SWP Dam Safety Program 2018 Summary January 16, 2019

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

Project Quality Plans Gillian Sandilands Director of Quality
Museum Presentation Intermuseum Conservation Association.
Managing Risk: A Framework and Reporting Cycle 2014.
ELIR Workshop 1 Managing the Student Learning Experience.
Department of Environmental Quality Environmental Management System Overview.
A Presentation on the Management and Curriculum Audit for the Guam Public School System April 14, 2009.
Filename GPCA Responsible Care Workshop Process Safety Standard & Practices GPCA Responsible Care Workshop.
Randy Benson Executive Director Rural Healthcare Quality Network.
Providence School Board September 10, 2012 Introductory Briefing Providence Public School District Comprehensive Information Technology Blueprint Center.
Not protectively marked AS/LOB Rev 01 1 Nuclear safety, security and safeguards interfaces in operation: An EDF perspective Andy Spurr, Managing Director,
Reorganization of APHIS Veterinary Services U.S. Department of Agriculture Animal and Plant Health Inspection Service Veterinary Services November 2013.
Unit 16: Outreach and Resources Unit Introduction and Overview Unit objective:  To identify existing outreach programs related to COOP and opportunities.
Federal Transit Administration Office of Safety and Security FTA BUS SAFETY & SECURITY PROGRAM 18 th NATIONAL CONFERENCE ON RURAL PUBLIC AND INTERCITY.
Victorian Managed Insurance Authority APCO Presentation – Risk Management in the VPS Jonathon Masom – Risk Management Adviser.
Rail Safety Committee Mid Year Meeting December 2011
Presented by Dorian S. Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Chicagoland IASA Spring Conference
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Roles and Responsibilities
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
Nuclear Security Culture William Tobey Workshop on Strengthening the Culture of Nuclear Safety and Security, Sao Paulo, Brazil August 25-26, 2014.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
DOE ASSET MANAGEMENT PLAN
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Enterprise Risk Management in the Construction Industry
1 “Good Practices in Managing for Results” Workshop Santiago, Chile October 27 th and 28 th, 2010 Benjamin Nelson Managing Director for Quality Office.
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
Pipeline Safety Management Systems
Implementing SMS in Civil Aviation: the Canadian Perspective
Adult College and Career Education Leadership
MOSH Adoption Team Training
Operational Assessment
Safety in Construction and Upgrade Phases
ITS Strategic Planning Guidelines
Silver Jackets Orientation
OEC Ecosystem Initiative Technical Assistance Branch Efforts
Safety Management in Europe
Overview – Guide to Developing Safety Improvement Plan
Risk Assessment Program
Air Carrier Continuing Analysis and Surveillance System (CASS)
Overview – Guide to Developing Safety Improvement Plan
Environmental Health and Safety (EH&S) Supplier Awareness Training
Following Up on Internal Audit Reports Workshop on IIA Standard 2500
Logistics Solutions for the Warfighter
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Natural Gas is Moving Forward
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
ATS QUALITY ASSURANCE PROGRAMMES
Continuity Guidance Circular Webinar
ApprenticeshipNC Regional Collaboration and Expansion Project
Integrated Delivery Model
Continuity of Operations Planning
Civic Engagement in Minnesota
Academic Program Review Comprehensive Report
Quality and Risk Management at Brazilian Institute of Geography and Statistics: a short report of a work in progress Ana Cristina Martins Bruno, Brazilian.
Mapping local initiatives against the THRIVE Framework’s five needs based groupings
Strategic Planning in Dynamic Times
What Is TCRP? The Transit Cooperative Research Program (TCRP) was established in 1992 to provide an ongoing medium for applied research to transit issues.
MODULE 11: Creating a TSMO Program Plan
The Statewide System of Support The Ten Roundtables: Supporting all school districts September 2009.
Urban Water Institute 24th Annual Conference Oroville Dam
‘Delivering better value from professional services’
Performance based planning and programming
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

SWP Dam Safety Program 2018 Summary January 16, 2019 DRAFT SWP Dam Safety Program 2018 Summary January 16, 2019 Alternate title slide, for longer title

Existing Multi-Layered Approach to Dam Safety DRAFT Existing Multi-Layered Approach to Dam Safety Original Design and Construction Measures Dam Safety Surveillance and Monitoring Plan (DSSMP) Part 12D Safety Inspections / Director’s Safety Review Board Emergency Action Plan & Exercises Routine Maintenance Capital Improvement projects

DRAFT 2017 – 2018 Program Reviews Self Assessment with CEATI Dam Safety Program Maturity Matrix ISO 55001/ASDSO Peer Review Executive Visits to USBR and SoCal Edison Owner’s Dam Safety Program Independent Review Independent Forensic Report

Areas of Enhancement SWP Dam Safety Policy (WREM 16b) DRAFT Areas of Enhancement SWP Dam Safety Policy (WREM 16b) A Top-down leadership structure Training and interaction with dam safety organizations Cross-Divisional Dam Safety Teams SWP Dam Safety Program with the O&M Asset Management Program Culture of Continuous Improvement

DRAFT Time

DRAFT SWP Dam Safety Policy Public safety is the highest priority for the Department and the SWP Assigns responsibilities and accountability Establishes Program Elements Signed by Director on November 2, 2018

SWP Dam Safety Program Elements DRAFT SWP Dam Safety Program Elements Surveillance Independent Reviews Dam Safety Assessments Project Delivery Reservoir Operations Communication Maintenance Documentation Design and Construction Technical Expertise Risk Management Program Reviews Emergency Preparedness

DRAFT 2018 Program Progress Enhanced Executive-level Accountability for SWP dam safety. Elevated the SWP Chief Dam Safety Engineer (CDSE) position. Established the SWP Dam Safety Program Steering Committee Reorganization and Expansion of the O&M Dam Safety Branch Executed Training Contracts with ASCE and ASDSO Enhanced training plans for engineers Worked with CalHR to Improve Recruitment for Key Positions Increased participation with the Dam Safety Industry Increased use of external dam safety and engineering expertise Increased outreach to local agencies on EAPs/emergency preparedness

DRAFT 2018 Spillway Efforts Completed Phase 1 Spillway Inspections and Condition Assessments and Maintenance Actions for: Pyramid Dam Castaic Dam Cedar Springs Dam Grizzly Valley Dam Frenchman Dam Antelope Dam Del Valle Dam

DRAFT 2019 Planned Efforts Oroville Facilities Potential Failure Mode Analysis/Level 2 Risk Assessment Workshops Oroville Dam Safety Comprehensive Needs Assessment (on-going) Phase 1B Spillway Inspections Phase 2 Spillway Invasive Investigations Inundation Mapping, EAP updates, and Exercises (on-going) SWP Dam Safety Program Initiatives Continued alignment of SWP Dam Safety Program with the O&M Asset Management Program Initiatives

DRAFT Questions?