EM simulations of the LHC beam screens including the weld

Slides:



Advertisements
Similar presentations
Point and Distributed Loading Tip deflection errors and sensitivity results.
Advertisements

FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
LHC e - cloud simulations C.Octavio Domínguez, Giovanni Rumolo, Frank Zimmermann 17 th January e - cloud simulations.
SPS impedance work in progress SPSU meeting August 11 th 2011.
Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
Eirini Koukovini-Platia EPFL, CERN Impedance budget and effect of chamber coating on CLIC DR beam stability LCWS2012, E. Koukovini-Platia, 25/10/12 1 C.
Outcome of yesterday’s brainstorming on the potential of using CALIFES or CTF3 electron beam for impedance studies Elias Métral, Benoit Salvant, Carlo.
RF contact non conformities in LHC interconnects: Impedance aspects N. Mounet, B. Salvant With the help of: Gianluigi Arduini, Vincent Baglin, Serge Claudet,
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
Update on the kicker impedance model and measurements of material properties V.G. Vaccaro, C. Zannini and G. Rumolo Thanks to: M. Barnes, N. Biancacci,
Studies of impedance effects for a composite beam pipe for the experimental areas Request from M. Galilee, G. Schneider (TE/VSC)
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
Status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, N. Mounet, T. Rijoff, B. Salvant.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
IMPEDANCE OF Y-CHAMBER FOR SPS CRAB CAVITY By Phoevos Kardasopoulos Thanks to Benoit Salvant, Pei Zhang, Fred Galleazzi, Roberto Torres-Sanchez and Alick.
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
Status of PSB Impedance calculations: Inconel undulated chambers C. Zannini, G. Rumolo, B. Salvant Thanks to: E. Benedetto, J. Borburgh.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
11 Update of the SPS impedance model G. Arduini, O. Berrig, F. Caspers, A. Grudiev, E. Métral, G. Rumolo, B. Salvant, E. Shaposhnikova, B. Spataro (INFN),
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
N. Mounet and E. Métral - HB /10/20101 News on the 2D wall impedance theory N. Mounet (EPFL/ CERN) and E. Métral (CERN) Thesis supervisor : Prof.
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
Update on new triplet beam screen impedance B. Salvant, N. Wang, C. Zannini 7 th December 2015 Acknowledgments: N. Biancacci, R. de Maria, E. Métral, N.
A first glance at the impedance of an SPS collimation system Nicolas Mounet, Benoit Salvant, Carlo Zannini Acknowledgments: collimation team (Daniele,
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
The reading is 7.38 mm. The reading is 7.72 mm.
On-line tool to calculate the expected heat load from impedance (and synchrotron radiation) Benoit, Giovanni and Gianni with the help of Elias Metral,
1 Transverse single-bunch instabilities in the CERN SPS and LHC Benoit Salvant for the impedance team: Gianluigi Arduini, Theodoros Argyropoulos, Mike.
F. Caspers, A. Grudiev, E. Métral, B. Salvant
Preliminary Y-chamber specifications – First draft
New results on impedances, wake fields and electromagnetic fields in an axisymmetric beam pipe N. Mounet and E. Métral Acknowledgements: B. Salvant, B.
Proposals for 2015 impedance-related MD requests for PSB and SPS
Benchmarking the SPS transverse impedance model: headtail growth rates
16L2 aperture measurements
LHC at 7 TeV/c: comparison phase 1 / IR3MBC
News on the TMCI and SPS transverse impedance
Update of the impedance of new LHC experimental beam pipes
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
Status of the EM simulation of ferrite loaded kickers
E. Metral, G. Rumolo, B. Salvant, C. Zannini (CERN – BE-ABP-LIS)
Status from the collimator impedance MD in the LHC
Beam impedance of 63mm VM with unshielded Bellows
impedance aspects for the beam screen
LHC Beam screen: impact of the weld on the wakes
IMPACT Simulation of the Montague Resonance at PS
Simulations and RF Measurements of SPS Beam Position Monitors (BPV and BPH) G. Arduini, C. Boccard, R. Calaga, F. Caspers, A. Grudiev, E. Metral, F. Roncarolo,
Tune shifts in LHC from collimators impedance
W. Bartmann, M. Benedikt, E. Métral, D. Möhl, G. Rumolo and B. Salvant
Symbols for the Type of Welds.
LHC impedance: Comparison between phase 1 and IR3MBC – follow-up
Some results on the LHC multibunch modes at 7 TeV/c
CMS vacuum chamber. Geometry for wakefield calculations
Elias Métral ( min, 19 slides)
Wave Interference.
Status of Impedance studies
Power loss in the LHC beam screen at 7 TeV due to the multi-layer longitudinal impedance N. Mounet and E. Métral Goal: Check the effect of the multi-layer.
Collimator design with BPMs (TCTP)
C. Zannini, G. Rumolo, V.G. Vaccaro
Status of the EM simulations and modeling of ferrite loaded kickers
CERN-SPS horizontal instability
LHC collimation review follow-up Impedance with IR3MBC option & comparison with phase 1 tight settings N. Mounet, B. Salvant and E. Métral Acknowledgements:
Multiphysics simulations of impedance effects in accelerators
Update of the heating of ALFA detector in 2011
HL-LHC Engineering Change Request # REDUCTION OF Q1 BEAM SCREEN COOLING TUBE DIAMETER FROM Ø16 MM TO Ø10 MM N. Kos TE-VSC TCC #77,
Presentation transcript:

EM simulations of the LHC beam screens including the weld Preliminary analysis C. Zannini, E. Metral, G. Rumolo, B. Salvant

Model studied LHC design as it is built and installed In this step we are only interested to understand the effect of the weld . weld

Model studied a=46.4 mm b=36.8 mm w=2 mm L=1m w b a L

Comparing with and without weld For a displacement in x of 5 mm the horizontal dipolar wake with weld seems to be five time larger than the wake without weld

Horizontal dipolar wake with weld versus displacement The displacement is considered negative if it is in the direction opposite the weld The horizontal dipolar wake with weld for a displacement in x of -5 mm seems to be twenty-five time larger than the wake with weld for a displacement in x of 5 mm

Comparing dipolar terms xdip weld  2*xdip_noweld xdip 2weld  2*xdip_weld