GISC Exeter Status Report

Slides:



Advertisements
Similar presentations
The WMO Information System (WIS)
Advertisements

Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
© Crown copyright Met Office Status Report WIS – WMO Information System Chris Little, Met Office, Co-chair OGC Met. & Oceanography Domain WG.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
© Crown copyright Met Office Joint ICT GTS-WIS MTN and ET-GTS WIS OI Chris Little, The Met Office September 2008 Geneva, Switzerland.
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
The WMO Information System (WIS)
(CBS/OPAG-ISS ) November 2007 Washington, USA
Status of GISC Tokyo GISC Tokyo / JMA.
GISC Exeter Status Report
Météo France GISC and DCPCs
GISC Seoul Status TT-GISC, Melbourne April 2016
GISC Exeter Status GISC Seoul Workshop, Jeju, Korea,
Status report of GISC Beijing
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
Requirement for Full Global Operation on WIS Survey on the WIS Doc
DCPC Development in the Hong Kong Observatory
Status Report of GISC Beijing
Progress Report on WIS Implementation, Hong Kong Observatory, Hong Kong, China Submitted by: S.T. CHAN (Hong Kong, China) (Doc 12) Expert team on WIS centres.
GISC PRETORIA STATUS REPORT.
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
RTH Exeter Status Report
GISC Beijing Status Report Doc25
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
LFRic: A new model for the Met Office
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
Status of the WMO WIS Implementation at NOAA/NWS October 2015
TT-GISC-2016 Doc 15 Agenda Item 2
© Crown copyright 2009.
Korea Meteorological Administration
GISC Moscow status report Submitted by: Sergey BELOV (Russia) (Doc 17)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
GISC xxxx Status Report Submitted by: xxx XXX (Country) (Doc xx)
Toulouse GISC Status TT-GISC.
Toulouse GISC Status Doc 29
Future Requirements of WIS Centres
Status Report of RTH Tokyo
Strengthening climate applications in developing countries
© Crown copyright 2009.
© Crown copyright 2009.
Workshop – Adapting the Advisor idea
Workshop – Dissemination of Warnings & Forecasts
GISC MOSCOW STATUS REPORT 2018
Weymouth Weather Brief: Sunday 2nd Sept
WIS Project Office WMO WIS Data Exchange WIS Project Office WMO
Workshop – Web page development
WMO Information System
Status of RA II WIS Implementation Plan
GISC Washington status Kari Sheets Agenda item
Toward WIS2.0 Shigeharu NISHIKAWA Japan Meteorological Agency
Status Reprot GISC SEOUL
Status Report GISC Tehran
Report from Task Team on GISC (TT-GISC)
Status report of GISC CASABLANCA
GISC Offenbach – Status Report 02/2014 (Doc 19)
GSICS User Expectations at Met Office
- Measurement of traffic volume -
GISC Offenbach Kai Wirt Task Team GISC TT-GISC2018
Status report of GISC Beijing
Role of Water in the Global Data Processing and Forecasting System
Status report of GISC Beijing
GISC Status Report GISC Pretoria
GISC – GISC mutual backup Backup Status Remarks
GISC New Delhi Status Dr. S. L. Singh
GISC Exeter Status Report
RTH Exeter Status Report – 2014 (Doc 22)
GISC Beijing Status Report
GISC Exeter Status Report
Presentation transcript:

GISC Exeter Status Report - 2018 PowerPoint guidelines. Our refreshed PowerPoint style matches our refreshed corporate values. These guidelines ensure we achieve consistent, professional-looking presentations. Font: Arial only Bullets: Arial round Front page slide Headline text point size 53 Subtitle text point size 20 Presenter, location and date point size 12 Divider slides Should be used to break up subjects or when changing content Headline text point size 40 Content slides Headline text size: minimum 40 First Level Bullet Points 24 Subsequent Level; Bullet Points 20 Body text size: minimum 16 Printing Please select greyscale when printing, this will remove the backgrounds and save on ink. Colour Web safe green #CFF33 (R204, G255, B51), can be used to highlight important words or phrases. Web safe red #ED2939 (R237, G41, B57), can be used to highlight severe weather warnings Campaign presentations If your presentation is part of a campaign or event then please ask the studio for assistance GISC Exeter Status Report - 2018 TT-GISC Casablanca, 18th to 20th September 2018 Mark Francis © Crown copyright Met Office

Contents GISC/RTH Exeter Status Report Area of Responsibility – DCPCs and NCs AMDCN connectivity Training – Capacity building activity Operational issues in last period GISC Back up and activities Traffic size and volumes, uptime, user registration Changes in GISC, including new features since last meeting Outlook (planned changes/improvements) Any other items of interest © Crown copyright Met Office

