by Ranko Vuica and Željko Savić Croatia Control Ltd.

Slides:



Advertisements
Similar presentations
1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September , 2011.
Advertisements

Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Civil-Military coordination in France
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Free Route Airspace in DK/SE FAB
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Peter Matern Head of ADM Unit 30/01/2014
Continuous Climb Operations (CCO) Saulo Da Silva
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
CURRENT AIRSPACE MANGEMENT PROCEDURES AND LARA IMPLEMENTATION Traineeship report 15 October 2010.
Digital AIM Training - Digital NOTAM
Regional ATFM in Europe
1  Copyright 2005 EUROCONTROL Safety Performance Review Radu CIOPONEA Performance Review Unit EUROCONTROL.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
2009/10/06 STUDY ON RECOGNITION OF PROFESSIONAL QUALIFICATIONS Alternative title slide.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
ICC © Ifield Computer Consultancy Limited 2013 Ifield Computer Consultancy Limited Presentation to Directorate General of Civil Aviation of Kuwait And.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
© 2011 LAIC Aktiengesellschaft © Ifield Computer Consultancy Limited 2013 ATRAK-AISS Aeronautical Information System Services.
1 EUROCONTROL EUROPE AIR SPORTS Sporting & Recreational Aviation Conference GLIDING Günter Bertram.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
Free access to airspace
AIRSPACE Sgt. Lenka FENCLOVÁ 21 JAN Airspace of the Czech Republic 1.1 Classification 1.2 Airspace in general 1.3 Use of airspace 2.Questions.
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Overview Jean-Marc Loscos, DSNA
Airspace.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
AERONAUTICAL INFORMATION SERVICES
CLVV Briefing Useldanges Glider Sectors
Workshop on preparations for ANConf/12 − ASBU methodology
AIRSPACE CONCEPT WORKSHOP CASE STUDY
GUIDELINES Evaluation of National Rural Networks
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Safety Performance Review
AIM Operational Concept
Continuous Climb Operations (CCO) Saulo Da Silva
Malta Language Proficiency Requirements Implementation
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
OptiFrame WP1: Project Management
Gender statistics in Information and Communication Technology for Women’s Empowerment and Gender Equality Dorothy Okello, Annual.
GENDER STATISTICS IN INFORMATION AND COMMUNICATION
Ensuring a 'Flexible Use of Airspace'….
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Project Overview & User Forum Objectives
PROGRESS & CHALLENGES ATCOS’ VIEWS
Continuous Climb Operations (CCO) Saulo Da Silva
Presented by Eduard Porosnicu, EUROCONTROL
Module 5 The Climate Expert and your role as a consultant
Evaluation in the GEF and Training Module on Terminal Evaluations
An Airline Perspective
New Entrants, Commercial Space and Changing Airspace Management
RAD Evolution Workshop Network Approach to the RAD - DP/4
SPECTRUM STRATEGY & VISION
Traffic Management and FUA integration
AIRSPACE CONCEPT WORKSHOP CASE STUDY
RAD Evolution Workshop Outcome
Workshop on preparations for ANConf/12 − ASBU methodology
Airspace Volumes and Sectorisation Good Design Practice
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
Presentation transcript:

by Ranko Vuica and Željko Savić Croatia Control Ltd. AFUA Implementation in Lower Airspace Through Modular Flexible Structures by Ranko Vuica and Željko Savić Croatia Control Ltd.

Introduction COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 „Flexible use of airspace is an airspace management concept described by the International Civil Aviation Organization (ICAO) and developed by the European Organization for the Safety of Aviation (Eurocontrol), according to which airspace should not be designated as either purely civil or purely military airspace, but should rather be considered as one continuum in which all users’ requirements have to be accommodated to the maximum extent possible.” AFUA implementation in Lower Airspace through the Modular Flexible Structures Project results: „New modular flexible environment in lower airspace supports various activities in airspace, extends new possibilities for airspace use to all kinds of users and at the same time positively influences the awareness and safety of all users.”

Users’ Perspective Complexity of lower airspace Various types of users Airspace classes (G, C, D) Airfield and aerodrome operations (CTR) Non AMC-manageable military areas (P, R, D) Various types of users Military Police SAR Sporting activities (gliding, paragliding, etc.) General aviation Balloons, free balloons, RPAS/UAS Various needs Permanent airspace (location and height) vs AD-HOC areas Huge areas vs small areas Adjustable airspace (lateral and vertical boundaries) Time of use (seasonal, on weekends, daily, hourly) Avoidance of the full area establishment process Abuse of AD-HOC principles Continuous renewal of the approval for AD-HOC-created areas (permanent areas) Requested time of use Not realistic (3 months SR – SS) Uncertainty of operations Tactical approval depends on the actual situation Difficult planning process for other users Uncertain real-time status of an area − (active, non-active) Conflict resolving process Unknown priority rules

Regulation and Status of ASM Organization HLAPB (ASM 1) CIV AA AMC MIL AA Regulation in place ICAO, EU, national ASM organization (by the book) Concerns ASM 1 Area establishment process was not suitable for user demands ASM 2 AMC – civil-military coordination (mainly for commercial traffic and military areas) CIV AA – AD-HOC approval by an ANSP via NOTAM for 3 months (SR – SS) Pre-tactical approval process completely avoided (D-1) – conflicts on the day of activity ASM 3 Tactical approval on the day of activity – increased workload for ATCOs, restrictions in approval or rejected requests Actual status for planning purposes – unknown (ask a relevant ATC unit)

