Glen Eira Leisure Removal of Tiles and Painting to Pools

Slides:



Advertisements
Similar presentations
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
Advertisements

Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
Openness and Transparency in Local Governments and Smaller Organizations June 5, 2014.
Services System Design & CAD Drawings Full Installation to British and European Standards Property/Structural Assessments Annual Testing and Maintenance.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
SELF REPORTED INCIDENTS How to Manage Them Effectively Leigh Grindley, RN, NHA Regional Vice President North Region LaVie Management Services.
Presented by: Insert Name Safety Management Consultant
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Staff Induction Occupational Health and Safety Nick Giles OHS Manager.
Hazard Identification
Feedback From Safety Summit Peter Roberts Feedback from Safety Summit UAG Conference July | Energy Networks Association.
Chinook’s Edge School Division No. 73 General Safety Orientation.
Engin Ali ARTAN Industrial Engineering
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
Session 5 Elements of Uganda Model Management Contract for Water.
LinkWater Tender Presentation Kuraby Reservoir Roof Works.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
Sustainable Direction Ltd PM – The STH Way sustainable direction ltd. 6 Twigworth Court Business Centre Twigworth, Gloucester GL2 9PG UK T +44 (0) 1452.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
What you will learn in this session 1.Sources of information about health & safety, including national legislation or guidance and local policies 2.Work.
ADMINISTRATIVE STRUCTURE OF A COMPUTER CENTRE. The administrative structure is being organized in such a way that a skilled professional personnel is.
Safety Committee Formation
Peer Resource Network Occupational Health & Safety Program Requirements Introduce facilitator Updated: 2017.
How Loyal Are Your Customers …after the water park explodes?
The health and safety at work Act - a new way of thinking
Elastomeric Wall Coating: Garland’s Tuff-Coat™ Systems
FINAL STUDY GUIDE 2016.
Alterna Tile Replacement
Office 365 Security Assessment Workshop
coaching & progressive discipline
An oil company in Canada
PUASAR015A Crew small powercraft in a rescue operation.
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Presented by Kevin Williams
Improving your finance function
T-1440 Pre employment Medicals and Injury Management
The Role Of The Citizens’ Oversight Committee
David Lodwick, CIC, CRM Director of Trust Services
Health and Safety is Important
Coaching & Progressive Discipline
Reducing Workplace Injuries
Risk Management Policy & Procedures
City of Richmond, California FY Draft Budget
IT Service Operation - purpose, function and processes
Ulrich’s model of HR.
Civic Center Sports Field Study Session & Quarterly Update
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Woodheys Primary School
ECOLAB & ALCHEMY PARTNERSHIP OVERVIEW
Government of Jharkhand Ease of Doing Business – Labour Reforms
BSBWHS304 Participate effectively in WHS communication and consultation processes.
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Safety Hour Discussion Pack
INCIDENT REPORTING.
COMBINING SERVICE & SAVINGS
Roles and Responsibilities COC & District
Roadmap to COR.
Project Statement To create an efficient internal operating solution for aquatic facilities which enables rosters to be produced and available with direct.
T-1440 Pre employment Medicals and Injury Management
Caisson Repairs IMG Offshore provide a full Caisson Rehabilitation Service. Whatever the problem: Through Wall Perforation Wall loss through Corrosion.
Human Resources Budgeting and Employee Productivity
Event & Disclosure Reporting
Consumer Protection Law: HE Admissions
EAST GIPPSLAND SHIRE COUNCIL
Understanding the Right-of-Way Process
Reliable communications at all times.
To achieve improvement through: Self assessment Benchmarking
Online Volunteer Work Health & Safety Induction
Department of Corrections FY16 Budget Request
Presentation transcript:

Glen Eira Leisure Removal of Tiles and Painting to Pools Presented by: Govind Kartha Director, GK Consultancy Pty Ltd, Mob: 04-0803-6676 , eMail: gkartha@gmail.com

Issues with Pool Tiling Tile Delamination Cracking of Tiles Discolouration of Grout Erosion of Grout Percolation of Water to substrate Aquatic entry $196k – 50m pool closure for 13 weeks Salaries $90k – over time with the role of the Supervisors, additional admin has been required and hours have not be moved between GL codes Utilities $61k – Junes haven’t been processed cleaning $60k – cleaning contract has been managed effectively and periodical cleaning has not been completed within timeframes

