NZGW - Industry Update 2018 Year in review and looking forward

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

© 2013 Cairn India Limited MEASURES TO BE TAKEN AT DESIGN STAGE FOR IMPROVING QUALITY GATED PROCESS Anirban Ghosh Senior Manager- Quality Assurance CAIRN.
AFD support to geothermal development
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
STRATEGIC VALUE OF GEOTHERMAL ELECTRICITY AND THE IMPACT OF ITS PRICING Anang Yahmadi PT PLN (Persero) – Directorate of Construction and New/Renewable.
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Renewable Energy in Oman Public Authority for Electricity and Water Khalil Alzidi Senior Renewable Energy Engineer.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
PPost - Contractual activities  Warrantee aspects  Assist clients in operation and maintenance  Retrofit and other facility improvement services OUR.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Bridge Engineering Section Bridge Rehabilitation.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
No part of this report may be circulated, quoted, or reproduced for distribution without prior written approval from KenGen. All the information contained.
Construction Construction is a discipline. It is a combination of Art Science S.W. Nunnally, Construction Methods and Management, 7th Edition, Pearson.
Studi Kelayakan (Feasibility Study)
GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Tom MAZOUR IAEA, Division of Nuclear Power
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
PHASED ACTIVITIES AND BASELINE DOC’s FOR UTIILITIES ACQUISITION BULK SERVICE LIF-CYCLE APPROACH IDENTIFICATION & ANALYSIS APPLICABLE TECHNOLOGY / RESEARCH.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Geothermal Fields On the Ring of Fire Prospect Developed Fields.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Weddell Power Station unit three
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
Independent, integrated thinking.
1 1 Presenter / date if required Independent, integrated thinking.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Geothermal Policy and Regulation Cases from Chile, Kenya, New Zealand and the Philippines November 2015.
Click to edit Master title style Planning and Designing a Lean Manufacturing Facility.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
Division of Engineering Geotechnical & Engineering Services Branch Project Geology Section in West Sacramento Rob Barry Supervising Engineering Geologist.
RCT Pvt Ltd (MULTIDISCIPLINARY CONSULTANCY COMPANY) PROFILE AND SERVICES OVERVIEW.
Planning and Realisation of Wind Farms
Corporate Presentation
Long-Term Planning Presented by: APP Site Visit Don Untch
Greenland – Iceland, New opportunities
PROJECT MANAGEMENT 2 Chu Eu Ho
Nuclear Power Update for The Society of American Military Engineers
Zahrani & Selaata IPP Projects
بازاریابی و بازرگانی زمستان 93.
Title: Introduction of Standard Steps in Planning and Implementation of Water Sector Projects in Ethiopia. Prepared by: Dr.-Ing. Asie Kemal Jabir, Addis.
WorkGroup N 02 Countries Iran, Vietnam, Kenya, Jordan, Nigeria, South Africa, Poland and Morocco.
Developing of Licensing Process for NPP
Controlling Project Cost and Schedule
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Definitions EPC EPCM Design/Build Contract Lump Sum
THE KENGEN journey to world class innovation
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Presentation to NZ Geothermal Workshop
Update on the Philippine Geothermal Industry
RIBA Plan Tom Robinson sir david Swindells Vii
MTL Geothermal Update MTL Geothermal Update 2018.
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

NZGW - Industry Update 2018 Year in review and looking forward November 2018

AECOM Geothermal

AECOM has experience in Engineering 50 geothermal developments, with a combined output of over 3,000 MW. Projects includes New build Modification/ Expansion/ Rehabilitation of existing Plant Operational improvements and Upgrading of Plant Controls

AECOM Services

AECOM Geothermal – Life Cycle Support Project identification Condition Assessment Pre-Feasibility Feasibility Studies Site layouts and preliminary plant layouts Environmental Impact Assessment Licensing Permitting Assistance Conceptual design Front End Engineering Design (FEED) Detailed Design Owners/Bankers/Lenders Engineer (EPC or BOOT) Project Management (Traditional, EPC or EPCM) Strategic development Planning & Scheduling Procurement Cost Estimating Tender Evaluation & Reporting Inspection & Expediting Construction Management and Site Supervision Start-up, Testing and Commissioning Economic Analysis Training Capacity Building Financial services Policy studies and support

AECOM’s Geothermal Activity 2018

New Zealand 2018 Mercury - Ngatamariki, Rotokawa & Mokai Upgrades on Binary cycle plant storage/retention of organic fluid to comply with Major Hazard Facility (MHF) requirements Mercury – Mokai turbine expansion joint flow liner failure investigation

Indonesia 2018 PLN – Kamojang Units 2 & 3 Rehabilitation Concept design and Bid Document preparation Supreme Energy - Rantau Dedap - FEED and EPC Contractor Procurement SAE - Baturraden - Predrilling Feasibility Study Supreme Energy – Muara Laboh - Specialist geotechnical engineering support for slope stability. Star Energy – Gunung Salak brine heat recovery

Indonesia 2018 PLN – Kamojang Units 2 & 3 Rehabilitation Concept design and Bid Document preparation Supreme Energy - Rantau Dedap – Design review of EPC Contractor design SAE - Baturraden - Predrilling Feasibility Study Supreme Energy – Muara Laboh - Specialist geotechnical engineering support for slope stability.

Philippines 2018 EDC – Leyte Assessment of Seismic Resilience EDC – Malitbog Control System Integration EDC – Tongonan Control System Integration EDC – Malitbog GRS Upgrade Concept Study EDC – Palayan Binary Contract Assistance EDC – Palinpinon 1 & 2 Control System Integration EDC –EDC – Bacman Protection Setting Review

Kenya 2018 KenGen - Olkaria VII – Technical and Commercial Feasibility Study for 140 MW GPP

2019 Looking forward

Indonesia 2019 PLN - Continuation of Kamojang Units 2 & 3 Rehabilitation project Supreme Energy - Continuation of Rantau Dedap implementation SAE - Continuation of Baturraden exploration after drilling results available Star Energy – Wayang Windu wellpad MBI piping design

Philippines 2019 EDC – Continuation of Leyte Resilience EDC – Continuation of Palinpinon 1 & 2 Control System Integration

Kenya 2019 KenGen - Olkaria VII – FEED 140 MW GPP Sosian - Continuation of Menengai development

Thank you