Assessment of Lower Airspace Continuous growth of users demands Uncontrolled "G" class of airspace limited to 1000 ft AGL Published areas Non AMC-manageable military areas (P, R & D) Limited to small enclaves in the vicinity of airfields Non-adequate for user needs Process of establishing a new area Duration of the establishment process Pressure on the organization and ASM system (continuous impact & safety assessments) Growth of requests for new AD-HOC areas on a daily basis Gap in the regulation Users avoiding the full establishment process for new areas Continuous renewal of the approval for AD-HOC-created areas (permanent areas) Procedures on a daily basis Non-manageable areas General announcement by NOTAM (SR – SS) For actual activity? (contact the relevant ATC unit) Safety concerns Pre-flight briefing (someone may be there) Actual usage and efficiency (unknown) Education of users (workshops, panels, forums, etc.) ASM tools and information dissemination Information dissemination by NOTAMs (too many with a general time of activation) Communication with the relevant ATC (by phone) General approval (by fax or e-mail / on paper)

Preconditions for Implementation MODULAR, FLEXIBLE ENVIRONMENT ASM ORGANIZATION & PROCEDURES ASM TOOLS ASM implementation at 3 levels Civil-military coordination CDM process established Implementation and adjustment of the regulation ICAO, EU and national Priority rules Airspace demand analyses Actual user needs Assessment of existing areas Actual usage of existing areas and airspace Existing procedures LoAs Procedures for fast CDM and booking processes Safety concerns Existing tools and means of communication Real-time information about the actual airspace status "Online" communication between the user and ASM Enhanced planning process

New Deal with Users D-1 reservation D tactical approval CDM Modular flexible structures – proposal Defined net of modular flexible structures (segmented airspace) Conducted Safety Assessment of segmented airspace and structures Determined priority rules AMC as a focal point at ASM 2 and ASM 3 levels Responsible for management on a daily basis Coordination between stakeholders Implemented fast CDM process Booking, activation and release procedures according to the FUA principles through ASM 2 and 3 Easily accessible ASM tool supporting the CDM process Net of structures published in AIP and the ASM tool (AMC Portal) Available to registered users according to the priority rules CDM USERS AA, AMC FMP ATC CESUP, AMC D-1 reservation D tactical approval ASM TOOL Priority rules

Implementation Process Changing the types of military areas From non AMC-manageable P, R, D areas to the AMC-manageable TRA and TSA areas Canceling all present civil areas for sporting activities In respective airspace where new fragmented, modular, flexible structures are to be applied Setting up a net of new fragmented, modular, flexible structures Suitable for use by all users (civil or military) Net of D-AMA, TRA and TSA AMC-manageable areas Publication in the respective AIP and given to the AMC for day-to-day management Regulatory framework adoption To enable new procedures and supporting tools to be implemented Implementation of new procedures through ASM tools in order to strengthen the execution of the new concept Trial phase of the project Measurement of key performance indicators Implementation reassessment and the implementation of lessons learned Operational use of new flexible, modular, fragmented areas on a daily basis Continuous measurement of key performance indicators

Design Methodology Lateral fragmentation of airspace New net of areas Small areas (GND − 9500 ft) Lateral boundaries designed on the known-landmark principles (VFR activities) New net of areas Suitable and available for various users and types of activities 3 possible area statuses (D-AMA, TRA, TSA) based on the type of activity or minimum equipment requirement Fast and efficient CDM process Simple booking process Defined rules of use, avoidance, transit (where applicable) and minimum equipment requirements

Purpose of Areas D AMA Applicable to all civil users who fly by the "see and avoid" principle Class "G" airspace Crossing of VFR traffic allowed with info about entering the "G" class airspace TRA Applicable to civil and military users equipped for the RMZ, TMZ Airspace retains the class of airspace from which it is temporary segregated Crossing of IFR possible after previous coordination Crossing of VFR possible after previous coordination and if equipped with a transponder TSA Applicable to all users (mainly state users) who need a segregated area exclusively Area manager is responsible for the safety within the area Crossing is not allowed

Gains of Modular Flexible Structures FUA/AFUA implementation in lower airspace More airspace available for users Real-time information about segregations in airspace Overview of the actual and planned situation in airspace Overview of airspace available for booking (volume and time) Simple and fast booking process (D-7 to D-1) Realistic time of activation Fast airspace release process after activity is completed "Online" communication between users and the ASM through an ASM tool Favorable ratio of the published and AD-HOC structures

Post-implementation Analysis CDM − Requested/approved/used New areas are used everyday Vicinity of airfields – maximum use Connected structures for bigger events Overflights between airfields and cooperation between users Significant rise of sporting activities Fast and safe segregation for military and police operations on demand More efficient planning process Planned/used D-AMA areas ("class G") – mostly used Simplicity of the process Safety of all airspace users

AMC Portal – Web Tool Internet is a huge part of our life; why not use it for the benefit of all users on a daily basis AMC PORTAL – current status All information in one place, for everybody to see and use

Conclusion FUA/AFUA implemented in entire airspace Airspace user Planning is realistic with a fast release process when there is no further need for segregation Improved safety of all users Airspace user Available airspace for all kinds of activities based on the actual needs (D-AMA, TRA, TSA) Increase in potentially segregated airspace in practice means an opportunity for greater airspace efficiency at allocation

Q&A? Thank you for your attention!