Example of Capability Information January 2017 Example of Capability Information Supported bands Information of the supported frequency bands for WUR operation (in-band, out-of-band, 2.4 GHz, 5GHz, etc.) WUR ACK Specifies if ACK protocol is supported by WUR signaling Duty-cycled WUR Specifies if duty-cycled WUR operation is supported QoS mode Specifies if EDCA is supported for WU frames and corresponding ACK frames Etc. Igor Kim, ETRI

Example of WUR Supported Channels Information January 2017 Example of WUR Supported Channels Information AP may include supported channel information for WUR For instance, channel information can be represented as a tuple: 20MHz channel number, WUR channel number, number of WUR channels, etc. Igor Kim, ETRI

WUR Association Establishment January 2017 WUR Association Establishment WUR association parameters exchange can be performed using simple 2-way handshake Could be STA-initiated or AP-initiated The request may include recommended parameters for the WUR association The response carries the decision with the appropriate status and possibly adjusted parameters The WUR association teardown can be performed through the simple notification with Reason code Possibly new Action frame have to be defined for this purpose Igor Kim, ETRI

Example of WUR Parameter Set January 2017 Example of WUR Parameter Set Operating channel Channel to be used for WU frame transmission WUR mode Duty-cycled mode, continuous mode, etc. Duty-cycle parameters If duty-cycled mode is used then negotiation of parameters is needed (e.g. on/off duration intervals, duty-cycle period) WUR ACK policy WUR ACK policy used for the given association (No ACK, Immediate ACK, Delayed ACK, etc.) Wake-up delay Approximate transition time from OFF to ON state Can be used for WUR ACK/PS-Poll timeout setting Etc. Igor Kim, ETRI

January 2017 Conclusion STA and AP may exchange WUR capability information during scanning or association phase STA and AP should also have an explicit handshake procedure to establish, teardown or update WUR association and negotiate parameters Igor Kim, ETRI