Characterization of Wired-OR prototype board

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
1 Pulse Generator High Speed Digital Systems Lab Semestrial project – Winter 2007/08 Final Presentation Instructor: Yossi Hipsh Students: Lior Shkolnitsky,
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
Digital Fundamentals Floyd Chapter 1 Tenth Edition
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
AMY Meeting. 25 Feb 2011 Status.. AMY Meeting. 25 Feb 2011 AMY- First tests in Lecce AstroParticle Lab Signal Generator R&S SMB100A 9kHz to.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
© 2009 Pearson Education, Upper Saddle River, NJ All Rights ReservedFloyd, Digital Fundamentals, 10 th ed Digital Fundamentals with PLD Programming.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Floyd, Digital Fundamentals, 10 th ed Digital Fundamentals Tenth Edition Floyd © 2008 Pearson Education Chapter 1.
Trip-t testing progress report
AMY Meeting. 21 Mar 2011 what is new? Auger Lecce Meeting,
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
30th International Cosmic Ray Conference July , 2007, Merida, Yucatan, Mexico Performance of the 1.5 × 10 5 front-end electronics channel of the.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
A high rate fast precision tracking trigger with RPCs
Work on Muon System TDR - in progress Word -> Latex ?
Results with the RPC system of OPERA and perspectives
Silicon microstrip detector for imaging of fast processes at high intensity synchrotron radiation beam. Budker INP V.Aulchenko1,2, L.Shekhtman1,2, B.Tolochko3,2,
KLOE II Inner Tracker FEE
ECAL Front-end development
TDR Measurement of MCP Anode
Dubna/JINR Status & Plans
DCH FEE 28 chs DCH prototype FEE &
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
Preliminary Performance of the L2 Chamber (Side A)
News on second coordinate readout
Trip-t testing progress report discriminator fix
New Discriminator Board Test
Christophe Beigbeder/ ETD PID meeting
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
RPC Front End Electronics
Signal processing Lecture: Hans-Jürgen Wollersheim
A Multi-Threshold Method for TOF-PET Signal Processing
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Cosmic ray test of RPC for the ATLAS experiment
RPC Front End Electronics
Resistive Plate Chambers performance with Cosmic Rays
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

Characterization of Wired-OR prototype board Alberto Aloisio – Gianpaolo Carlino – Givi Sekhniaidze 200 Wired-OR boards have been produced to be used in integration test in Frascati and cabling test at CERN. Prototype tested with unshielded 16 pole flat cable. Bench test results Comparison of pulse shapes on RPC Statistical analysis on Cosmic Ray data 17 July 2002 Lecce - RPC meeting

Fast-Or board TDR analysis TDR test results: Z0 = 107 Ohm Lmin = 290ps Lmax = 320ps Line-to-line max skew is 30ps Connectors’ through holes 17 July 2002 Lecce - RPC meeting

Test setup 17 July 2002 Lecce - RPC meeting

Bench test results Input pulses in the 5 to 25 ns range (ch.1) Output pulse on the 100 Ohm load (ch.2) 17 July 2002 Lecce - RPC meeting

RPC signals without and with OR Selected pulses are acquired with a digitizing scope Scope is triggered by cosmic rays Signals from BML-D chamber equipped with final front-end boards with stretching capacitor Direct pulse Wired-OR 17 July 2002 Lecce - RPC meeting

Direct comparison Typical RPC pulses with and without OR are superimposed OR loading and multiple-reflection pattern sharpen the pulses Width and amplitude are both preserved Only few pulses acquired Statistical analysis is required to evaluate the impact on detector performances Direct pulse Wired OR 17 July 2002 Lecce - RPC meeting

Statistical analysis on Cosmic Ray events (8 strip pairs) Direct pulse Wired OR Leading edge Trailing edge Width Efficiency measured in both cases are the same VTH = -1.0 V, HV = 10400 V, e ~ 97% 17 July 2002 Lecce - RPC meeting