Change Order Number One Purchase Order for Ferric Chloride Use

Slides:



Advertisements
Similar presentations
Home Work Each day 3780 m3 of wastewater is treated at a municipal wastewater treatment plant. The influent contains 220 mg/L of suspended solids. The.
Advertisements

© 2013 O’Brien & Gere Volute Press Application on Water Treatment Residuals 2013 NYC Watershed / Tifft Science & Technical Symposium September 19, 2013.
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
Stone media TF design Example 1
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Nutrient Issues at the Blue Plains WWTP February 2004.
Anne Arundel County Department of Public Works
Biological waste water treatment
The Basics of Phosphorus Removal
Nutrient Removal Project: Chemical Phosphorus Removal Jill Crispell, Stephanie Wedekind, Sarah Rosenbaum.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
Wastewater Characteristics CE Importance of Characteristics The degree of treatment depends on: The degree of treatment depends on: Influent characteristics.
WASTEWATER ENGINEERING
Nitrification and Denitrification
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates October 14, 2014 West Point Wastewater Treatment Plant, Seattle.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
Control of Struvite Deposition in Wastewater Treatment Plants
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
September 23, 2004 EVEREST Water Systems Inc. Solution Clear The is.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
Phosphorus Removal in a Membrane Reactor System— A Demonstration Study Wayne Lorenz, P.E. and Matthew J. Gavin Wright Water Engineers, Inc. and Newell.
McMaster Innovation Park 114A-175 Longwood Road South Hamilton, ON L8P 0A1 Canada Brazil Water and Wastewater Mission.
The Living Machine & Leachate
Treatability Evaluation of Domestic Wastewater for a Rational Selection of Treatment Processes for a Rational Selection of Treatment Processes for Water.
Volvo Group North America, LLC Reuse of Wastewater - A Manufacturer’s Experience Steve Pierett, Env.Mgr. CEM, CRM, CP EnMS-Industrial.
Wastewater Treatment Processes
NATURAL WASTEWATER TREATMENT  Pollutant removal by minimal energy utilisation and chemicals  Usage of natural processes (natural resources)  Low cost.
DESIGN OF WASTEWATER TREATMENT PLANT
MOLYBDENUM Nathan Turner. Moly B Denum My History Wixom 2002 Wixom 2003 South Huron Valley (SHVUA) 2005 South Huron Valley (SHVUA) 2006.
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
APC-MB05 IS ADVANCED IN WASTEWATER TREATMENT SYSTEMS APC Wastewater Treatment System.
Watershed Overview of Wastewater Treatment Plant Performance Presentation to Wastewater Practitioners Group 15 October 2015.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Aeration System Opportunities Dave Reardon, PE, ENV SP HDR National Director - Water Sustainability WW/W Sustainable Energy Cohort-Session 5 January 31,
Welcome to the Key Largo Wastewater Treatment Plant.
OPS 571 Week 2 DQ 1 To purchase this material click below link 571-Week-2-DQ-1 Management may choose to build.
Conventional Sewage Treatment Plants:
WATER – WASTEWATER TREATMENT EXPERIENCE
WATER – WASTEWATER TREATMENT EXPERIENCE
LP Examples Wastewater & Water Quality
FUTURE REQUIREMENTS AND GOALS
CITY OF HALLANDALE BEACH
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
Inventory and Tertiary Treatment of Effluent from Textile Industries in Bangladesh The use of a new system combining an enhanced coagulation, flocculation.
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
Reduction of Accumulated Solids
Urban planning & Infrastructure optimization
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Black River Local School District Planning for Our Financial Future April 26, 2018
Mainstream ANITA Mox Pilot Testing at Los Angeles County Joint Water Pollution Control Plant Meg Hollowed Veolia Water Technologies.
An example of Finland's approach to wastewater treatment for households in rural areas Kimmo Tiilikainen Minister of the Environment Finland
CTC 450 Review WW Systems Operations.
Wastewater Facilities Upgrade Project
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
IAWD Danube Water Conference 2019 Vienna, 20th May 2019
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Change Order Number Five, Contract M03037P01, Professional Services, 2050 Facilities Plan – Ultimate Build Out, and Approve Changes in Total Project Cost.
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Authorizing ED to Reject Bid for Contract P01005C10
Building 360 Freight Elevator Rehabilitation at SSWRF
Advanced Wastewater Treatment
Commission Agenda Item #5
Authorize ED to Execute Purchase Order
Commission Agenda Item #1
Commission Agenda Item #2
Presentation transcript:

Change Order Number One Purchase Order for Ferric Chloride Use South Shore Water Reclamation Facility Commission Agenda Item # 9

Ferric Chloride (FeCl3) Use at SSWRF Veolia used FeCl3 between 2008 and 2012. Used for phosphorous removal Provided benefit of additional BOD removal in primary clarifiers Reduced BOD loading to aeration system Potential improved plant performance Reduced aeration demand

FeCl3 Use at SSWRF Between 2009 and 2012, Veolia gradually reduced use of FeCl3 Substituted ferrous chloride (FeCl2):~1/3 cost of FeCl3 Since 2016, SSWRF has had challenges meeting plant capacity and effluent quality Change from FeCl3 to FeCl2 is one differing condition

Previous Short Term Pilot Test MMSD and Veolia conducted a short-term pilot to feed FeCl3. Short durations at different dosage rates of both FeCl3 and FeCl2. Saw improved BOD removal in primary clarifiers with FeCl3 as compared to FeCl2.

Proposed 3 Month Test To better understand all impacts, now propose a 3 month FeCl3 test. Change other operational conditions at SSWRF to be similar to 2008-2010 operations. Isolate impacts of changes in operations from changes in characteristics of wastewater influent. Determine advantages and disadvantages to treatment process and plant operations.

Commission Request Staff/VW initiated 3-month test in mid-May. District paying incremental cost of test, totaling $336,960. Initial purchase order issued to VW using ED Authority: $149,760. Request to authorize change order in amount of $187,200 for remaining amount.

QUESTIONS?