Area of responsibility - DCPCs European Centre for Medium-range Weather Forecasting Global Climate Observing System - Lead Centre for Antarctica (BAS Cambridge) Global Production Centre/Long-Range Forecasting Marine Observations Centre MEDARE, Spain (backup) Opera Data Centre Regional Specialised Meteorological Centre - Geographical Specialised Ocean/Wave Centre Volcanic Ash Advisory Centre (London) World Area Forecast Centre (London) Just a list of the DCPCs who have registered GISC Exeter as either their primary or backup GISC. © Crown copyright Met Office

Area of responsibility - NCs National Met Centres: Iceland, Ireland, Netherlands, United Republic of Tanzania Denmark (backup), Luxembourg (backup), Spain (backup) WSO: Ascension Island, Bermuda, Gibraltar Pitcairn Island, St Helena Island Again, just a list of NCs with GISC Exeter as their primary or backup GISC. © Crown copyright Met Office

AMDCN connectivity Connections to GISCs: Connections to NCs/NMCs: Over RMDCN: Melbourne, Moscow, New Delhi, Offenbach, Pretoria, Seoul, Tokyo, Toulouse Over the internet: Brasilia, Offenbach (backup), Toulouse (backup), Washington Connections to NCs/NMCs: Brussels, Copenhagen, De Bilt, Dublin, Lisbon, Madrid, Montreal, Oslo, Reykjavik, Rome Dar es Salaam, Montreal (backup), Rome (backup) Repeat of the table. Currently migrating all TCP socket connections over to FTP, on the advice our IT security department. Working with Copenhagen, De Bilt and Oslo at present. Increased use of the internet to provide hot or cold backup to RMDCN connections. © Crown copyright Met Office

Training – Capacity building activity In June 2017, Met Office and Météo-France held a “Metadata and User” training course at Météo-France headquarters in Toulouse. This was aimed at the representatives of the NMCs in our joint areas of responsibility. © Crown copyright Met Office

Operational issues in last period One significant operational issue to report for GISC Exeter in the past 12 months. Failure of the operational GISC environment required a complete rebuild of the servers. GISC Exeter had 85% availability between September 2017 and August 2018, with a major outage lasting several weeks in May and June. 99.99% availability for WMO message switch – 31 minutes outage between September 2017 and August 2018. 99.99% availability for WMO file switch – 49 minutes outage between November September 2017 and August 2018. Not a lot to say here – just a statement of fact. © Crown copyright Met Office

GISC Back up and activities Functional backup arrangement with GISC Toulouse. NCs and DCPCs in the Met Office and Météo-France areas of responsibility are implementing backup connections to their backup GISC to ensure continuity of global data exchange. De Bilt, Dublin and Reykjavik all working on backup connections to Toulouse. We already have connections to a number of Toulouse’s NCs. © Crown copyright Met Office

Traffic size and volumes, uptime, user registration Daily traffic statistics: Ingesting 11GBytes of Essential data into 24hr Cache. Metadata catalog contains 101,356 records. Daily catalog synchronisation with GISCs & DCPCs: Beijing, Brasilia, ECMWF, Jeddah, Melbourne, Moscow Offenbach, Seoul, Tehran, Tokyo, Toulouse and Washington. 85% availability between September 2017 and August 2018. SLA for the GISC service at Exeter is 99.8% availability. 13 registered users © Crown copyright Met Office

Changes in GISC, including new features since last meeting OpenWIS development: Software development is being carried out as a collaboration involving all members of the association. Latest release brings additional capability and bug fixes. Development includes changes to GeoNetworks that will be committed back to the trunk version. Software built nightly and a suite of automated tests run against the build. Following development activity by the OpenWIS Association, version 3.14.5 was installed on the Exeter GISC. This version brought significant security fixes and enables the redeployment of the application using Puppet. © Crown copyright Met Office

Outlook (planned changes/improvements) Met Office working on enhancing the data delivery capability of its GISC solution. OpenWIS Association approved the roadmap for OpenWIS Core and have agreed: To focus our efforts towards WIS 2.0. To conduct three or four pilot projects over the next 12 months. The pilot projects will focus on demonstrating the benefit for the users of WIS 2.0. The current version of OpenWIS will be maintained but future development focussed on WIS 2.0. © Crown copyright Met Office

Any other items of interest Taking part in the pilot project to synchronize GISC cache through the cloud. Acting as proxy for Pretoria & Washington. Metadata and User training took place in June 2017, at Météo-France headquarters in Toulouse. © Crown copyright Met Office

Any questions? © Crown copyright Met Office