BC2 / Linac Installation Coordination Kathleen Ratcliffe

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Safety Oversight for SLAC Accelerator Department Operations
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Jose Chan 2007 Downtime PMOG 5/16/ Downtime PMOG Review Jose Chan.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Director’s Progress Review Closeout Meeting
Shielding Design for LCLS Injector Operation – Phase one
CBETA Technical Review
Accelerator Operations Department Readiness (Part 2)
2K CB FDR Overview:  Agenda, Charge, Review Process
Undulator System Installation
Director’s Progress Review Closeout Meeting
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LTU/Undulator Installation Status
Sector 20 Project Overview
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
e-Beams Systems Update
CONVENTIONAL FACILITIES STATUS
Installation of Photon Beam Transport to FEH
Installation Binder / IRR – an example
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Ian Evans SSRL Safety Office
Maximum Credible Beam Event Paul Emma et al
LCLS Undulator System Production Management
2007 Downtime Controls Installation
Shutdown Planning & Installation Schedule
LCLS Personnel Protection System and Beam Containment System
E-Beams Systems Manager
LTU/Undulator Installation Status
CONVENTIONAL FACILITIES
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project October 2006
LCLS Controls and Conventional Facilities
ThomX – Commissioning Meeting – 25/01/2018
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
e-Beams Systems Update
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Powering and Safety day Underground access during powering tests
Presentation transcript:

BC2 / Linac Installation Coordination Kathleen Ratcliffe

BC2 / Linac Installation Coordination Agenda BC2 / Linac Installation Coordination Objectives Overall Schedule Documentation and Release Issues and Concerns Close Out / Action Items

Responsibilities Mike Saleski / Safety Systems Chan / Linac Project Management Ratcliffe / Installation Manager Greg Diaz (MFD) / Field Installation R.F. Boyce / BC2 Area Design and Integration Phil Cutino / L3 Design and Integration / Linac Water Upgrades Karen Chan-Hui and Lori Shewchuk / LCLS CF Ponciano Rodriguez / Cable Installation Bob Fuller / Controls Checkout

Installation Objectives Install, Check out, and Control all components and systems from BC2 thru L3 Beamline components represented by Emma’s current MAD Deck All other that is necessary for safe and reliable commissioning Water, Vacuum, AC Power, Air, Purge Gas, RF Systems Safety Systems Radiation Shielding, BCS, MPS, and PPS

Overall Schedule P3 consistent with AD Downtime Schedule Start Date 9/4/07 End Date 12/3/07 Schedule Considerations: Hardware availability Davis Bacon / Cable Pulling PPS Certification Linac/Damping Rings/E+/CIC/LCLSI/BSY Estimated 11/5/07 thru 11/9/07 day shift and Estimated 11/12/07 thru 11/16/07 day shift Rolling Power Outages General Laboratory Resources

Special Conditions Limited 2 Shift Operations Aggressive Schedule for BC2 area de-installation No allowance for schedule drift Temporary lighting during rolling power outages Equipment needs to move from sector 19 down to sectors 24 thru 29

LCLS AD Downtime Schedule

Cable Installation Planning

BOM

BOM Installation

Documentation Status BC2 Status Design and Integration Engineer – Richard F. Boyce Three designers currently assigned to this area Design is complete Completed PDR on 12/14/07 (committee: P. Emma, G. Bowden, S. DeBarger and E. Doyle) FDR- complete 18 April 2007, BC2 Support Tables Installation 2 May 2007, BC2 Vacuum Chamber Installation 9 May 2007, BC2 Vacuum Supports Installation 23 May 2007, BC2 Magnet and Support Install Drift chambers in fabrication Everson Tesla is fabricating bend magnets Support stands released to fabrication

BC2

Documentation Status BC2 installation drawings

Documentation Status L3 Status Integration Engineers – Phil Cutino and Richard F. Boyce One designer is currently working on BC2 and two designers on L3 design Completed PDR on 12/19/2006 FDR on July 13, 2007 Completed preliminary installation drawings Completed all waveguide designs for Linac and request have been submitted to MFD (except long waveguides which were made in 2006)

Documentation Status Typical installation drawings (sector 25-2)

Product Assurance & Safety Following safety documents are required prior to installation or operation Safety Overview Approval Work authorization approval from LCLS and AD Penetration permits Earthquake approvals Building inspection approvals Electric safety approvals RP approvals Non-ionizing approvals

Safety Overview Committee Approval

Issues and Concerns 2007 Downtime Installation 2007 downtime 10 weeks vs. 2006 downtime 17 weeks Reconfiguring 13 Linac girders vs. 3 in 2006 More waveguides in Linac housing to be installed Longer distance for equipment hatch to areas of installation Davis Bacon Linac installations maybe competing with LTU installations Water work less than 2006 installation Hardware and cable installations co-habitat same area Not much time for control to check out hardware