ACR display works in progress Claudio Bortolin – Università di Udine

Slides:



Advertisements
Similar presentations
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
Advertisements

Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
22 March 2010 DCS workshop C. Bortolin, g. de cataldo and A. Franco INFN it/CERN CH 1 Progress on LHC data exchange LHC-ALI_DCS project overview Future.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Luminosity monitor and LHC operation
Wednesday
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Hand-shake Signals Between LHC Machine and Experiments
3D Animation: Fashion Show
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Monday 21st January & night
Monday 14th March Second fill with pilot + 3 nominal bunches
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Update on ALICE-LHC interfaces & BCM
Thursday morning – optics correction
Tuesday 22nd January - morning
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Luminosity measurement at LHC (The machine point of view)
Beam Dump and Injection Inhibits
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Luminometer Integration at IR2
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Mon Access for switching temperature probe DFB L7.
LHC Morning Meeting - G. Arduini
Thursday Fill 1364 (24 bunch) dumped at 07h
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Lecture II.
LHC Fast Timing Commissioning
Saturday Nov Stop proton operation. Switch back to ions
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
A better Portal.
Thursday 22 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Thursday 30th September De-bunching test
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Saturday 26 November 2011.
Beam instrumentation and background monitoring
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Daniel, Gianluca and Belen (for the Collimator team)
Tuesday
Presentation transcript:

ACR display works in progress Claudio Bortolin – Università di Udine INFN Padova & CERN C. Bortolin CERN - 02/09/2019

Big Screen in Control Room C. Bortolin CERN -02/09/2019 2

Web Monitoring http://alicedcs.web.cern.ch/AliceDCS/monitoring/main.aspx The panel is not resized; it is necessary to use the scroll bars C. Bortolin CERN -02/09/2019 3

General Data Information on Beam intensities, luminosity and background: Top measured by LHC Bottom measured by ALICE (published for LHC following the official Document: “Data exchange for the fixed display of experimental conditions” ref. lhc-op-es-0018) C. Bortolin CERN -02/09/2019 4

Injection Phase Left information about the position of the collimators in transfer line TT60 and TI2 which are used to inject BEAM1 Middle trend for beams intensities the light blue and orange spikes represent the injection intensities of beam1and beam 2 the blue and red lines stand for the intensities of the beam in the ring measured by the BPTX sensors Right background values measured by the BCM sensors and particle density measured by V0 C. Bortolin CERN -02/09/2019 5

Circulating Phase Left beam intensity measured by LHC Middle trend for beams intensities Right luminosity measured by LHC and ALICE (at the moment we are using only the T0 and V0 BBA AND BBC (1 minute Av) trigger counters C. Bortolin CERN -02/09/2019 6

Scheduled to be implemented Optimization of the displayed data (luminosity and background measured by ALICE will be published soon). Automatic switch between the tabs according to the beam mode (e.g.: Inject Probe Beam, Stable Beams, Circulate and Dump, ecc…). New Tab providing information regarding the signal conditioning: nBuckets colliding at IP2, B1-Gas and Gas-B2 bunches. C. Bortolin CERN -02/09/2019 7