MAE 435 Progress Report II 4/2/13
MAE 435 Raising Canes Fundraiser (over $180) Panda Express Fundraiser (over $150) Very Generous Donation From Dr.Chaturvedi ($2)
Aerodynamics Team Finalizing nose cone mold (XVD longboards) Analysis was completed on body panels (~63% lighter) Side pods are completed Next step will be fabricate nose cone and assemble body panels
Chassis Team Fabricated front & rear brake caliper mounts Fabricating shifter & pedals Waiting on L&W parts Completing welding of entire frame
Powertrain Team Exhaust System is 100% Complete Wiring is 80% Complete Fuel system is 60% Complete Differential / Rear Brake Rotor are 100% Complete No progress on Air Intake