Two beam coupling impedance simulations

Slides:



Advertisements
Similar presentations
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
Advertisements

Impedance of the TOTEM Roman Pots Nicola Minafra, Benoit Salvant, Nicolò Biancacci, …
Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
RF quadrupole for Landau damping Alexej Grudiev 2013/10/23 ICE section meeting.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
TDI longitudinal impedance simulation with CST PS A.Grudiev 20/03/2012.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
Simulation of trapped modes in LHC collimator A.Grudiev.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Trapped Modes in LHC Collimator (II) Liling Xiao Advanced Computations Department SLAC National Accelerator Laboratory.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia AB-BI-PI.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
Frequency map analysis workshop - Orsay 1 - 2/04/04Mahdia Belgroune 1 Role of the frequency map analysis in the choice of the working point of SOLEIL M.
Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
Transverse Stability Simulations with Linear Coupling in PyHEADTAIL X. Buffat, L. R. Carver, S. Fartoukh, K. Li, E. Métral, T. Persson, B. Salvant, M.
HEADTAIL simulation during the accelerating ramp in the PS S. Aumon - EPFL & CERN Acknowledgement to B. Salvant, G. Rumolo.
XXIII European Synchrotron Light Source Workshop, November 2015 Eirini Koukovini-Platia Diamond Light Source Collective effects at Diamond Experimental.
Feasibility of impedance measurements with beam N. Biancacci, N. Wang, E. Métral and B.Salvant COLUSM meeting 27/05/2016 Acknowledgements: A. Lafuente.
High Bandwidth Damper System: kicker impedance
TDI: to coat or not to coat?
Interpretation of resonant wire measurements on the TCSPM
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Longitudinal impedance of the SPS
Multipoles of the accelerating field and the beam distortion in TBTS
CLIC Main Linac Cavity BPM Snapshot of the work in progress
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Electron cloud and collective effects in the FCC-ee Interaction Region
A.KOLOMIETS & A.KOVALENKO
Luminosity Optimization for FCC-ee: recent results
LHC at 7 TeV/c: comparison phase 1 / IR3MBC
Dummy septum impedance measurements
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
Overview Multi Bunch Beam Dynamics at XFEL
TCLIA/TCTV transverse impedance simulation
¼ meshed models for Omega3P calculations
Simulation of Monopole modes trapped in LHC collimator
Simulation of trapped modes in LHC collimator
The LHC25ns cycle in the PS Triple splitting after 2nd injection
Beam impedance of 63mm VM with unshielded Bellows
LHC (SSC) Byung Yunn CASA.
TCLIA/TCTV broad band transverse impedance
CEPC Main Ring Cavity Design with HOM Couplers
Simulation of Longitudinal and Transverse Impedance of TCDD (original geometry) Grudiev
Tune shifts in LHC from collimators impedance
Simulation of Monopole modes trapped in LHC collimator
SPS-DQW HOM Measurements
HBP impedance calculations
Observation of Transverse Mode Coupling Instability at the PS and SPS
Collective effects in the SPS and LHC (longitudinal plane)
Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
TCLIA/TCTV transverse BB impedance versus gap size
PSB magnetic cycle 900 ms MeV to 2 GeV
TCLIA/TCTV transverse BB impedance versus gap size
Presentation transcript:

Two beam coupling impedance simulations Grudiev 28/09/2012 AP forum on Two beam impedance

outline What was done in the past What was not done TCTVB impedance simulations: two beam RF heating What was not done Beam-beam broad band coupling impedance RF Multipoles of the trapped modes: longitudinal and transverse ….

TCTVB impedance simulation and mitigation (LHC Project Note 413) Summary of the findings concerning the initial design • An increase of the longitudinal broad-band impedance by 0.66 mΩ at injection and 1.06 mΩ at top energy is acceptable. • An increase of the transverse broad-band impedance by 0.04 MΩ/m at injection and 0.47 MΩ/m at top energy is not acceptable. A reduction to a level of about 1 % of the total LHC budget (0.014 MΩ/m and 0.028 MΩ/m, respectively) is strongly recommended. • Both overall power loss of 391 W in the whole device and the local heating of rf-fingers of 2.5 W due to monopole trapped modes are too high and must be reduced by at least factor 10. • The coupled-bunch instability tune shift only due to dipole trapped modes is very close to the stability limit. Taking into account all other sources of impedance in the LHC can lead to the loss of stability. It is strongly recommended to reduce the impedance of the dipole modes by at least factor 10.

TCTVB impedance (cont.)

TCTVB impedance (cont.) That is all what has been studied concerning the two beam coupling in TCTVB. The same treatment has been applied to TDI.

Beam-beam broad band coupling impedance BB impedance: Longitudinal Transverse B1-to-B1 and B2-to-B2 BB coupling impedance has been calculated. B1-to-B2 and B2-to-B1 terms of the BB impedance could be calculated as well by using different integration paths Does it make sense? Is it included already in some other way?

TDI beam locations: b1, b2, half gap=8mm X=-68mm b1; X=-8mm b0; X=0 N.B. in fact, there is also a small vertical shift from the horizontal symmetry plane which is neglected in the simulations

RF multipoles in TDI RF multipolar expansion: Half gap = 55 mm Panofsky-Wenzel theorem: Mode f=60.6 MHz, Q=189, R/Q[b1,b2] =[0.43,0.1] Ohm; Ib1=1A => Vb1 = 81V n=2 multipole: RF quadrupolar strength integrated along TDI is 58 µTm/m b2 will experience horizontal kick of 58 µTm/m*0.068m = 4 µTm ??? What could be the effect of this RF quadrupole excited by the beam(s), not by external source ??? Seems to be very week in this case

Measuring frequency of the resonant impedance If the phenomenon is resonant and the beam-beam interaction takes place over many turns then the longitudinal position of the location where the beam 1 encounter beam 2 does not correspond to the location of the beam-beam “impedance” source On the other hand, in this case, a careful scan of dp (the difference in the longitudinal position of the beam1 versus beam2) should exhibit some kind of periodic behaviour of the instability. This related to the fact that at certain values of dp two beams are interacting with the “impedance” (resonant) in phase and at some others values of dp they are out of phase. Measuring and analysing the periodic behaviour if any can give us frequency of the resonant. Scan of dp with the step of 1 ns over 1 us will probe the spectrum up to 1 GHz with the resolution of 1 MHz