Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.

Slides:



Advertisements
Similar presentations
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday :12 Stable beams fill 3351 Initial luminosity
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
LHC Morning Meeting - G. Arduini
Machine availability reaching well over 80%
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Mike Lamont, Jorg Wenninger
LHC Status Sun Morning 20-Mai
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Sunday morning Recovering from 400 kV disturbance.
Monday February 28th 8h00: Injection
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
Yesterday’s morning’s controls issues
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
(on behalf of the LHC team)
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Programme for Friday 9 July
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Injection Studies: 50 ns ABT/BTP.
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Presentation transcript:

Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change IR6 interlock BPMs reconfiguration and tests Check IR6 BPMs with 8b per beam: No interlock for windows completely closed, for both beams, as expected Checking BPM IR6 intlk with 16b B1 dumped when moving from 0.75 to 0.25 mm as expected - beam position was +0.5 mm B2 dumped when moving from 1.21 to 0.71 mm as expected - beam position was +0.8 mm 27/03/2011 LHC 8:30 meeting

Saturday afternoon 16:15 Next 1.38 TeV attempt 18:20 Stable beams Checking BPM interlock with full pattern and new count/turn settings Worked OK for B1 and B2 B1 dumped between +0.13 and -0.37 mm (position was 0.08 mm) B2 dumped between +1.0 and +0.5 mm (position was +0.55 mm) OK to fill with new pattern 16:15 Next 1.38 TeV attempt Beams dumped (SIS on TCDQ/beam position) Joerg identified the cause in a BPM which started to develop an offset today. He opened the thresholds to recover the margin 18:20 Stable beams bigger emittances (around 3 microns from SPS) different filling scheme avoiding offset collisions 27/03/2011 LHC 8:30 meeting

Updated IR6 interlock BPMs Brennan Goddard bunchCntWin1 changed from 70 to 75; turnCntWin1 changed from 100 to 5; Left the other values unchanged bunchCntWin2 250; turnCntWin2 10 All position values unchanged. As a result, the interlock will now only become active when 15 or more bunches are out of tolerance in IR6. The interlock thus becomes active at injection only when 15 or more bunches are circulating *** IMPORTANT: NO RAMP OF FEWER THAN 80 BUNCHES ALLOWED UNTIL THE INTERLOCK IS MODIFIED BACK TO THE INITIAL VALUES * 27/03/2011 LHC 8:30 meeting

1650 Reyes 27/03/2011 LHC 8:30 meeting

1653 – start fill 27/03/2011 LHC 8:30 meeting

Incoming Sat PM 1.38 TeV Sat night 1.38 TeV stable beams Sunday AM VdM scans Sun PM Transfer lines tests - Injection loss calibration before the shielding (needs to be done before TS) 2 h Sun PM/night Mon 06:00 Dump beams for TS 27/03/2011 LHC 8:30 meeting

Noted – Per Hagen Will the “soon to come” fill 1664 be celebrated? with or without crossing angle… 27/03/2011 LHC 8:30 meeting