Problem Definition Review

Slides:



Advertisements
Similar presentations
P14415:P3 Arborloo Plastic Base Development
Advertisements

BRIAN CHURCH ANTHONY SALMIN TYLER BREITUNG ROSS BLUTH MICHAEL OPLINGER STEPHEN MROZ P15318: Gaseous Mass Flow Rate Controller Week 3 Problem Definition.
Pennington WTW Review Meeting SWS, Crawley 8 April 1997.
Free Powerpoint Templates Page 1 Free Powerpoint Templates Introduction to Project Management What is a Project? Project Life Cycle Project Management.
Introduction to Software Engineering Dr. Basem Alkazemi
Strategy and definition exercises February 5, 2009.
MSD 11209: WOCCS: Long-Range RF Module Meet the Team Danelle Grabski- Electrical Engineering Jacky Ng- Electrical Engineering Josh Doolin- Electrical.
Modern Systems Analysis and Design Third Edition
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
R15701: ABVI Project Opportunities Sabrina Caliri, Joseph Lee, Christine Lochner, Ian Nanney, Courtney Smith, Thomas Visalli, Kenneth Wilkinson Voice of.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
R15701: ABVI Project Opportunities Sabrina Caliri, Thomas Visalli, Joseph Lee, Christine Lochner, Ian Nanney, Courtney Smith, Kenneth Wilkinson Voice of.
Meeting Summary Dr. Rabi Mohtar – Comments from meeting Corn is one of the most water-inefficient crops Make sure you understand the soil characteristics.
Adaptive Processes © Adaptive Processes Simpler, Faster, Better Software Requirements.
Biochar Concrete Roofing Sheets for Nicaragua
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
CIS 499 Senior Seminar Introduction to IT project management.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
1 Exhibit 1: Integrated Product Development (IPD) – Level 1 Innovation is the engine driving revenue growth Innovation Engine Manufacturing Products New.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
Lesson 1 - My Country Does What? Concepts: Standard of Living Gross Domestic Product (GDP) GDP per Capita Purchasing Power Parity.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
NURHALIMA 1. Describe steps involved in the project initiation and planning process Explain the need for and the contents of a Statement of Work and Baseline.
Insert Nonprofit Logo Project Name Final Presentation.
IDeaWorks- Good To Great – Program Hisham Al Zanoon July 5, 2012.
Requirement Engineering
P16104 Microfluidic Spectroscopy for Proteins within CubeSats.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
Cross Community Working Groups Marika Konings | At-Large Capacity Building Webinar | 6 Oct 2015.
Office 365 FastTrack Planning Engagement Kickoff.
Sports & Entertainment Marketing Mr. Bernstein Sponsorship, pp April 2, 2013.
Chapter 5 Initiating and Planning Systems Development Projects
P16512 – 3D Printing Ink Development Test Rig
Introduction to Project Management
Modern Systems Analysis and Design Third Edition
Chapter 6 Initiating and Planning Systems Development Projects
Rochester Institute of Technology P17487: KonTiki Kiln Heat Recovery
Preliminary Detailed Design Review
Social enterprise in not-for-profits
Multidisciplinary Senior Design I: Problem Definition Review
You can make it, you can sell it, but can you “make it” selling it?
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Enterprise-grade solutions for a mobile-first, cloud-first world
Electrical Engineering
System Design Review P17701 ABVI Upcycling: Cotton Insulation
Right Move, Right Place, Right Time
Detailed Design Review
بازاریابی و بازرگانی زمستان 93.
P15073: Autonomous IV Stand Michael Binger, Caitlin Conway, Nick Goddard, Nicholas Jacobs, Christina Pysher, & Ethan Whritenor Mike September 11, 2014.
Chapter 5 Initiating and Planning Systems Development Projects
Multidisciplinary Senior Design I
P16702: ABVI Fabric Shredding Process and Facility Design
Lecture 6 Initiating and Planning Systems Development Projects
Title of Proposal in Initial Capital Letters: Times New Roman (18 point Boldface)
Known as the business team, the Sun Microsystems approach to concurrent or simultaneous engineering may be used during the introduction of new products.
Modern Systems Analysis and Design Third Edition
Chapter 5 Initiating and Planning Systems Development Projects
Planning a Project Chapter 2.
My Future Career ~A product planner~ Madoka Mori Student ID:
Planning a Project Chapter 2.
(select this text and type the name of your development company)
Final Presentation BUS320: E-Commerce and E- Business.
(select this text and type the name of your development company)
(select this text and type the name of your development company)
Joint Application Development (JAD)
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
Preliminary Detailed Design Review
Chapter 6 Initiating and Planning Systems Development Projects
Presentation transcript:

Problem Definition Review P17701 - ABVI Upcycling: Cotton Insulation Lucas Jackling, Mitch Goepel, Samantha Kon, Denning Crenshaw

Agenda Introduce Team Problem Statement Project Deliverables Use Scenarios Customer Requirements Engineering Requirements Project Plan Questions/Concerns

Team Introductions & Roles From left to right: Denning Crenshaw, Lucas Jackling, Josh Kon and Mitch Goepel Team Introductions & Roles Mitch Goepel - Project Lead Lucas Jackling - Documentation Manager Josh Kon - Technical Advisor Denning Crenshaw - Communications Director

Problem Statement Current State: Goodwill has a surplus of donations that they cannot resell in stores in which they see opportunity for increased revenue. Desired State: Cotton insulation is designed and tested. End product performs equal to or better than current insulation product and is more valuable than current state. Project Deliverables: All design documents Functional product that can be marketed to retail stores and construction contractors across the country. Final Report (introduction, goals, analysis/results, conclusion) Constraints: The material type that is to be used for the final product The source of the material Product must be economical

Use Scenarios

Customer Requirements

Engineering Requirements: How we will measure customer requirements

MSD I Project Plan

Questions/Concerns