Resultant Problems with Failure of Tiling Injuries to Users Loss of Revenue Additional operational expenditure Loss of Memberships Claims WorkSafe inspections & Audit Full/Partial Closing of facility Risks to Reputation Risk of Claims & Compensation Accelerated Progression of Tile Failures Unplanned Maintenance Expenditure Increased Operations Budgetary layout We provide a safe environment for staff to work in and the community to utilise the facilities. For the first 5 years GESAC was the highest score in Victoria for LSV platinum Pool Accreditation with 99.61%. With only losing 2 points on facility design and things that can’t be fixed (slide pool concourse width and acid dosing positioning in the plantroom) Platinum Pool Challenge – 1st place x 2, 2nd place x 1 and 3rd place x 1. Only facility in Victoria that has place since the program has started. Well-developed training for pool lifeguards. Industry recommend 4 sessions a year and we deliver 6- sessions at the centre Well established GESAC procedures and policies to support staff in performing their roles which allows management to feel comfortable which they are not on site. Also allows the Duty Manager confidence that if anything happens whilst they are working, there are processing in place to support their decision making. Full time staff experience and knowledge

Way forward – Solution 1 Re-Tiling Not a lasting solution – Re-occurance expected Underwater Repairing – Expensive – Risk Management Dry repairs – require emptying the pool Cannot obviate water percolation to Substrate Operational Cost

Way forward – Solution 2 PolyUrea Expensive Intensive Surface Treatment Better for Greenfield Sites Not yet popular Down Under Designs and Colours will be an issue

Painting (Epoxy Treatment/Pool Paint) Way forward- Solution 3 Painting (Epoxy Treatment/Pool Paint) Medium to Long Term Solution (6-8 years) Widely Used Low Maintenance Low risk Ease of Cleaning No edges or Grouts

Way forward Re-tiling Not a lasting solution Underwater Repairing – Expensive, Afterhours Dry repairs – require emptying the pool Cannot obviate water percolation to Substrate PolyUrea Expensive Intensive Surface Treatment Better for Greenfield Sites Not yet popular Down Under Painting (Epoxy Treatment/Pool Paint) Medium to Long Term Solution (6-8 years) Widely Used Low Maintenance Low risk

Way forward - An Emoji Test Re-tiling Not a lasting solution Chances for further failures 12 WorkSafe notifiables 287 incidents PolyUrea Expensive Intensive Surface Treatment Better for Greenfield Sites Not yet popular Down Under Painting Medium to Long Term Solution (6-8 years) Widely Used Low Maintenance Low risk

Way forward – An Emoji test Re-tiling Not a lasting solution Chances for further failures 12 WorkSafe notifiables 287 incidents PolyUrea Expensive Intensive Surface Treatment Better for Greenfield Sites Not yet popular Down Under Painting Medium to Long Term Solution (6-8 years) Widely Used Low Maintenance Low risk

Way forward Re-tiling Not a lasting solution Chances for further failures 12 WorkSafe notifiables 287 incidents PolyUrea Expensive Intensive Surface Treatment Better for Greenfield Sites Not yet popular Down Under Painting Medium to Long Term Solution (6-8 years) Widely Used Low Maintenance Low risk

Way forward Re-tiling Not a lasting solution Chances for further failures 12 WorkSafe notifiables 287 incidents PolyUrea Expensive Intensive Surface Treatment Better for Greenfield Sites Not yet popular Down Under Painting Medium to Long Term Solution (6-8 years) Widely Used Low Maintenance Low risk

Painting - Considerations Emptying of Pool Duration of Closure 2 to 4 Weeks Round the Clock Works Method of Tile Removal Preparation of Surface – Grinding or Water Jetting Surface Treatment & Repairs to Shell Treatment to protrusions and existing Tile edges No. of Coats & Final colour Slip Resistance Treatment Curing Period Water Refill & Heating Staff performed well under the circumstances however we are extremely lucky that something serious didn’t occur at CSC and CRC. There weren’t policies and procedures in place to support the staff working at the sites and also put Council at risk. Rostering is too time consuming and we need to review how to improve time resources spent on completing the rosters.

Stages of Works Stage 1 Site Pre-works: Public Protection & Barricading Stage 2 Tile Removal /Demolition Works/ Clearing Debris Stage 3 Repairs prior to application of paint Stage 4 Tiling to Seating Areas (only) Stage 5 Coating Application- Primer Stage 6 Coating Application First Coat Stage 7 Coating Application Second Coat Stage 8 Reinstate Lap Lines Stage 9 Expansion Joint Sealent Stage 10 Demobilisation

General Program of Works Pool Refurbishment Construction Program Stage Description Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14   Tile Removal / Demolition Works Repairs Coating Application Expansion Joint Sealant

Substrate Problems

Surface Treatment

Tile Edge Treatment

Painting

Questions ?

Happy ? Govind Kartha Director GK Consultancy Pty Ltd, Mob: 04-0803-6676 eMail: gkartha@gmail.com Govind Kartha Director GK Consultancy Pty Ltd, Mob: 04-0803-6676 eMail: gkartha@gmail.com