Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS #2627. 1.27e11 ppb, 4.11e33 cm-2s-1 13:36.

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Saturday :12 Stable beams fill 3351 Initial luminosity
Wednesday September 14th
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Summary of Week 49 Machine coordination: Jorg Wenninger & Jan Uythoven
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Monday 6th August & night
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Wire almost entirely through beam before BLM triggers dump
Friday Morning 7:30 injection for fill 2908
Sunday
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Fri :52 Stable beams fill #2536
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Monday 27th August & night
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Tuesday
Presentation transcript:

Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS #2627. 1.27e11 ppb, 4.11e33 cm-2s-1 13:36 Operator dump fill #2627. Physics for 10:08 hours. Int lumi 100 pb-1 15:19 TDI measurement - check alignment of jaws 'warm' 16:30 Optimising beam in injectors…. 20:55 Injecting for physics, fill #2628 22:17 Stable beams, initial lumi’s 4.8e33 cm-2s-1 06:07 Beams dumped, trip of ROF.A67B1 Int lumi 97 pb-1 Access for power converter piquet 15/05/2012 LHC 8:30 meeting

Fill #2627 Dumped by operator after 10:08 hours and about 100 pb-1 Around 8:00 start of IP8 beam positions seem to be drifting Drifts of luminous region position observed at IP1,5,8 (LPC) Sharp increase of lumi in IP2 -> increase of satellites Occasional ‘noisy RF’ requiring some gentle abort gap cleaning Philippe investigating OK next fill, o-night 15/05/2012 LHC 8:30 meeting

Check TDI alignment ‘warm’ No interlocks on TDI IP8 position anymore since last week The RU LVDT interlock was increased by 50 um During physics at 55 mm instead of 37.5 mm: less heating Want to check alignment with beam Lever arm effect, don’t know the real position of jaw & jumps position. Found jaw positions for IP2 and IP8 between 6.4 – 6.6 sigma. Setting 6.8: OK Tuesday last week Inner limit (RU) increased by 50 um Measurement IL Measured LVDT RU position cold 15/05/2012 LHC 8:30 meeting

Fill #2628 Problems with beam quality in transfer from PS – SPS Suspect extraction in PS Could not really fix, investigations will need to continue SPS also ‘optimised’, likely solved the difference between batches Beam sizes at injection with BSRT in test mode: flatter Federico Roncarolo 15/05/2012 LHC 8:30 meeting

Lumi per crossing also flatter From CMS 15/05/2012 LHC 8:30 meeting

Fill #2628 During ramp TCSG.A6R7.B2, integration time: 83.8 s, losses of 34 % of dump limit Slightly less losses then in previous fill Higher lumi’s: around 4.8e33 cm-2s-1 Losses during physics up to 40 % of dump threshold, IP5 and IP8 15/05/2012 LHC 8:30 meeting

Plan / Outstanding Plan Outstanding Finish access for PO, ROFA67.B1 – until at least 9:30 & pre-cycle Scraping at injection to reduce losses in squeeze Physics Outstanding Continue investigations beam quality from injector chain Orbit in collision needs to be corrected and trims incorporated (in particular point 5) Possibly LHCb polarity change on Wednesday’ 15/05/2012 LHC 8:30 meeting